Flow Assurance for 8” trunkline from GGS III(Gamij) to GGS I(Gamij) to GGS (Ramol)

Flow Assurance for 8” trunkline from GGS III(Gamij) to GGS I(Gamij) to GGS (Ramol). A Case Study. Area IV: Gamij Field. The Challenge.

Download Presentation

Flow Assurance for 8” trunkline from GGS III(Gamij) to GGS I(Gamij) to GGS (Ramol)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Flow Assurance for 8” trunkline from GGS III(Gamij) to GGS I(Gamij) to GGS (Ramol) A Case Study

  2. Area IV: Gamij Field

  3. The Challenge • Due to oil being received via both flow lines and(termed ‘inside’) and via tankers (termed ‘outside’) there is wild variation in input crude oil conditions due to uncertainty in ‘outside’ crude oil quality • Presence of very high water cuts at the input end due to regular hot water flushing jobs carried out at the wells due to which conventional flow improver technology fails

  4. GAMIJ TO RAMOL CRUDE OIL JOURNEY

  5. Effect of Flow Assurance Chemical on Rheological Parameters( Dynamic Viscosity and Pour Point)

  6. Effect of Flow Assurance Chemicals on Line Pressure during peak winter conditions

  7. Increasing trend in daily production of Oil received and Ramol GGS Liquid production(m3/day)

  8. Benefits observed

  9. Certificate of successful Flow Assurance