1 / 10

Status of the Spanish synchrotron

Status of the Spanish synchrotron. David Beltrán Laboratori de Llum Sincrotró LLS. 18 -J une -2003. Overview. General status of the Spanish synchrotron. Status of the control system. General. Group officially created. Land for the synchrotron decided. Election of the new director.

dot
Download Presentation

Status of the Spanish synchrotron

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the Spanish synchrotron David Beltrán Laboratori de Llum Sincrotró LLS 18-June-2003

  2. Overview • General status of the Spanish synchrotron • Status of the control system

  3. General Group officially created Land for the synchrotron decided Election of the new director

  4. General Collaboration with other countries: France,... Meeting to decide the 5 beamlines in Menorca 1st, 2nd, 3rd October

  5. General Latticeredesign TBA 12 cells DBA 16 cells Top-up injection 3 GeV

  6. Control system A proposal for modelling the control system of the Spanish synchrotron David Beltran (LLS), Manuel Gonzalez (CERN) Acknowledgement to Andy Goetz (ESRF)

  7. Control system Actors: Users, equipment User requirements Use Cases

  8. Control system Package organization: • Application specific: Injection, RF • Application independent: EPICS, Spec • System software: Linux, RTEMS

More Related