An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lake Okeechobee StatusLake OkeechobeeWRAC Committee David Unsell, PE March 28, 2007

  2. Water Quality – Total Suspended Solids

  3. Water Quality – Total Phosphorus

  4. Algal Blooms and Toxins

  5. Submerged Aquatic Vegetation

  6. Monthly Submerged Aquatic Vegetation Transect Sampling OBJECTIVES: To understand changes in SAV communities as they relate to changes in water level and transparency

  7. Submerged Aquatic Vegetation Transect Sites

  8. Submerged Aquatic Vegetation Transect Sites

  9. Submerged Aquatic Vegetation Transect Sites

  10. March 07 Dry Conditions January 07 February 07

  11. Exotic Vegetation Management

  12. In-Lake Restoration Projects • Provided cost share funds of $450,000 to the City of Pahokee for Pahokee Harbor.  • Selected sites in and around the Clewiston lock to plant native pond apple and cypress along the pass and rim canal spoil islands while water levels are low.   • Developed a Cooperative Agreement with the Florida Freshwater Fish and Game Commission to conduct sediment removal in the Cody's Cove area of the remnant organic berm on the NW marsh shoreline. • In discussions with the City of Belle Glade for navigational dredging and boat ramp extensions in the Belle Glade marina

  13. Temporary Forward Pumps • Notice to Proceed with installation was issued to Lucas Marine Construction on March 21, 2007 • April 4 the S351 pumps are ready to operate • April 11 the S354 pumps are ready to operate • April 18 the S352 pumps are ready to operate

  14. Temporary Forward Pumps • Denise Arrieta, Construction Project Manager, 561-719-7572. • Tim Carter, Construction Division Director, 561-951-2543. • Cled Weldon, Engineering Department Director, 561-719-7573