1 / 12

PARIS – WAWebDMR Progress Report for Water Quality Partnership

PARIS – WAWebDMR Progress Report for Water Quality Partnership. March 17, 2011. Number Permits by Type. Industrial, Construction & Municipal. Boatyards, CAFOs, Fruit Packers, Sand & Gravel, Hatcheries, etc. Municipal and Industrial. Municipal to ground and Industrial to ground or POTW.

dragon
Download Presentation

PARIS – WAWebDMR Progress Report for Water Quality Partnership

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PARIS – WAWebDMRProgress Report forWater Quality Partnership March 17, 2011

  2. Number Permits by Type Industrial, Construction & Municipal Boatyards, CAFOs, Fruit Packers, Sand & Gravel, Hatcheries, etc. Municipal and Industrial Municipal to ground and Industrial to ground or POTW

  3. Why new systems? • Current technology - increase e-business • Greater communication with permittees • More data transparency • Designed for current permits • Multiple permits per facility & General permits • All permit types can enter DMRs electronically • Helps reduce DMR backlog (General Permits) • Goal of above: increased compliance, efficiency, service to clients

  4. Why new system (technical)? • Integrates with existing enterprise databases • Incorporate strong business rules • Enforces data entry validation routines • Opportunity to clean (improve) data • Uses secure system for electronic submittals • SAW and CROMERR

  5. Integrated Data Systems

  6. Milestones • PARIS & WAWebDMR released April 19 • Quarterly non-compliance reports (ISWGP) • Almost 700 facilities signed up for WAWebDMR • First permit type to required Electronic DMR submittals Construction Stormwater • Training for internal staff in PARIS • Training for facilities in WAWebDMR • External PARIS released February 2011

  7. Lessons Learned • Build system for all roles of users to enter data • Increases data accuracy • New architecture = new roles = new processes • Major system change = Major data cleaning • Be aware and honest about the difference between WPLCS vs PARIS entered data • Auto-generated reports to permittees • Check name for application (WebDMR – WAWebDMR) • Change is hard

  8. Accelerate Use of WebDMR • Ohio example 90 + % usage in 6 months • Marketing and support • New staff person • Construction Stormwater Permit • Required to submit DMRs electronically • Classroom training for permittees • More on-line help

  9. Future Commitments • Gradually require use of WAWebDMR • More training (WAWebDMR) • Bulk upload of DMR data for facilities • Additional non-compliance letters for GP • E-application for CSW (NOI) • Re-establish data flow to EPA (PCS) • Generate DMRs electronically (even for those submitting on paper)

  10. Links Public version of PARIS WebWPLCS

  11. Questions ?

More Related