Texas Nodal EMS Forced Outage Detection Business Requirements Document Carlos Gonzalez-Perez – August 21 st , 2006. Document Contents. Proposed System Scope As is and To be Sub processes Assumptions and Dependencies Definitions and Acronyms Functional Requirements Supplementary Requirements

Download Presentation

Document Contents

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Texas NodalEMS Forced Outage DetectionBusiness Requirements DocumentCarlos Gonzalez-Perez – August 21st, 2006 http://nodal.ercot.com 1

  2. Document Contents • Proposed System Scope • As is and To be Sub processes • Assumptions and Dependencies • Definitions and Acronyms • Functional Requirements • Supplementary Requirements • Sub-Process Coverage • Protocols Coverage • FOD Activity Map http://nodal.ercot.com 2

  3. Scope, Business Sub Processes and Assumptions • Proposed System Scope • FOD is a new application to detect and alarm unplanned status changes in transmission elements and generation resources • Business Processes impacted: • Operations Support Engineering • Outage Coordination • Business Sub process • The FOD function is not currently in place. NO As-If Process • No To-be Sub process generated for FOD • Assumptions: • The Network Real Time Operational Model used in the real time sequence is available to FOD. • Outage Scheduler (OS) DB is populated with up-to-date planned schedules • Telemetered Resource Status the same as in COPs • SCADA manual overrides will be available to FOD http://nodal.ercot.com 3

  4. Activity Diagram for Forced Outage Detection http://nodal.ercot.com 4

  5. Functional Requirements • FOD-FR1: Forced Output Input • Real Time Telemetry, OS and COP with resource status • FOD-FR2: Force Outage Cycle • The application will execute periodically. Period to be configurable • FOD-FR3: State Change Alarm • Detect and alarm for unplanned status change of Breaker/switch, Status for Resources, Transmission Lines, Transformers and Load disconnection • FOD-FR4: Forced Outage Detection • Detect change in status • Check for the outage in the OS. • Discrepancies of more than xx minutes indicate Forced Outage • Alarm/Display of forced outages • COPS used to distinguish between forced resource outage or shutting down generation • FOD-FR5: Resource Status Deviation • Checking conflicts in the resource status against COPS, OS, and Resource Status from SCADA. • FOD-FR6: Force Outage Display. According to outage type and other custom filtering • FOD-FR7: Forced Outage Continued Alarming. Alarm is generated when the Forced Outage is detected and not corrected in the OS after 2 hours. The alarm is persistent every 15 minutes • FOD-FR8: Forced Outage and QSE Performance Reporting Input. FOD outputs need to be archived for audit and reporting purposes. http://nodal.ercot.com 5

  6. Supplementary Requirements • FOD-SR1: No degradation of Performance. • Automatic re-starting • FOD shall finish processing before the end of each cycle • FOD-SR2: Interfaces • SCADA • Outage Scheduler • COP • FOD-SR2: User Interface • Special displays will be generated for FOD http://nodal.ercot.com 6

  7. Protocol Coverage http://nodal.ercot.com 7