1 / 5

CSIS 4850: Senior Project Fall 2008 Scope Statement and Project Plan

CSIS 4850: Senior Project Fall 2008 Scope Statement and Project Plan. Your Project Each group will play various roles throughout the development of the project.

dreama
Download Presentation

CSIS 4850: Senior Project Fall 2008 Scope Statement and Project Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSIS 4850: Senior Project Fall 2008 Scope Statement and Project Plan

  2. Your Project Each group will play various roles throughout the development of the project. This semester, one projects has project supervisors (Customer). Please work with your project supervisor/client on a development plan outlining, among other, the project scope and project plan as per the posted Development Plan template. Assume the role of the Analysis Team to analyze gathered customer requirements and derive the Software Requirements Specifications (SRS). Assume the role of the Design Team to derive Software Design Document (SDD). Assume the role of the Development Team to implement the system.

  3. What is Scope Statement? It is a relatively brief and precise description of the system to be developed. It is derived from customer meeting documents and/or use-case scenarios. Among others, it includes the followings information: - Need/justification/background statement - input and output data - Basic functionality of the system (obvious requirements) - Constraints and limitations that may be applicable to data and functions - Deliverables and Project Plan (Gantt chart and timetable of milestones and deliverables) - Others… (see posted article “Writing a Scope Statement”)

  4. Scope Statement and Project Plan - URLs Examples of scope statements. Some are very brief others are too elaborate. Your scope statement should reasonably and adequately describe your project system. http://www.ncccs.cc.nc.us/IT_Projects/docs/Data Warehouse/Phase I/dw_project_scope_statement.pdf http://www.cs.usask.ca/resources/tutorials/csconcepts/1999_9/tutorial/html/intro/2-2.htm http://home.att.net/~tkbowler/PSS.htm http://www.ucsf.edu/its/planning/infrastructure_scope.html http://www.tensteppb.com/5.0ProjectScopeManagement.htm http://www.enr.state.nc.us/its/pdf/PMHandbk/scope.pdf

  5. Software Develop Plan Each team will develop a Software Development Plan. The plan meets milestone #1 stated in the course syllabus. A revised RUB template is posted on the Templates page. Feel free to use other SDP templates on this site: http://jdbv.sourceforge.net/RUP.html Software Development Plan - due date: TBD. Please bring printed professional copy of your SDP to class.

More Related