Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority Office 512-852-7261 Cell 512-563-4891 Rickey.Green@capmetro.org Eighteen years in the Transportation industry: • General Railway Signal – Engineering Supply; • Federal Railroad Administration – Regulatory; • DMJM+Harris Consultant – Transportation Engineering (DART) • Capital Metropolitan Transit Authority – Public Transit Agency (Austin, TX) Education: • MA – Transportation Management “with a concentration in security management” (American Public University); • BS – Multidisciplinary Studies (Rochester Institute of Technology) • PMP – Project Management Professional certification
PRESENTATION OVERVIEW HISTORY PROJECT DESCRIPTION OPERATING METHODOLOGY SIGNALIZATION
Cars Shipped = 41,000 CMTA Rail System CMTA RAIL LINE UPRR RAIL LINE 162Track Miles Crushed Aggregate LLANO Union Pacific RR UP R.R. AUSTIN JCT. GIDDINGS
Public Referendum • November 2004 • 33 Track Miles • 9 Station Platforms • Single Track • 6 DMU’S • Rail Maint. Facility • 16,000 Sqr. Feet PROJECT OVERVIEW
Passenger Corridor Rail Stations Leander Lakeline Howard Burnet Crestview Highland ntown MLK, JR. Downtown Plaza Saltillo
RAIL MAINTENANCE FACILITY 16000 Square Feet
CTC Signal Project • Phased Procurement Process. • Design; • Material Purchase; • Installation; • Design Basis Temporal Separation. • 18 Control Points • 9 Intermediate Signals; • 6 Split Point Derails. I
Signal Instrument House Communications. • DCS Interface; • Cellular Network; • Future Fiber.
Grade Crossing Upgrade Project 70 Public Crossings in Passenger Corridor; Project Cost Approximately $ 5 Million; Phased Procurement Process. Design; Material Purchase; Installation.
Grade Crossing Upgrade Project Private Crossings in Passenger Corridor (15); Private Crossing Risk Mitigation. Permanently Close Where Possible; Control Access ; Signalize.
Grade Crossing Treatments Capital Metro Is Proactive Approach to Risk Mitigation; Crossing Markings Upgrade; Signage Upgrade; Community Outreach; Operation Lifesaver; Fencing Program.
Existing Quiet Zones Crystal Falls Avery Ranch Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Crestview Wooten
Cedar Quiet Zone Cedar Park • BMC • Brushy Creek • Park St. • Discovery Blvd. • FM 1431 • New Hope Rd. • Blockhouse Rd. Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd
CMTA PH-4 Quiet Zone • Gracy Farm • MOPAC • Adelphi • Oak Creek • Mc Neil Dr. • Mc Neil Merrill Town • Mc Neil Round Rock Phase 4 Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd
Cherry Wood Quiet Zone • IH -35 @ 38 ½ ST. • Wilshire Blvd. • 38 ½ ST • Cherry Wood • Manor Rd. • MLK Blvd. • 12 th ST. • Rosewood Ave. • Webberville Rd. Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Cherry Wood
Cherry Wood Quiet Zone • 7th ST. • 7th ST. • Pedernales ST. • Robert Martinez • Chicon ST. • Comal ST. • Navasota ST. • Waller ST. • IH-35 4th ST. Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Cherry Wood
Final Quiet Zone Map Crystal Falls Cedar Park Avery Ranch Phase 4 Crestview Wooten Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd Cherry Wood
Final Quiet Zone Map • Quiet Zone Establishment • Jurisdictional Authorities • Board Approval (ILA’s) • City of Austin • Design SSM • Coordination FRA • Extend Current Zones Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd
Community Outreach Ohelen Wooten Ped Anderson Ln Morrow Lamar Blvd