1 / 73

The Railways as Parents of a City

The Railways as Parents of a City. The building of three railways as the primary catalyst for the birth of the City of Red Deer. Central Alberta Historical Society Red Deer May 15, 2013. The North-South Corridor.

druce
Download Presentation

The Railways as Parents of a City

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Railways as Parents of a City The building of three railways as the primary catalyst for the birth of the City of Red Deer Central Alberta Historical Society Red Deer May 15, 2013

  2. The North-South Corridor • The City of Red Deer owes its location and position as the transportation and distribution centre of Central Alberta to a great extent to the building of and decisions made by the various railways in its early years • Other communities in Central Alberta often prospered or perished, as well as their locations determined by the coming of the railway • For more than 60 years, the railway stations in numerous communities were the focal point for transportation and communication, and to some extent, the social and business fabric of towns large and small

  3. Prologue

  4. The North-South Corridor • Part of an ancient natural ice-free corridor as last ice age was ending 10,000 years ago • First inhabitants around 3,000 BC • Includes several First Nations north-south transportation corridors • Abundance of water, timber, wildlife • Ancient Old North Trail extends from southern U.S. to Alaska through Central Alberta

  5. The North-South Corridor • Old North Trail loosely-defined series of foot paths that had winter and summer routes used by First Nations tribes and later by fur traders • Central branch crossed Red Deer River at ‘The Crossing’ west of Red Deer or alternately near Innisfail • West branch along foothills of Rockies • Wolf Track extended from Edmonton area to near present-day Lacombe to Rocky Mountain House

  6. North-South Corridor • In the south, trade route developed from Fort Benton, Montana to Fort Whoop-Up (Lethbridge) • NWMP arrived 1875, set up Fort MacLeod and Fort Calgary, linking the two posts with a trail using portions of Old North Trail • Little to no settlement in Central Alberta

  7. East-West Corridor • Fur trading posts and missions developed along the North Saskatchewan River corridor using river to move goods • Carlton Trail linked Winnipeg and Edmonton • Settlements developed at Fort Edmonton, St. Albert, Fort Saskatchewan, Rocky Mountain House and several other locations along corridor

  8. Beginnings of the Calgary-Edmonton Trail • McDougalls built crude 450-km road from Edmonton to Morley 1873 via Red Deer Crossing and Lone Pine (near Bowden) • NWMP built road from Fort Calgary to Lone Pine 1875 (now Hwy 2)

  9. Evolution of the Calgary-Edmonton Trail • C & E Trail becomes extension of Fort Benton trade route through Fort MacLeod to Fort Calgary to Fort Edmonton

  10. Arrival of the CPR in Alberta

  11. Northern Route Identified • Original proposed route of transcontinental railway was surveyed farther north than ultimately located where there were already settlements and the area was more suitable for agricultural development; route located south of South Saskatchewan River and north of Battle River; telegraph line built • Southern route ultimately chosen, in part to discourage U.S. railways from branching northward

  12. Arrival of CPR in Calgary • The Canadian Pacific Railway reaches Calgary in 1883.

  13. Arrival of CPR in Calgary • Wagons line up to deliver goods north to Edmonton as Calgary-Edmonton Trail gains significance and replaces Carlton Trail to move goods and people from eastern communities

  14. The Calgary-Edmonton Trail

  15. Red Deer Crossing • The Calgary-Edmonton Trail gains significance in 1883 but still very few settlers between Calgary and Edmonton • Small community begins at Red Deer Crossing 1883 • Series of stopping houses develop along trail including Lone Pine, Poplar Grove, Cache Creek, Blindman and Bartlett’s

  16. The Calgary-Edmonton Trail • Crude stagecoach service carries mail, goods and passengers 1883-91 • Trip takes 4 to 5 days requiring use of stopping houses along the way • One-way fare $25 (a good wage was $2 per day)

  17. Key Decision Makers that formed Red Deer’s future

  18. John T. Moore • Managing Director of the Saskatchewan Land and Homestead Company. Visits Red Deer 1881. Company purchases 115,000 acres of land around Red Deer in 1882 at $2/acre • Moves to Red Deer in 1901 and secures charter for Alberta Central Railway • Elected to Legislative Assembly 1905

  19. Rev. Leonard Gaetz • Arrives in Red Deer in 1884 from Ontario as an agent for the Saskatchewan Land and Homestead Company. First to homestead at current townsite near mouth of Waskasoo Creekwith wife and 10 children. Purchased surrounding land to increase property to 1200 acres.

  20. James Ross • Manager of contracting company hired in 1883 to complete CPR from Swift Current to Craigellachie, BC • President of Calgary and Edmonton Railway Co. and Calgary and Edmonton Land Co. • President of Dominion Bridge Co.

  21. William Mackenzie & Donald Mann • Partnered with James Ross and Herbert Holt to built several railways including Calgary and Edmonton Railway. • Began railway network in Western Canada in 1895 which would become Canadian Northern Railway

  22. The Calgary and Edmonton Railway

  23. The C & E Railway • First charter in 1885 • New charter 1890 • Principals included James Ross, Herbert Holt, William Mackenzie, Donald Mann • 3 crossing of Red Deer and Blindman Rivers surveyed (The Crossing, mouth of Blindman River, west of Innisfail)

  24. The Calgary & Edmonton Railway • James Ross accepted proposal by Rev. Leonard Gaetz for half-interest in his property for townsite and bridge crossing • Rail line built from Calgary to south of Red Deer by November 1890 (4 months) • First lots went on sale in new townsite January 1891 • Settlers at Crossing moved to new townsite

  25. The Calgary & Edmonton Railway • Timber bridge built across Red Deer River 1890-91

  26. The Calgary & Edmonton Railway • Rail line completed to Strathcona July 1891 (no direct connection with Edmonton)

  27. The Calgary & Edmonton Railway • C&E Railway was built with the intention of leasing it out to an operator (presumably CPR) • CPR leased line for 6 years with option to renew • CPR assumed operation of the C&E August 1891, named communities and built facilities for operation

  28. The Calgary & Edmonton Railway • Combination station and freight house built 1891 in 3 weeks to replace temporary boxcar • Similar stations built at Innisfail, Olds, Lacombe, Ponoka and other towns (including south of Calgary) to replace small temporary stations or boxcars

  29. The Calgary-Edmonton Corridor

  30. The Calgary & Edmonton Railway • First passenger trains ranbetween Red Deer and Calgary in the spring of 1891 • Regular passenger service between Red Deer and Edmonton starts 1892 • Travel time reduced to 12 hours by train from 4 days by stagecoach • One way fare $10 Calgary-Edmonton (Strathcona) • Mail service by rail marked end of stagecoach service on Calgary and Edmonton Trail

  31. Red Deer Becomes Railway Town

  32. The Calgary & Edmonton Railway • By 1900, the C&E Railway is the most profitable railway of its size in Canada • Population of Red Deer in 1901 at 323, similar to or smaller than, populations of Lacombe and Innisfail • In 1905 CPR expands Red Deer yards and opens two branchlines originating in Red Deer – Lacombe to Alix and Wetaskiwin to Camrose • Red Deer population mushrooms to 1,500

  33. The C & E Railway Expansion • Lacombe to Alix branch extended to Stettler 1906 with immediate passenger service to Red Deer • Wetaskiwin to Camrose extended to Hardisty in 1906, crew originates at Red Deer

  34. The Calgary & Edmonton Railway • Ornamental station park gets started • 4-stall roundhouse and stockyard built 1906

  35. The Calgary & Edmonton Railway • Upgrades to facilities included 70-foot turntable and expansion of roundhouse to 10 stalls • Construction of elevated gravitational timber coal tipple 1907 dominated skyline • CPR became primary employer, customer and supplier for town and remained so for decades

  36. Competition for the CPR

  37. Canadian Northern • Mackenzie and Mann acquire Edmonton, Yukon and Pacific Railway 1898; built Low Level Bridge 1900 • Canadian Northern Railway (created by Mackenzie and Mann 1899) links with Strathcona 1902 • East-west CNor line reaches Edmonton 1905

  38. Canadian Northern • Canadian Pacific signs 999 year lease with C&E Railway 1901 to prevent takeover by Canadian Northern • CNor incorporates Alberta Midland and Canadian Northern Western Railways 1909

  39. Red Deer Becomes CPR Division Point

  40. The Calgary & Edmonton Railway • Various improvements since 1905 indicate something big on the horizon • CPR negotiated arrangement with town for double the amount of water • Red Deer officially announced as divisional point in 1908 establishing Red Deer as the distribution and transportation centre of Central Alberta

  41. The Calgary & Edmonton Railway • Preparation for new bridge started in 1906 • New 2-span steel bridge (300 ft) replaced 3-span timber bridge 1908

  42. The Calgary & Edmonton Railway New station built at head of Ross Street 1910

  43. The Calgary & Edmonton Railway New station, relocated original station used for freight house, and ornamental park (elevated gravitational coal chutes in background)

  44. The Alberta Central Railway

  45. Alberta Central Railway • ACR chartered 1901, led by John T. Moore, with headquarters in Red Deer • Yellowhead Pass to Moose Jaw and Hudson Bay via Red Deer and Saskatoon

  46. Alberta Central Railway Sir Wilfrid Laurier arrived at Red Deer CPR station August 10, 1910 (note 1892 station still in use)

  47. Alberta Central Railway Sir Wilfrid Laurier(with John T. Moore) drives first spike for Alberta Central Railway in south Red Deer east of C&E Railway August 10, 1910; construction begins from C&E Railway at Forth (south of Red Deer) east to Mountview; yard and station built, line graded to Pine Lake

  48. Alberta Central Railway The ACR crossed the Calgary & Edmonton Railway (CPR) and Waskasoo Creek 1911 at Forth (south Red Deer) connecting Mountview and Westpark for westerly expansion

  49. Alberta Central Railway Construction of 2,112’ long, 110’ high steel trestle at Mintlaw began in 1911

  50. Alberta Central Railway Mintlaw trestle completed fall 1912 longest existing rail structure in Central Alberta, 3rd longest steel trestle in Western Canada, top 10 longest railway bridges in Western Canada