1 / 9

MAX400 Interactive Performance Solution

MAX400 is an interactive performance solution that tackles system slowdown issues. It offers a cost-effective alternative to buying additional hardware. This software enhances interactive capacity on IBM AS/400 systems, optimizing CPU distribution. Verify MAX400 with a trial license code from the website. Contact Wiseco Consultants Limited for pricing and leasing options.

dsharpe
Download Presentation

MAX400 Interactive Performance Solution

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. max400.net maximum interactive

  2. Green Screen,Interactive Tax(an artificial performance barrier) 1. System slow , inadequate, users complain of slow response times –Traditional solution  Buy additional interactive from HW supplier or IBM ( what is the cost of the interactive card/feature ?) E.g. 170 and 270 models showing total CPW Vs Interactive CPW per model • 2. + Cost of Software subscription /maintenance (DB2, OS400, Compiler etc..) • this can be higher than the cost of interactive card/feature. E.g. in the example above, 170-2176 is a P10 but a 170-2183 is a P20 (the only difference being the amount of interactive)

  3. maximum interactive • M400A (V4R4+ ) in 200+ customer sites • M400B (V4R1 – V4R3) (Unique to MAX400 – no one else does this) • Software download - less than 50K zipped. • FTP and restore on AS400 (5 minutes) • Get trial license code from max400. • Run/Test (see FAQ section of website)

  4. How do I verify that max400 works? • The customer is perhaps experiencing system slowdown already due to interactive limit being reached. Operating max400 on that system will bring immediate relief. • Alternatively they can verify max400 working by completing the following test described at : http://www.max400.net/faqs2.htm Example of how this test would work on say a 170-2291 model which has 25 Interactive CPW , out of a total of 115 CPW. Here the interactive CPW is approximately around 22% of total machine capability. (SEE FOLLOWING SLIDES, example of screens 1-4) • When you start the 2 CL programs in a ‘loop’ as described , initially the 2 jobs will consume around 50% of CPU. • Then CFINT will ‘commence’, slow the CL jobs down and reduce CPW usage of these jobs to around 22% , which is the ‘limit’ of that machine. • Now, starting max400 will increase the CPU to around 50% each on these 2 jobs.

  5. Example of max400 working (Part 1 of 4) This shows the system-wide CPU usage when no jobs are running.

  6. Example of max400 working (Part 2 of 4) The looping CL program is then called from two sessions. They each receive about 50% of CPU.

  7. Example of max400 working (Part 3 of 4) After some time, CFINT01 becomes active and slows the interactive sessions down. In this case they each get about 10% and CFINT01 takes about 80% of CPU.

  8. Example of max400 working (Part 4 of 4) Now MAX400 is started and the jobs return to receiving the full amount of CPU available.

  9. max400 tunes your interactive jobs • License is essentially by P Group • Our software is leased.  The current terms of lease are: 6 months , 1 year , 2 years , 3 years  Please contact Max400’s Hong Kong distributor Wiseco Consultants Limited directly for a price quote. Permanent key is granted once payment is made/cleared. Wiseco Consultants Limited 2F Tomey House, 131-133 Queen’s Road Central, Central, HK Tel: (852) 2544 3318 Fax: (852) 2544 3718 eMail: sales@hkwiseco.com

More Related