Chisholm Trail Parkway: Section 1

Chisholm Trail Parkway: Section 1 Compacting backfill for trench on drainage line east of University Dr. Chisholm Trail Parkway: Section 1 Drilling shaft for bridge foundation east of Forest Park Blvd. Chisholm Trail Parkway: Section 1

dunn
Download Presentation

Chisholm Trail Parkway: Section 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chisholm Trail Parkway: Section 1 Compacting backfill for trench on drainage line east of University Dr.

  2. Chisholm Trail Parkway: Section 1 Drilling shaft for bridge foundation east of Forest Park Blvd.

  3. Chisholm Trail Parkway: Section 1 Drilling shaft for bridge foundation south of Vickery Blvd.

  4. Chisholm Trail Parkway: Section 1 Removal of debris south of Vickery Blvd.

  5. Chisholm Trail Parkway: Section 1 Installation of 24-inch drainage line east of University Dr.

  6. Chisholm Trail Parkway: Section 1 Boring equipment used to install 30-inch drainage line under Forest Park Blvd.

  7. Chisholm Trail Parkway: Section 1 Placement of drainage line pipe line south of Vickery Blvd.

  8. Chisholm Trail Parkway: Section 1 Removing Vickery Blvd. concrete pavement east of Forest Park Blvd.

  9. Chisholm Trail Parkway: Section 2 Traffic signal installation at the intersection of Hulen Street and Vickery Blvd.

  10. Chisholm Trail Parkway: Section 2 Completed drilled shaft foundations for bridge over Trinity River

  11. Chisholm Trail Parkway: Section 2 Excavation around completed drilled shaft foundations

  12. Chisholm Trail Parkway: Section 2 Excavation for Trinity River bridge drilled shaft foundations

  13. Chisholm Trail Parkway: Section 2 Earthmovers staged to prepare the right of way

  14. Chisholm Trail Parkway: Section 2 Preparing right of way near Edwards Ranch Road

  15. Chisholm Trail Parkway: Section 2 Preparing right of way between Trinity River and UPRR’s Davidson Yard

  16. Chisholm Trail Parkway: Section 2 Preparing right of way and installation of drainage culverts

  17. Chisholm Trail Parkway: Section 3B Excavation for main lanes north of SH 183

  18. Chisholm Trail Parkway: Section 3B Assembling column forms for bridge over Overton Ridge Blvd.

  19. Chisholm Trail Parkway: Section 3B Aerial view looking south from Arborlawn Dr. to SH 183

  20. Chisholm Trail Parkway: Section 4 Constructing drilled shaft foundation for future bridge

  21. Chisholm Trail Parkway: Section 4 Excavation for Oakmont Blvd. detour construction

  22. Chisholm Trail Parkway: Section 4 Preparing to pour concrete for top of drainage culvert

  23. Chisholm Trail Parkway: Section 5 Performing dust control measures

  24. Chisholm Trail Parkway Exhibits with information about CTP are being placed in various locations in Tarrant and Johnson counties. This one is at the southwest Tarrant County sub-courthouse.

  25. Chisholm Trail Parkway: Section 6 Removal of large rocks in the project right of way at FM 1902 and CR 915

  26. Chisholm Trail Parkway: Section 6 Temporary drainage to channel storm water runoff at CR 920

  27. Chisholm Trail Parkway: Section 6 Crews working near State Highway 171 and Lake George Marti strip topsoil for construction along the CTP right of way