270 likes | 476 Views
Chisholm Trail Parkway: Section 1 Compacting backfill for trench on drainage line east of University Dr. Chisholm Trail Parkway: Section 1 Drilling shaft for bridge foundation east of Forest Park Blvd. Chisholm Trail Parkway: Section 1
E N D
Chisholm Trail Parkway: Section 1 Compacting backfill for trench on drainage line east of University Dr.
Chisholm Trail Parkway: Section 1 Drilling shaft for bridge foundation east of Forest Park Blvd.
Chisholm Trail Parkway: Section 1 Drilling shaft for bridge foundation south of Vickery Blvd.
Chisholm Trail Parkway: Section 1 Removal of debris south of Vickery Blvd.
Chisholm Trail Parkway: Section 1 Installation of 24-inch drainage line east of University Dr.
Chisholm Trail Parkway: Section 1 Boring equipment used to install 30-inch drainage line under Forest Park Blvd.
Chisholm Trail Parkway: Section 1 Placement of drainage line pipe line south of Vickery Blvd.
Chisholm Trail Parkway: Section 1 Removing Vickery Blvd. concrete pavement east of Forest Park Blvd.
Chisholm Trail Parkway: Section 2 Traffic signal installation at the intersection of Hulen Street and Vickery Blvd.
Chisholm Trail Parkway: Section 2 Completed drilled shaft foundations for bridge over Trinity River
Chisholm Trail Parkway: Section 2 Excavation around completed drilled shaft foundations
Chisholm Trail Parkway: Section 2 Excavation for Trinity River bridge drilled shaft foundations
Chisholm Trail Parkway: Section 2 Earthmovers staged to prepare the right of way
Chisholm Trail Parkway: Section 2 Preparing right of way near Edwards Ranch Road
Chisholm Trail Parkway: Section 2 Preparing right of way between Trinity River and UPRR’s Davidson Yard
Chisholm Trail Parkway: Section 2 Preparing right of way and installation of drainage culverts
Chisholm Trail Parkway: Section 3B Excavation for main lanes north of SH 183
Chisholm Trail Parkway: Section 3B Assembling column forms for bridge over Overton Ridge Blvd.
Chisholm Trail Parkway: Section 3B Aerial view looking south from Arborlawn Dr. to SH 183
Chisholm Trail Parkway: Section 4 Constructing drilled shaft foundation for future bridge
Chisholm Trail Parkway: Section 4 Excavation for Oakmont Blvd. detour construction
Chisholm Trail Parkway: Section 4 Preparing to pour concrete for top of drainage culvert
Chisholm Trail Parkway: Section 5 Performing dust control measures
Chisholm Trail Parkway Exhibits with information about CTP are being placed in various locations in Tarrant and Johnson counties. This one is at the southwest Tarrant County sub-courthouse.
Chisholm Trail Parkway: Section 6 Removal of large rocks in the project right of way at FM 1902 and CR 915
Chisholm Trail Parkway: Section 6 Temporary drainage to channel storm water runoff at CR 920
Chisholm Trail Parkway: Section 6 Crews working near State Highway 171 and Lake George Marti strip topsoil for construction along the CTP right of way