1 / 44

Microsoft Project 2010 http:// www.tomspictures.net/tomandkelly2

Microsoft Project 2010 http:// www.tomspictures.net/tomandkelly2. 50413 - Mastering Microsoft Project 2010 Instructor: Tom Vorves Dial In: 1 (800) 747-5150 International: 1 (303) 248-1290 Access Code: 6601011 . The Group. stmb@capgroup.com swilson@schiffhardin.com

dunn
Download Presentation

Microsoft Project 2010 http:// www.tomspictures.net/tomandkelly2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Microsoft Project 2010http://www.tomspictures.net/tomandkelly2 50413 - Mastering Microsoft Project 2010 Instructor: Tom Vorves Dial In: 1 (800) 747-5150International: 1 (303) 248-1290Access Code: 6601011

  2. The Group stmb@capgroup.com swilson@schiffhardin.com phil.morris@us.mcd.com pmooney@lynden.com pmclaren@lynden.com jwuerch@northlandservices.com hwolfgram@barriersafe.com

  3. Introduction: Mastering Microsoft Project • Describe how Project relates to the discipline of Project management. PMBOK • Know the significant new features of Project 2010. • Navigate to the primary views available using the Ribbon • Choose Views that display task, resource, or assignment information. • Select table within views to change the information that is available to see and edit. • Relate the features of Project to the 5 steps for building a plan in Project.

  4. A Quick and Easy Overview of Managing with Project • Create a new project and prepare it for data entry. • Enter project tasks. • Sequence the tasks. • Define resources. • Estimate Task duration and assign resources. • Baseline the project. • Track project progress.

  5. Setting Up a Project • Use multiple methods to create a new project, including opening an Excel file and a SharePoint Tasks list. • Establish one or more calendars to constrain resource availability. • Configure Project to calculate the schedule from the Start Date forward, or from the Finish Date backward.

  6. Lab: Setting Up a Project • Adding Holidays to the company calendar. • Making a custom calendar. • Setting the Project Start date. • Setting of the constraints.

  7. Schedule: Manual vs. Auto • Describe which project functions are turned off for tasks using Manually Schedule mode. • Change the task mode from Manually Schedule to Auto Schedule and back. • Identify tasks that are in Manually Schedule mode by the task mode column and shape on the Gantt chart. • Describe situations that are particularly appropriate for using Manually Schedule. • Describe the limitations that a user must be aware of when using Manually Schedule mode.

  8. Lab: Exploring Manual Schedule • Students practice switching tasks between Manual Schedule and Auto Schedule modes and identify the impact that makes on the project schedule and the individual tasks.

  9. Creating a Work Breakdown Structure • Build and use summary and subordinate tasks. • Understand and use milestones. • Develop WBS Outlines. • Assign completion criteria. • Evaluate the WBS. • Understand and use WBS templates.

  10. Lab: Manipulate a WBS • Creating notes within tasks. • Utilize Outline. • WBS Templates. • Using a Template. • Editing a Template. • Creating a Template.

  11. Identifying Task Relationships • Understand and use the types of task relationships. • Understand and use various methods to create relationships. • Determine and display task sequence. • Understand and use lag, lead, and delay.

  12. Lab: Display the sequence • Formatting Network diagram. • Modifying dependency lines. • Modifying items to be shown on the critical path.

  13. Defining resources within Project • Define individual resources that will be used on the project. • Record the cost(s) of using each type of resource. • Record the limit of availability for each type of resource by establishing a resource calendar and defining the maximum units of that resource.

  14. Lab: Resource Calendar and Availability • Add holidays to a standard calendar. • Applying calendars and analyze the impact to the project schedule. • Apply vacation schedules to a calendar. • Replacing resources based upon the resource’s calendar.

  15. Making Work Package Estimates • Enter estimates for duration and costs for each task. • Distinguish between task types and describe when each is appropriate. • Describe the relationship between work, units, and duration. • Describe the way Effort Driven scheduling is affected by work, units, and duration. • Assign tasks to resources using the Team Planner view.

  16. Lab: Work, Duration and Labor • Analyze the impact of duration, work, and labor. • Create material resources and assign cost to the resource. • Apply material resource to project and examine the impact to project costs.

  17. Creating an Initial Schedule • Calculate the Schedule: The Theory Behind the Software. • Critical Path. • Schedule Float. • Constraints. • Deadlines. • Task Relationships and Crashing a Schedule. • Milestones. • Task Inspector.

  18. Lab: Calculating an Initial schedule • Display float for all non-critical tasks. • Reviewing the impact to the Project plan. • Reviewing changes that can have a positive impact on the project plan.

  19. Create a Resource Leveled Schedule • Project Statistics. • Resource Graph and Resource Sheet. • Resource Usage View. • Resource Allocation. • Task Usage View. • Realistic Resource Planning. • Resource Leveling. • Leveling Settings. • Leveling Settings Defined - Leveling Calculations. • Leveling Settings Defined - Resolving Over-allocations. • The Leveling Gantt Demonstrates Results of Leveling. • Manual Leveling.

  20. Lab: Resource Leveling • Evaluate the project’s resource plan using the resource views. • Adjusting the schedule manually. • Adjust the schedule using the leveling feature.

  21. Managing the Project • Tracking Field Definitions. • Creating the Project Baseline. • Displaying the Baseline on a Gantt Chart. • The Tracking Gantt. • Recording Progress Using % Complete. • Updating Task and Resource Status. • Recording Progress Using Actual Work. • Variance. • Percent Complete. • Cost. • Evaluating and Displaying Variance. • Scheduling interruptions. • Splitting tasks. • Rescheduling Work.

  22. Lab: The Baseline • Using Project Statics to see the changes in your project plan. • Using the variance tables to understand the changes in your project plan.

  23. Lab: Baselining and Tracking Performance • Baseline the project. • Entering Actuals.

  24. Lab: Variance • Interpreting a variety of variance reports.

  25. Formatting Output and Printing Reports • Formatting the Timeline • Using the Gantt Wizard • Visual Reports • Standard Reports • Custom Reports • Editing a Custom Report • Reports • Grouping, sorting, and filtering • Copy Picture to Office Wizard • More Formatting for the Gantt Chart • Reporting Against Budget • Creating a Budget

  26. Lab: Reporting: Grouping • Create new fields • Create new groups • Create new views

  27. Lab: Reporting: Using Standard and Custom reports • Using standard reports • Create a custom report

  28. Managing Multiple Projects • Integrating Multiple Projects • Consolidating Project Files • Resource Pools • Summary

  29. Lab: Consolidation of Shared Resources • Leveraging shared resources across multiple projects

  30. Advanced Topics • Customizing WBS Prefix • Applying Grouping and Grouping customized Fields • Applying Filtering functions • Leveraging Global Templates • Identify resource delay within a Task • Applying Deadlines to a project

  31. Lab: Grouping • Grouping

  32. To-Do: Create a New Project File • Launch Project • All New Tasks are Auto-Scheduled • Set Project Start Date

  33. To Do: Modify the Project Calendar • Project Tab  Change Working Time • Enter the “Exceptions”

  34. To Do: Enter Tasks and Relationships • Enter a few tasks and Durations (keep durations under 5 days) • Insert a Task or Two • Link tasks • Chain button • Pred Column

  35. To Do: Add and Apply Resources • Add a resource at the Resource Sheet View (Left Side of Screen) • Go back to Gantt Chart • Use the Task Sheet, Last Column called Resource Names to Assign a resource

  36. To Do: Set a Baseline • Prepare: • Sequence Tasks • Assign Resources • Switch to the Tracking Gantt View • Switch to the Variance Table • Save the Baseline • Project Tab/Menu  Set Baseline • Observe the results • Change Tables: • Entry • Variance • Tracking

  37. To Do: Explore MS Project Templates • File Tab • New • Create from an Online Template (Download)

  38. To Do: Sync with SharePoint • File • Save and Send • Sync • L! URL http://spclass/jpmc3 • Outside: http://shareit.learnit.com/jpmc3 • ID: classroom\11-05 • Zaq123 • Tasks, Hey • Excel Need an Excel File using the TOP row as Column Headers • Well Named Headers • Data in the Excel File • File  Open  File Type = All Files  Select File  Open  Import Wizard

  39. To Do: Create a Calendar and then Apply it to the Project • To Create a Calendar or Modify a Calendar • Project Tab  Change Working Time • To Apply the Calendar to the Project • Project Tab  Project Information  Calendar Drop Down

  40. To Do: Modify Resource Calendar • Resource Sheet • Double Click on a Resource Name • Change Working Time Button • Enter Exceptions • Time Off • Time On – Type the Exception name  Details  Working Time • See the Results • Make sure a task duration extends a task through the said time off • Then Assign the Resource to the Task • Observe the Change in Schedule

  41. To Do: Create and Apply a Calendar for Tasks • Create a Calendar • Project Tab  Change Working Time  Create new calendar • Enter Exceptions and/or Modify Work Weeks • Apply to tasks(s) • Double the Task • Advanced Tab • Calendar  Select the New Calendar (Default = None)

  42. To Do: Display/Edit the Document Properties (Meta Data) • File Tab • Info • Project Information (on right side of screen) • Advanced Properties

  43. To Do: Create 4 Different Task Bars • Auto Scheduled • Manually Scheduled with Dates • Manually Scheduled without dates (ghosted) • Inactivate Task (Project Professional Only)

  44. Phil: Tom, I have a specific request for something I'd like to understand during this class, if possible: Phil: Master project with sub-projects managed by different PM's Phil: ...ability to show cross-project dependencies Phil: ...ability to display different views, specifically related to individual sub-projects while still displaying cross-project dependencies Phil: Also, how can we best represent such work (timelines and tasks) in SharePoint 2010 without Project Server?

More Related