An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Satellite-based navigation system:a pan-African infrastructure for integration and economic development Stefano ScardaEuropean Commission Africa-EU Infrastructure Partnership Third meeting of the Steering Committee Tunis, 7 April 2010

  2. SDCM GAGAN Satellite coveragearea Towards a worldwide SBAS coverage WAAS EGNOS EGNOSService Area MSAS Source: Stanford University

  3. Potential further coverage • Service coverage could be extended through deployment of sole ground infrastructure, sharing space segments of the existing systems Coverage scenario presented by the FAA (US)

  4. Benefits of SBAS in Africa • The economic opening-up of airports and isolated regions, by making regional airports currently not equipped with the traditional aid instruments (ILS, VOR, DME) accessible to national, intercontinental, and intra-continental flights • Facilitated exchanges with Europe, through the harmonisation of operational flight procedures between African countries and the rest of the world • Savings on investments at local level, by reducing drastically the need and maintenance costs of ILS-type ground facilities in the airports • Safer guidance during airport approaches • Positive and very substantial repercussions in other sectors, such as the rail transport, agriculture and the territory planning • Reduction of costs and greater reactivity for humanitarian interventions

  5. 37 % from Africa is 250km from an ILS equipped airport 87 % from Africa is 250km from a main or regional airport Impact on economic development and integration

  6. Total discountednet benefits (Discount rate of 8%) ~ 520€m Results of a Cost-Benefits Analysis The use of SABS for Africa can bring benefits for various economic sectors Total Net Present Value surpass 500€m over the 2012-2042 (30 years) period Millions of Euro 311

  7. Satellite navigation in the Africa-EU policies • SBAS in Africa is part of the First Action Plan (2008-2010) for the Implementation of the Africa-EU Strategic Partnership(Lisbon Summit, December 2007) • Reaffirmed by Vice-President Tajani at the African Union Open Day on Infrastructure (Addis Ababa, January 2009) • Included in the Communication from the Commission to the European Parliament and to the Council “Partnership between the European Union and Africa. Connecting Africa and Europe: working towards strengthening transport cooperation” (COM(2009) 301 final, 24 June 2009) Euro-Mediterranean Partnership and Neighbourhood Policy with North Africa Cotonou Agreement with sub-Saharan Africa Agreement on Trade, Development and Cooperation with South Africa

  8. Technical feasibility and users’ interest A demonstration of the use of EGNOS for advanced rail traffic management, on low-density rail lines, Gauteng, South Africa 2005 Temporary EGNOS reference stations installed in several African countries: Chad, Cameroon, Central African Republic, Congo, Ethiopia, Kenya, Zambia, Namibia and South Africa; flight testing took place during a East-to-West flight from Dakar to Mombasa on 19-20 May 2005

  9. Programme implementation steps • Preliminary studies • Cost Benefit Analysis • Programming (implementation and management plan) • Governance scheme • Political support • Funding • Implementation (Preparatory phase and infrastructure deployment) … - 2009 2010 2011- • Preparatory phase (2011-2013) • Build core of technical competences • Build a preliminary backbone infrastructure • Training activities • Infrastructure Deployment Phase (2012-2016) • Detailed system design • Deployment of stations across Africa • Service provision and operation 10th EDF Intra-ACP (proposed) ITF Others (to be defined)

  10. Thank you for your attention Further information: http://www.satellite-navigation.eu/