WiMax Status @ UCLA. Giovanni Pau UCLA gpau@cs.ucla.edu. Status. Connection to Mesoscale Infrastructure Openflow switches are purchased and delivered Backbone side Open Switch is Installed but yet to be confirgured
E N D
WiMax Status @ UCLA Giovanni Pau UCLA gpau@cs.ucla.edu
Status • Connection to Mesoscale Infrastructure • Openflow switches are purchased and delivered • Backbone side Open Switch is Installed but yet to be confirgured • BTS side there is a missing 20-25meters of fiber that need to be run cross floors, work order has been submitted on-hold for Facility Management to Proceed. • Installation of the Airspan BST • Location selected (Top o Spraul Hall) • Pole Installed • On Hold for • Power Supply • Network (we may go wireless on that) • FCC Related • Renewed Experimental License • Coordination with Clear Started GTTI Cagliari
Deployment Airspan BS will be on a 17 storey buildings which is built on a 150m hill. GTTI Cagliari
Envisioned Timeline • Connection to MesoscaleInfrastrucutre • 3-4 weeks depending on the Facility management • Preliminary setup of the VLAN (backbone side) could start in about 1.5 weeks. • Airspan Installation • About 4 additional Weeks • 2 Weeks to Power • 2 Weeks for Installation • Delays may come if Facility des not bring Power. • Experiments • Planning multiple-path network-coded tcp experiments with MIT • Once Connected to ION we will be able to run Nation Wide experiments. GTTI Cagliari