1 / 10

Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM)

Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM) . September 21, 2011. 1. 1. 2. 2. 4. 4. Kent Avenue Generating Station Site History . Operated 1905-1989 as power generating station (coal ash/water mixture pumped to ash pit); electric distribution until 1998

dympna
Download Presentation

Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM) September 21, 2011 1 1

  2. 2 2

  3. 4 4

  4. Kent Avenue Generating StationSite History • Operated 1905-1989 as power generating station (coal ash/water mixture pumped to ash pit); electric distribution until 1998 • Original Williamsburg power plant demolished in 1950s • Remaining power plant was abated for asbestos/lead paint and demolished in 2007-2009 • July 2010 Voluntary Cleanup Agreement (VCA) with NYSDEC for the entire Site • Former National Grid Manufactured Gas Plant (MGP) located adjacent to south property line

  5. GeoTube Process

  6. Kent Avenue Generating StationAsh Pit IRM – EH&S Features • Dust/Odor Control • Community Air Monitoring Program • Noise Mitigation • Site Security • Traffic Management • Surface Water Runoff Control • Spill Prevention/Containment

  7. Kent Avenue Generating StationAsh Pit IRM Tentative Schedule (2011-2012) • Site Preparation: Sept. 19 – Oct. 7 • Removal of Surface/Subsurface Structures: Oct. 4 – Nov. 25 • Removal/Processing of Contents: Oct. 7 – Dec. 13 • Closure: Dec. 5 – 21 • Removal of Temporary Facilities: Dec. 14 – Jan. 6 • Work Hours: 7:00 AM to 6:00 PM

  8. Kent Avenue Generating StationAsh Pit IRM QUESTIONS AND ANSWERS

More Related