An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress on EMS/OSH Objectives Photo of the Week E. Lessard Collider-Accelerator Department 5-17-11 Take 5 for Safety

  2. Mid-Year Check on EMS/OSH Objectives • Based on the Management Review last October, the following are the ESSHQ objectives and measures established at C-AD for FY11: • Greenhouse Gas Emissions, 3% reduction • Unneeded Materials and Chemicals, 3% reduction • Regulatory, 0 Notices of Violation, 0 Permit Exceedances • 0 Lost Workday Incidence • 0 Total Recordable Incidence

  3. Status as of 5-17-11 • Greenhouse Gas Emissions, 3% reduction – • Indirectly, see next slide • Unneeded Materials and Chemicals, 3% reduction – • C- Line and D line cleanup, some chemicals at 801 • 0 Notices of Violation, 0 Permit Exceedances • 0 Notices of violation from regulators • 0 Spills • 0 Lost Workday Incidence – • 2 DARTS • Injury from truck flip over (lost time) • Cut finger at TVDG (restricted work) • 0 Total Recordable Incidence – • 2 Recordable Injuries • See above

  4. DOE’s Site Sustainability Plan for BNL (GHG Reduction) • Install on-site renewable energy projects • Purchase renewable energy credits or carbon offsets as necessary • Temperature set-backs; more efficient office equipment • Long Island Solar Farm Project (32 MW PV array); install additional ~1 MW PV array for BNL • Solar powered traffic signals and parking lights; solar heating systems for B30 and B464 • Continue acquiring Alternative Fuel Vehicles: 20% CNG and 80% E85 for all acquisitions • Continue installing advanced meters for steam and standard meters for water • Cool roofs have been specified; R-30 has been specified • Continue to train more staff; update employee orientation programs to include sustainability • Research cost-effective SF6leak-detection devices • Improve infrastructure as funding permits • Use best management practices for water conservation

  5. Photo of the Week - Some rise by sin, and some by virtue fall (William Shakespeare)