1 / 12

Conveyance Structure

Conveyance Structure. San Gabriel River. Proposed Conveyance Structure Outlet. Proposed Conveyance Structure Inlet. 2D Cross-Section. Basin 1. Basin 2. Canal Gates. 2D Cross-Section. Water Table Elev. 157 ft. Bottom Excavation Elev. 144 Ft. Access Bridge. Mines Avenue Levee.

eara
Download Presentation

Conveyance Structure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conveyance Structure

  2. San Gabriel River Proposed Conveyance Structure Outlet Proposed Conveyance Structure Inlet 2D Cross-Section Basin 1 Basin 2 Canal Gates

  3. 2D Cross-Section Water Table Elev. 157 ft BottomExcavation Elev. 144 Ft.

  4. Access Bridge Mines Avenue Levee Automatic Gates Pipe Outlet in Basin 2 Elev. 161feet Basin 1 Concrete Pipes Concrete Inlet Structure Facing south N.T.S

  5. Foundation • Assume as a wall • Submerged in water • Used to check: • Mat Footing • Bearing soil capacity qu=5168psf • Depth Df =2 ft • Width B= 3ft NTS

  6. Concrete Inlet Structure • 2 Gates 72”x54” (Automatic Sluice Gates) • Foundation Size 15’x 2’ Wire Mesh on top • 2 Pipe Size 48” • Concrete Structure. 22.5’ • Wall Thickness 12” • Bar Grading

  7. Plan View SOUTH NORTH

  8. Excavation

  9. Hydraulic Pipe Jacking • Trenchless method • Hydraulic jacks inside the pit • The pipe is advanced forward in increments

  10. Feasibility • The siphon pipes will avoid the two existing water pipelines • Dewatering services will be needed at an elevation of 157 ft. • The minimum slope for the excavation cannot be steeper than 1 : 1

  11. The Existing Gates to be Demolished

  12. Cost Estimation • Demolition of gates • Conveyance Structure Total Cost ≈ $547,000 plus contingencies

More Related