620 likes | 859 Views
Session 2: Product Development Agenda. Questions from last lecture Product Development Process Example – SQUID SBIR Program “Muddiest Points” Input Sheets Homework Due Session 3. Commercialization Model. User. Project Operator. Business Development Process. Project Owner.
E N D
Session 2: Product DevelopmentAgenda • Questions from last lecture • Product Development Process • Example – SQUID SBIR Program • “Muddiest Points” Input Sheets • Homework Due Session 3
Commercialization Model User Project Operator Business Development Process Project Owner Project Developer Project Development Process System Producer Product Development Process Equipment Producer Technology
Product Development Starts with a Need Customer Need
Simple Product Development Model Customer Need Design Fab & Assembly Testing Production
Expanded Product Development Model Customer Need Detailed Design Conceptual Design Preliminary Design Fab & Assembly Dev. Testing Qual. Testing Production Delivery and Support Design broken into Conceptual, Preliminary, and Detailed Testing broken into Development and Qualification
Product Development Model with Rework Customer Need Detailed Design Conceptual Design Preliminary Design Fab & Assembly Dev. Testing Qual. Testing Production Delivery and Support Rework • Rework is required during development testing • Re-design • Drawing changes • Fabrication & assembly • Re-test
Testing During Design Reduces Rework Customer Need Detailed Design Conceptual Design Preliminary Design Fab & Assembly Dev. Testing Qual. Testing Production Delivery and Support Testing Testing Testing Rework • Component testing during design reduces development rework
Integrated Product Development & Support (IPDS) Model Phase 1 Pre-Concept Customer Need Phase 2 Concept Phase 3 Product Definition Phase 4 Detailed Design Phase 5 Fabrication, Assembly, Test & Readiness Phase 6 Initial Delivery, Support, and Improvement Detailed Design Conceptual Design Preliminary Design Fab & Assembly Dev. Testing Qual. Testing Production Delivery and Support Testing Testing Testing Rework
IPDS Model with Major Deliverables Phase 1 Pre-Concept Customer Need Proposal Phase 2 Concept Phase 3 Product Definition Phase 4 Detailed Design Phase 5 Fabrication, Assembly, Test & Readiness Phase 6 Initial Delivery, Support, and Improvement Detailed Design Conceptual Design Preliminary Design Fab & Assembly Dev. Testing Qual. Testing Production Delivery and Support Testing Testing Testing Rework Solid Model Trade Studies Detailed Drawings Specifications Qualified Prototype Production Drawings Production Units Support Resources Requirements Sketches Trade Studies
Integrated Product Development & Support (IPDS) Phase 1 Pre-Concept Customer Need Proposal Phase 2 Concept Phase 3 Product Definition Phase 4 Detailed Design Phase 5 Fabrication, Assembly, Test & Readiness Phase 6 Initial Delivery, Support, and Improvement Detailed Design Conceptual Design Preliminary Design Fab & Assembly Dev. Testing Qual. Testing Production Delivery and Support Testing Testing Testing Rework Solid Model Trade Studies Detailed Drawings Specifications Qualified Prototype Production Drawings Production Units Support Resources Requirements Sketches Trade Studies
The Concept of Commercialization Phase 1 Pre-Concept Customer Need Proposal Phase 2 Concept Phase 3 Product Definition Phase 4 Detailed Design Phase 5 Fabrication, Assembly, Test & Readiness Phase 6 Initial Delivery, Support, and Improvement Detailed Design Conceptual Design Preliminary Design Fab & Assembly Dev. Testing Qual. Testing Production Delivery and Support Testing Testing Testing Rework Solid Model Trade Studies Detailed Drawings Specifications Qualified Prototype Production Drawings Production Units Support Resources Requirements Sketches Trade Studies Commercialization Proof-of-Concept
Phase 1 – Pre-Concept Customer Input • Customer Needs - Opportunity Assessment • Opportunity ID - Decision to Pursue Phase 2 – Concept • Bus & Pgm Plans - Risk Abatement • Conceptual Design - Proposal Phase 3 – Product Definition/Process Development • Detailed Plans - Detailed Layouts • Trade Studies - PDR Phase 4 – Detailed Design • Design Definition - Key Characteristics • Manufacturing Definition - CDR Phase 5 – Fabrication, Assembly, Test & Readiness • Hardware Fab - Production Readiness • Development Testing - Qualification Testing Phase 6 – Initial Delivery, Support, and Improvement Customer Satisfaction • Manufacturing - Problem Resolution • Customer Support - Customer Data
IPDS Key Points • Life Cycle of Project in Six Phases • Each Phase has Exit Criteria • Phases can Overlap for Fast Cycle Time • Integrated with a Multi-functional Team • Program Kickoff is Key • Setting the Vision • Input from all Team Members
Product Development is … • A primary engineering function. • A primary business process. • Both design and implementation. Product Development Summary
Integrated Product Development is… • State-of-the-art, generic approach. • Factors all requirements into the design early. • Uses a multifunctional team to integrate. Product Development Summary
Integrated Product Development and Support (IPDS) is… • Specific process developed by AlliedSignal. • A six-phased approach that features • Exit criteria for each phase • Ability to overlap phases to achieve Fast Cycle Time • Use of a multi-functional team • Detailed procedures and deliverables for each phase. Product Development Summary
Using a FMEA and Requirements to drive detailed analyses • Using a simplified model to evaluate trades • Integrating component tests early in design process • Using simple equations to validate more detailed models • Learning to bound the problem Areas Where Students Have Trouble
Establishing Need through a “Voice of the Customer” process • Translating VOC into measurable engineering requirements • Creating an expanded requirements list • Establishing a method to verify each engineering requirement • Performing trade studies • Understanding the distinction between features and benefits Areas Where Students Have Trouble
Example Project Non-Lethal Stopping Device Home Land Security Small Business Innovative Research (SBIR) by Engineering Sciences Analysis Corp. (ESA) SQUID Example.ppt
Safe Quick Undercarriage Immobilization Device • Stored Configuration • 14-inch Diameter • 4-inches high • Less than 50 lbs • DOT approved • All-Weather Capability • Rugged Construction • Hi-Temperature Resistant
Manufacture Product/ Customer Support Logistics VOC Technology Assessments Development Concepts Concept Definition Preliminary Design Review (PDR) Validation Test Report/ Review Critical Design Review (CDR) Overall Schedule SBIR Phase I Proven Feasibility - 6mos SBIR Phase II DHS Prototype SQUID - 24mos Stops representative vehicle Phase III SQUID to Mkt 12-18mos after Phase II
Problem Formulation • Identify and Characterize Problem • Voice of Customer • Requirements
Vehicle proximity is hazardous Officer proximity is hazardous Problem and Opportunity Current methods are ineffective • 1994-1998 stats - one officer killed every 11 weeks as a result of pursuit • Collateral damage - 42% of persons killed or injured are innocent bystanders • The SQUID is the solution to these problems
VOC Overview • Police departments • Sheriffs’ offices • Border Patrol • DPS/Highway Patrol • DoD/National Guard Users
Phase I - Requirements • DHS Solicitation – Develop new vehicle stopping technologies / techniques • Compact, Lightweight, easily transportable & Deployable • Weigh less than 150 lbs • Inexpensive & Safe • Deployable by ground-based personnel or helicopter (air assets) • Stop a 5,000 lb vehicle • 50 MPH – Off-road • 120 MPH – Hard Surface • Complete stop within 500 ft from initial engagement • Incapacitate for 30 min or more
Concept Design • Abstract Embodiments • Proof-of-Concept Testing • Evaluation and Selection • Verify there are no “Show Stoppers” • Analysis • Testing • Conceptual Design Definition
Concept DesignCandidate Abstract Embodiments Stop-Stick Variant Net Variant Axle Wrap
Baseline Concept Functional Block Diagram
Baseline Concept Functional Block Diagram • Identified basic physics to be employed • Indicated potential “show stoppers” that guided analysis and testing tasks • Basic Principle: Straps absorb kinetic energy • Redesign: Controlled skid absorbs kinetic energy
Tendril Windings Proof-of-Concept Testing Example • Secondary Tendrils Launch • Ensnare rotating component • Leader pulls in secondary net
Pressure Volume Gas Generator Winding Cavity Pressure boundary Frangible top & bottom Pressure Volume Gas Generator Winding Cavity Pressure boundary Frangible sides Gas Generator Projectile / Plugs Pressure Volume Directional Ball Valve Pressure channel Packaging Concept Study Concept 1 Concept 2 Concept 3
CAD Drawing of Baseline Concept Gas Generator • Key Components Activation Electronics Frangible Balls & Adhesives Straps wrapped around perimeter Tendril Windings
Configuration Design • Functional Block Diagram • Component Trade Studies • Bench Testing • Component Analyses • Evaluation and Selection • Baseline Configuration Design Definition
Phase 2 Goals • Prototype works – stops Durango SUV • Production design – meets DTC target • Commercialization Plan • MOU with a manufacturer • Patent • Phase 3 Plan
1 2 3 4 5 6 7 8 Overall Phase 2 Schedule Component Testing System Testing Preliminary Design Detailed Design Fab/Test Deliver DHS Test Prototype Design-to-Cost Hi-Spd Test Hi-Spd Testing Deliver Final Report Program Management and Commercialization Planning Monthly Progress Reports
Functional Block Diagram Functional Block Diagram (FBD) created as part of the Failure Modes and Effects Analysis process 41
Trade Study (How many studied) Primary choice is boxed Secondary choice Design Area Configuration Trade Studies Housing Connection (3) Syringe Nipple Deployment (2) Warm Gas CO2 Cartridge Outer Strap Material (6) Twaron Nylon Strap Configuration (3) Accordion Party Favor Bladder (8) Polyolefin Silicone Barbs (6) Roofing Nail Drywall Screw Event 1 Barb Orientation (5) Elastic Foam Weighted Base Unfurl Pressure (Range) 350 psi 120-350psi Barb Attachment (4) Grommets Clip-on Muzzle Inclination (Range) Vertical Only Multiple angles 30º-90º Firing Mechanism (2) 22 Ca Primer Shell Warm gas Sticky Substance (7) Glissopal (PIB) Carbotac (Acrylic) Event 2 Delay Control (2) DIP switches Rotary IR Sensor (3) Optek Keyence Squib Circuit (2) SCR SCR/Relay Electronics Legend Material (2) Aluminum Steel/Plastic Housing
Parametric Design • Models • Performance • Sizing • Cost • Optimization Studies • Subsystem Testing • Evaluation and Selection • Baseline Preliminary Design Definition
Parametric Design Model
Parametric Design Example 100 400 80 LEGEND Strap Strength Skid Distance 300 60 * Initial Speed of Vehicles = 50 mph Required Strap Strength, 1000s lbf Skid Distance, ft 200 40 100 20 0 0 0 10 20 30 40 50 60 70 Truck Weight, 1000s lbm
Prototype Development Movie
Detailed Design • Phase 3 Activity • Emphasis on Commercialization • Prototype Detailed Design Package • Prototype Build and Test Program • Detailed Design for Production
Project Management • Project Plan • Weekly Team Meetings • Metrics • Schedule • Budget • Performance • Focus on Deliverables