1 / 20

Beam Backgrounds

Beam Backgrounds. Itaru Nakagawa RIKEN/RBRC. cogged w/ collimator. Rates from clock trigger sample. Towards beam. Towards beam. Tsutomu’s MUID backgroud study. Towards beam. Towards beam. 2. Rates from clock trigger sample. 3. Run08 pp backgrounds. BBC rates ~ 91 kHz.

edmund
Download Presentation

Beam Backgrounds

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam Backgrounds Itaru Nakagawa RIKEN/RBRC

  2. cogged w/ collimator Rates from clock trigger sample Towards beam Towards beam Tsutomu’s MUID backgroud study Towards beam Towards beam 2

  3. Rates from clock trigger sample 3

  4. Run08 pp backgrounds BBC rates ~ 91 kHz

  5. Away from beam Away from beam Away from beam • Things to notice: • Gap 4 much higher for upper panels (beam background worse due to lack of protection from concrete mezzanine) • Structure shows where the shielding kicks in. • Average hits/channel ~ 100. West East Small Toward beam Toward beam Toward beam South Horizontal

  6. Away from beam Away from beam Away from beam • Things to notice: • Average hits/channel ~ 10. • Gap 4 no higher than Gap 0. West East Small Toward beam Toward beam Toward beam North Horizontal

  7. What does this mean? • 100,000 events corresponds to 1e-2 seconds of time. • On the south we have: • ~100 hits/channel/1e-2sec, • or a hit rate of ~10 kHz/tube. • On the north we have: • 10 hits/channel/1e-2sec, • or a hit rate of 1 kHz/tube. • In MB events we have 14 hits/arm in the South and 1.4 hits/arm in the North. • During the clock trigger run the MB rate was 91kHz. • There are 3160 tubes/arm, so we would expect from beam 14*91kHz/3160 tubes = 400 Hz on the South (and, similarly, 40 Hz on the North). • Meaning that something like 96% of the hits in each arm are not in coincidence with collisions. • Caveat – the MB rate is with a vertex cut, without this cut the rate was nearly twice as high, which would up the expected rates to ~1 kHz and 100 Hz for each arm. But this still leaves 90% of the hits from non-collision background.

  8. What we know so far • Backgrounds situation isn’t serious at STAR • MUID rates @ clock trigger barely changes by collimation • As soon as steer beam from collision, the backgrounds disappear • Collision repopulates beam halo/beam backgrounds • MuID rates are highest Gap-0 next Gap-4 • Gap-0 backgrounds come from IP? • Gap-4 backgrounds come from upstream? • RPC proto indicates some components comes from upstream.

  9. Some observations: nice signals, but at two times, “late” signal at high/low thresholds, and lower voltages From Ralf’s meeting slide 2014/8/25 R.Seidl: RPC design R.Seidl: RPC design 9

  10. Second peak reduced in muon coincidence 2014/8/25 R.Seidl: RPC design R.Seidl: RPC design 10

  11. So, where is the source of backgrounds?

  12. Background Scintillators Layout

  13. North Tunnel Scintillators Counts < 200kHz Already achieved in Run09

  14. Beamline Diameter

  15. Beam Spacial Size at Triplet 5mm @ 35 m ~ 12  Smaller than 200 GeV

  16. Beam Size at IP

  17. Plan • Some space between shielding and beam pipe • Move background counter closer • Pin diodes in IP?

  18. Backups

  19. Beta Tune

  20. Magnets Layout

More Related