In The Name Of GOD. SEFIDRUD DAM DESILTATION OPERATION by M.H.Ranjbar Taklimy & E. Tolouie Sefidrud Reservoir desiltation committee, Gilan regional water board, Iran August 8-15,2005, Yichang,Hubei Province, China. LOCATION OF SEFIDRUD DAM AND CATCHMENT. SEFIDRUD RIVER SYSTEM. SEFIDRUD DAM.
E N D
In The Name Of GOD SEFIDRUD DAM DESILTATION OPERATION by M.H.Ranjbar Taklimy & E. Tolouie Sefidrud Reservoir desiltation committee, Gilan regional water board, Iran August 8-15,2005, Yichang,Hubei Province, China
SEFIDRUD DAM Evacuating system: . 2 morning glory spillways, 3,000 m3/s . 2 auxiliary spillways, 2,000 m3/s . 5 power intakes, 160 m3/s . 5 bottom outlets, 980 m3/s . Total capacity, 6000 m3/s
SEFIDRUD DAM • Location, 250 km north west of Tehran • Type, Buttress-gravity • Max height, 106 m • Crest length, 425 m • Crest elevation, 276.95 masl (metre above sea leavel) • Main purpose, Irrigation (Mostly rice field)
FEASIBILITY OF FLUSHING OPERATION Changing the rule curve
FEASIBILITY OF FLUSHING OPERATION Changing the rule curve
FEASIBILITY OF FLUSHING OPERATION Changing the rule curve
FEASIBILITY OF FLUSHING OPERATION Changing the rule curve
FEASIBILITY OF FLUSHING OPERATION Environmental impacts
MITIGATION OF NEGATIVE EFFECTS In order to mitigate negative environmental impacts, comprehensive studies on environmental aspects of sedimentation and desiltaion is carried out since 2003, we hope that the result of the studies will help us to achieve sustainable development in sefidrud river system.
FLUSHING WITH FLOW DIVERSION Diversion scheme Main features
FLUSHING WITH FLOW DIVERSION Diversion scheme Layout
FLUSHING WITH FLOW DIVERSION Diversion scheme (b) diversion(pilot)canal (a) diversion dam Components
FIELD OBSERVATIONS Types of erosion occurred along diversion canal
CONCLUSION: 1- Flushing operation is a suitable tool to conserve and rehabilitate reservoir capacity, provided suitable outlet system is avilable. 2- Flow diversion to the flood plain is an effective and practical method to increase desiltation efficiency in flushing operation. 3- In sefidrud reservoir, flow diversion as a supplementary measure to flushing operation was proved to be very efficient in reducing trap efficiency of the reservoir, as presented below: • trap efficiency (inflow sed.- outflow sed.) Inflow sed. during 17 years of normal operation=79%. • trap efficiency during 3 years of flushing operation=37% • trap efficiency during 7 years of flushing operation + flow diversion = - 96%.
SEFID - RUD RESERVOIR DESILTATION Note: Foreset of deposited sediment is above power intake level
Extensive erosion of new thalweg due to Hydraulic shock (dam break)
Extensive erosion of new thalweg due to Hydraulic shock (dam break)