Tue 14/6 – Wed 15/6

Tue 14/6 – Wed 15/6. 07:30 STABLE BEAMS 1868 22:37 Trip of sector 81 due to 400V problem in RR13 resulting in stop of the current lead heaters. End of fill #1868 after 15 h (~47 pb -1 ) Access for: 400 V repair(UJ14)

edolie
Download Presentation

Tue 14/6 – Wed 15/6

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tue 14/6 – Wed 15/6 • 07:30 STABLE BEAMS 1868 • 22:37 Trip of sector 81 due to 400V problem in RR13 resulting in stop of the current lead heaters. End of fill #1868 after 15 h (~47 pb-1) • Access for: • 400 V repair(UJ14) • QPS card replacements (lost communication) in Sector 67 (Old QPS 8L7 QF/QD) and Sector 23 (Old QPS 21R2 QF/QD) • 02:30: end of access • BIW in point 5 not OK (SR5)  changed relay • 05:00: Machine closed  Start injection • 06:15: Beam dump at injection B1 • 07:00 Still high losses at injection  checking injection

  2. We are getting there... (2011 – 3.5 TeV)

  3. We are getting there... (2011 – 3.5 TeV)

  4. Plan • Physics with 1092 bunches • If beam stop during working hours: • intervention on arc detector electronics for RF waveguides • Intervention on cryo valve controller (bad contact) in RE76 • BLM enable in TD62

  5. Pending • Increase to 1236 bunches (RF strategy to be discussed at LMC this afternoon) • Van der Meer scan in IP5 in stable beams (being prepared)