VLPGO : Group of the Very Large Power Grid Operators

VLPGO : Group of the Very Large Power Grid Operators. VLPGO : Introduction. The Genesis August 14, 2003 blackout in the eastern part of USA Large scale disruptions and huge losses Such disturbances are faced by all System Operators frequently

edward
Download Presentation

VLPGO : Group of the Very Large Power Grid Operators

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VLPGO : Group of the Very Large Power Grid Operators NLDC

  2. VLPGO : Introduction • The Genesis • August 14, 2003 blackout in the eastern part of USA • Large scale disruptions and huge losses • Such disturbances are faced by all System Operators frequently • Underlying reliability issues need to be addressed. • The Beginning • Started as a group of organizations from various countries across the world, operating power grids of size more than 50,000 MW • A total of 13 organizations from 10 countries across the globe part of this initiative • POWERGRID, India: a founder member of this group • 2010: VLPGO incorporated in the USA as a non-profit organization • The Objective • Identifying the challenges and issues that are unique to the operation of very large power grids (50,000 MW +) • Sharing the experiences gained and the best practices adopted by various utilities • Development of a common vision in related technology areas • Development of a consensus on a prioritized list of issues, which are of common interest to the participating members • Development of joint action plans and initiatives

  3. California ISO, USA ETSO / ENTSO, Europe KPX, South Korea Midwest ISO, USA National Grid, UK ONS, Brazil PJM, USA POWERGRID, India REE, Spain RTE, France SO-CDO of UPS, Russia State Grid Corporation of China TEPCO, Japan Terna, Italy VLPGO: Present Members

  4. VLPGO: Structure & Information Exchange • Structure • Steering Committee – CEOs of all Member organizations • Meets once a year – In October • Governing Body – Designated Representatives from each organization • Meets twice a year • Working Groups on Subjects of Common Interest • One of the member countries takes the lead, responsible for development of the subject • Information collection through Questionnaires, Analysis & Collation of responses of members by Lead • Preparation and Presentation of report in the Annual Meeting • Teleconferences & Meetings, if necessary • Information Exchange • Through Emails only

  5. VLPGO: Working Groups in 2009 WG: Working Group JP: Joint Project WS: Workshop

  6. VLPGO: Working Groups in 2010 WG: Working Group JP: Joint Project WS: Workshop

  7. Thank you !! NLDC