Western Highveld (Former Kwa-Ndebele Homeland): WC/WDM implementation. About 700 000 people in about 155 000 households About 67% of the households have an income less that R800 per month About 60% households have yard / house connections About 35% of households are currently metered
E N D
Western Highveld (Former Kwa-Ndebele Homeland): WC/WDM implementation • About 700 000 people in about 155 000 households • About 67% of the households have an income less that R800 per month • About 60% households have yard / house connections • About 35% of households are currently metered • About 17% of households are currently being billed
Problem Statement • Perennial challenge of facing a Ministerial Water Crisis Committee (Aug). • Most communities received water with disruptions & some not at all. • Strong views on the need to increase bulk supply (Bronkhortspruit Dam raising/ Extra supply from Vaal system/conflict situation with Loskop Dam allocations for farmers when communities don’t have enough water). • Existing institutions operate with levels of water losses in excess of 50 - 70%. • Revenue collection efficiencies below 30%. • Only 15% of water produced generates revenue. • Has left existing Service Provider arrangement with no means- • To operate and maintain infrastructure • Expand systems in response to consumer demands • Critical need is to: • Reduce cost of supply (Yard connections with 30% losses) • Improve revenue collection • Maximise use of existing infrastructure (asset management)
Structure of the Project Team • SIBAMBISENE PROJECT MANAGEMENT • Development of detailed scopes of work, work plan, programme, cash flow • Strategic Project Direction • Day to day management & coordination of teams • Client Liaison • Project Finances • Interproject Liaison • TECHNICAL • GIS/Structural Model • Meter Installation • Sectorisation • Hydraulic Modelling • Pressure Management • System Performance • Leakage Control • SOCIAL • KAP Survey • Passive Leakage Control • Consumer education • Awareness Material • INSTITUTIONAL • WSA Capacity • Operational Capacity • Policy and By-laws • Financial Viability • Customer Management • Broader Institutional Issues SUSTAINABLE WATER LOSS CONTROL & IMPROVED SERVICE PROVISION
PSM removed PSM steel/concrete box Ekangalametering Aqualoc & KSM Optima in plastic box
Social InterventionsEducation and staff Training programs (need to be ongoing) Pictures Courtesy of Rand Water
Total Savings Savings equivalent to Bon Accord dam or Magoebaskloof Cost of WC/WDM measures: R25m Cost of Infrastructure Augmentation: R150m
South Africa takes first place at the Stockholm Junior Water Prize Media release by the Department of Water Affairs and Forestry24 August 2005 Matobele Motshodi, Sechaba Ramabenyane and Ponthso Moletsane together with HRH Crown Princess Victoria. (World Water Week)
Sources of Leakage In order to address leakage problems it is first necessary to understand the main sources of leakage • burst leakage from mains and connections • background leakage from underground pipes • leaks from taps and toilets inside properties
Political will and support is very crucial for success of WC/WDM Initiatives