Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK)

Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK). M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki, S. Yamaguchi Novel Accelerator Promotion Office in KEK. Japan-US collaboration for me.

egatto
Download Presentation

Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for Japan-US collaboration onNew Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki, S. Yamaguchi Novel Accelerator Promotion Office in KEK

  2. Japan-US collaboration for me • Development of klystrons and other electron tubes.(Mitsubishi / Toshiba)Technologies are based on Japan-US collaboration. • Concerning to beam driven accelerator region,U.S. has many experiences for more than 10 years.We have to learn more about this region. => ILC after burner etc. New concept IOT for ERL DRFS klystron / L-band 40 MW etc.

  3. FACET at SLAC 0.4 ps 1.19 GeV σz= 5.5mm=18 ps εx,y=50 x 5 mm・mrad 23 GeV, 3nC σz=14μm=50 fs σx,y = 10 μm β ~ 1 m At FFTB experiment : Gradient : PWFA(>30GV/m), DWA(>16GV/m). Total acceleration voltage : > a few GeV. We are discussing with Dr. Mark Hogan.

  4. FACET at KEK 8 GeV LINAC from 1998 Install Photocathode RF-Gun ps modulated laser Experimental Area 40 TW laser sz=1 ps, q > 5nC, εx,y < 20 mm・mrad BCS Total length ~400m => 9 GeV e- 9 GeV, 5nC σx,y = 35μm (β~1m) e+ 4 GeV, 5nCfrom damping ring e+ Damping Ring (under construction)

  5. Target for FACET in KEK • Continuous novel accelerator facility until Super-KEKB shutdown ~2025 ? • Short pulse laser complex facility : Laser modulated photo cathode RF-Gun and LWFA injector for femtosecond witness beam. • User facility for University etc. ~100 fs electron bunch LWFA fs witness bunch DWA (or PWFA)

  6. Ex. DWA DWA experiment is just started using another low energy fs beam. Single-wall DWA: ×Transformer Ratio(~3) Multi-wall or photonic DWA with multi femtosecond bunch: Laser modulated micro bunch structure Higher Transformer ratio + For microwave: Klystron : 350 kV Accelerator : 35 MV/m => transformer ratio = 100

  7. 8 GeV LINAC Third Switch Yard Damping ring (under construction) KEKB (continuous inj.) 8 GeV LINAC Gun AR (2 inj./day) PF (top up) Third Switch Yard

  8. Beam diagnostic station &FACET at KEK LINAC Beam damp Pulse bend for PF Experimental Area (beam damp) ~2014 : no injection to KEKB ↓ 2014~ : beam switch for KEKB/PF & Beam Damp

  9. Key technologies • Laser plasma injector • The witness beam. • Sub-fs beam. • Fast beam switch (completed) • Event system • Pulse bend • RF-Gun (will be installed soon) • Velocity bunching DAW => high charge & low emittance • Modulated laser => micro bunch structure. • X-band for harmonic compensation and bunch compression. • Also use for Beam Diagnostic Station for LINAC Upgrade : Bunch Length / Sliced Emittance

  10. Laser Plasma Injector LWFA injector for femtosecond witness beam • Stacked capillary • 40 TW laser is enough for self-injection • Upgrade existing TW laser Discharged by YAG laser

  11. Fast beam switch Beam Damp Mode Damp • 50 Hz Event System (completed) • Pulse Bend (installed) FACET New beam line is required Experimental Area KEKB e+ KEKB e-

  12. Velocity bunching DAW RF-Gun + Laser modulation Micro bunch structure 1/4 Transient Angle Linear velocity bunching will be expected to generate higher charge bunch > 10nC

  13. X-band • Harmonic compensation (suppress second term) • Bunch compression • Nextef : => • 3 PPM klystrons. • 150 MW

  14. Summary • FACET at KEK is considered to construct the beam driven and short laser complex facility, it has some different aspects compared with FACET at SLAC. • KEK 8 GeV LINAC has unique ability for novel accelerator test facility except for SLAC in the world. • It is expected to become a good complementary project to FACET at SLAC.