1 / 5

$825 Million Plan

$825 Million Plan. ITE Luncheon February 26, 2014. Bexar County/Alamo RMA Strategic Mobility Plan. What is the $ 825 M Plan? A partnership between Bexar County, Alamo RMA, City of San Antonio, VIA and TxDOT .

elaine-hart
Download Presentation

$825 Million Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. $825 Million Plan ITE Luncheon February 26, 2014

  2. Bexar County/Alamo RMA Strategic Mobility Plan • What is the $ 825 M Plan? • A partnership between Bexar County, Alamo RMA, City of San Antonio, VIA and TxDOT. • Utilizes available funds from a variety of sources to implement 3 needed projects (US 281, I-10, LP 1604). • Provides for the implementation of the 3 projects within the next 2-5 years as opposed to waiting on them for over 10 years.

  3. 281 87 Bexar County/Alamo RMA Strategic Mobility Plan

  4. Bexar County/Alamo RMA 5-Year Strategic Mobility Plan The proposed $ 825 Million Bexar County/Alamo RMA Strategic Mobility Plan includes the following three projects. US HWY 281 from LP 1604 to County Line – The scope of the $458M project is a combination of new non tolled and tolled lanes plus frontage roads. Proposed funding for the project is comprised of following sources: • $78 M in Local Funding ($48M in ATD and $30M in CoSA) • $150M of funds already committed in the UTP ($144M Cat 2 and $6M Prop 12) • $230M TxDOTloan paid back with toll revenue LOOP 1604 from FM 471 to US 90 – This $187M project would construct 4 new non-tolled lanes in the existing median of LP 1604. Funding for this project is a combination of: • $117 M in local ATD funds • $70M in local funds (Bexar County Vehicle Registration Fee). Interstate 10 From Ralph Fair (FM 3351) to LP 1604 – This $180M project includes the construction of 2 new tolled managed lanes and priority managed lane direct connectors at the I-10/1604 interchange. Proposed funding sources for this project are: • $70 M grant from TxDOT(Match for Bexar County vehicle registration) • $72 M in previously committed funds in the UTP (Cat 2) • $38M TxDOTloan paid back with toll revenue The chart summarizes the above narrative and provides totals for each of the funding sources.

  5. 281 87 Bexar County/Alamo RMA Strategic Mobility Plan

More Related