70 likes | 136 Views
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ Status Update for FSK PHY drafting ] Date Submitted: [ 14 January 2012] Source: [ Matt Johnson ] Company [ Itron ] Address [ 2111 N Molter RD, Liberty Lake, WA 99019, USA ]
E N D
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:[Status Update for FSK PHY drafting] Date Submitted: [14 January 2012] Source:[Matt Johnson] Company [Itron] Address [2111 N Molter RD, Liberty Lake, WA 99019, USA] Voice:[+1 509-891-3364], FAX: [+1 509-891-3896], E-Mail:[matt.johnson@itron.com] Re:[] Abstract:[This document provides an update to the 4k group on the progress of the FSK PHY drafting activities.] Purpose:[Status update .] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. <Matt Johnson>, <Itron>
Agenda • Status Update • Key Issues to Resolve during Jacksonville Interim <Matt Johnson>, <Itron>
Status • Merged Baseline Approved in Atlanta • Sub-group has been drafting text for FSK PHY and holding (somewhat) regular calls • Mostly complete first draft • Sufficient for discussion of topics and identification of improvements • Posted as 15-11-0864-03-004k <Matt Johnson>, <Itron>
Changes Since Baseline • Inclusion of the Chinese 470 and 780 MHz bands <Matt Johnson>, <Itron>
If you are new to 4k… • As 4g is wrapping up, we may have some new people in the room • To get up to speed here are some background documents: • 802.15-11-0774-01-004k The Merged Proposal • Has document numbers of all the constituent proposals from the Okinawa Interim <Matt Johnson>, <Itron>
Key Issues to Resolve This Week • Preamble Length • Adjustments to 15.4 default values for more optimal battery life in end devices and more capable coordinator radios • SFD Length and Value(s) • 2 or 4 octets, or both as optional choices • Definition of PHR • Come to closure on PHY RF requirements • Inputs from semiconductor manufacturers • Definition of LECIM channel page • Perhaps something simpler than 4g? • Goal: Draft ready to hand off to editors <Matt Johnson>, <Itron>
Thank You! <Matt Johnson>, <Itron>