IHNC SURGE BARRIER

IHNC SURGE BARRIER. MRGO. GIWW. Trestle Construction. About 2000’ of trestle allows precision installation of piles and other components. South Heading Soldier Pile Placement – Complete!. 144 Feet Long 66” Diameter, 94 tons. Weeks 526 Rig. 1271 piles – Completed October 21, 2009.

eli
Download Presentation

IHNC SURGE BARRIER

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IHNC SURGE BARRIER MRGO GIWW

  2. Trestle Construction About 2000’ of trestle allows precision installation of piles and other components

  3. South Heading Soldier Pile Placement – Complete! 144 Feet Long 66” Diameter, 94 tons Weeks 526 Rig 1271 piles – Completed October 21, 2009

  4. North Heading Soldier Pile Placement – Complete! Whirley Tower

  5. 18” Closure Piles & Jet Grouting 2544 piles – Completed February 11, 2010

  6. 36” Steel Batter Piles- Complete! 645 of 645 piles –Completed as of April 10, 2010

  7. Soldier, Closure, Batter Piles Temporary Trestle Interstitial Space Batter Piles Closure Piles Soldier Piles

  8. Interstitial Space-Complete Excess material functioning as armoring and reducing the amount of infill required Space to be filled 4’ of almost pure grout 6 Foot core sample taken shows good contact between overflow material and injected material Excess material is pushed out of hole when closure pile is installed Closure Pile Pile tip -45 Soldier Pile Grout plume -55 to -85

  9. 66” Concrete Pile Clean Out- Complete Drill bit removes the mud from inside the pile

  10. Precast Caps 17 Feet Long, 96 Tons 306 of 306 Installed –Complete!

  11. Cast in Place Concrete Section 6 Feet Wide, 339 of 339 Cast – Complete

  12. Expansion Joint 17 of 17 Set Complete!

  13. Parapet Wall Complete Cast in Place

  14. Protected Side of Floodwall

  15. North T Wall Construction • Located at the North end of the Floodwall • Complete

  16. South T Wall Construction • Located at the South End of the Floodwall • Complete

  17. Installed Sill Installing Walls Bayou Bienvenue Gate

  18. Barge Gate Complete

  19. Sector Gate Cofferdam under way

  20. Tripping Dauphins 5500’ 3500’

  21. Questions