HIGHWALLING. Insert Product Photograph Here. Mgmt Skills. Communication. Reserves. Equipment. The Highwall Puzzle Pieces. People. People. Miner Operator 1 Endloader Operator 1 Mechanic 1 Electrician 1 General Laborer 3 Foreman 1 Total 8. People.

elias
Download Presentation

Insert Product Photograph Here

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIGHWALLING Insert Product Photograph Here

  2. Mgmt Skills Communication Reserves Equipment The Highwall Puzzle Pieces People

  3. People Miner Operator 1 Endloader Operator 1 Mechanic 1 Electrician 1 General Laborer 3 Foreman 1 Total 8

  4. People • Labor shortage • Two – twelve hours shifts / day • Operate 4 – 6 days per week • Maintenance 1 day per week • Geographic locations change often • Exposed to nature’s elements • Perceived as a short term job

  5. Reserves • Seam heights 2.5 – 28 ft • Sustain a 1-3 year project • 40,000 – 200,000 tpm • Best if not previously auger mined • Competent roof or ability to leave head coal • Mine bottom up

  6. Equipment Spread • Modified Continuous Miner • Cascading Conveyor Cars • Launch Vehicle • Stacker - 54 inch belt • Bulldozer - pushing coal • 2 Endloaders – loading & unloading cars & loading trucks • Water Storage Tank

  7. Communication • Real time info in the cab • Web based storage • Real time communication with home office (under development)

  8. Management Skills • Long term mine planning • Synchronization of equipment • Synchronization of qualities/ markets • Keeping available wall

  9. Longwall/Highwall Similarities • Sole purpose is to cut coal • Initial reluctance to rely on the technology • Typically the lowest cost coal from a mining complex • Keeping gate roads ahead is as challenging as keeping wall available

  10. Safety Mining Method NFDL Rate ADDCAR 0.00 Surface Mining 1.48 Underground Mining 5.15 3rd Qt – YTD 2005

  11. Productivity Mining MethodTPEH Western Surface Mines 22.8 ADDCAR 18.5 Longwall Mines 5.1 Eastern Surface Mines 4.3 Non-Longwall Underground Mines 3.5 3rd Qt – YTD 2005

  12. Narrow Pit System • Footprint reduced from 90 – 45 ft • Continuous coal flow • Fewer fines • Horizontal & vertical guidance • 1,200 ft penetration • Purchase – lease – contract mine

  13. Conclusion If you keep wall …. you experience this