An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capacity Planning Chapter 14

  2. Capacity Planning • Capacity planning decisions involve trade-offs between the cost of providing a service (i.e., increasing the number of servers) and the cost or inconvenience to the customer • Involves determining the appropriate level of service capacity by specifying the proper mix of facilities, equipment, and labor required to meet anticipated demand

  3. Classification of Queuing Models

  4. Single Server M/M/1 λ OOOO ■ λ = arrivals per time period O = customer ■ = server

  5. M/M/1 Boat Launch Example If: λ = 6 boats arrive per hour μ = 10 boats launched per hour p = λ / μ Then: probability that the customer must wait is p = 6 / 10 = 0.6 or 60% probability that the customer does not have to wait is p0 = 1- 0.6 = 0.4 (40%)

  6. M/M/1 Boat Launch Example Mean number of boats in the system: Ls = λ / (μ – λ) Ls = 6 / (10 – 6) = 6/4 = 1.5 boats Mean number of boats in the queue: Lq = (pλ) / ((μ – λ) Lq = (.6 x 6) / (10 – 6) = 3.6 / 4 = .9 boats

  7. M/M/1 Boat Launch Example Mean time in the system: Ws = 1 / (μ – λ) = 1 / (10 – 6) = ¼ hour Mean time in queue: Wq = p / (μ – λ) = 0.6 / (10 – 6) = .15 hour

  8. Multiple Servers M/M/c ■ λ OOOO ■ λ = arrivals per time period O = customer ■ = servers

  9. M/M/4 Secretarial Pool Example If: λ = 9 requests per hour c = 4 servers p = λ / c (used to calculate the value of p0) Then: probability that a faculty member does not have to wait for secretarial work is P0 = 1 (9/4)0 + (9/4)1 + (9/4)2 + (9/4)3 + (9/4)4 0! 1! 2! 3! 4!(1-9/16) P0 = 0.098

  10. M/M/4 Secretarial Pool Example Mean number of jobs in the system: p c+1 Ls = (P0 + p) (c-1)!(c-p)2 (9/4)5 Ls =(0.098) + 9/4 (4-1)!(4-9/4)2 Ls = 2.56

  11. M/M/4 Secretarial Pool Example Mean time for each secretarial job in the system: Ls Ws = λ 2.56 Ws = = 0.28 or 17 minutes per job 9