1 / 3

Filter Wheel Closed Data

Filter Wheel Closed Data. How many EPIC CLOSED observations are needed ? Approach up to now (RCP): 12 x 10 ksec observations CLOSED FF (1/month) To be taken during the ‘good’time of the orbit New approach : 2 x 10 ksec observations (1/semester)

elie
Download Presentation

Filter Wheel Closed Data

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Filter Wheel Closed Data • How many EPIC CLOSED observations are needed ? • Approach up to now (RCP): • 12 x 10 ksec observations CLOSED FF (1/month) • To be taken during the ‘good’time of the orbit • New approach: • 2 x 10 ksec observations (1/semester) • Should there be evidence of response inhomogeneities, this can be increased • via NRCOs or by changing the RCP • Additionally, during some slews, all the MOS cameras can be set to CLOSED FF

  2. Implementation of MOS Slew CLOSED Data: • Operations • There are no operational issues and it can be easily implemented • The Slew mode can be specified in the R&C File • Implementation • Two R&C Files are prepared • R&C1: All MOS FF CAL-CLOSED Slews (Default) ; PN used for Slew Survey • R&C2: All MOS FF CLOSED Slews ; PN used for Slew Survey • All Slews in any given revolution will be done according to either R&C1 or R&C2 • The selection of a given R&C file is done by hand by the mission planner at the time the • revolution is scheduled • The selection of R&C1 or R&C2 is manual (best-effort-basis) • The re-schedule of a revolution because of a trigger or ToO observation could • change the initially selected R&C File (picking the wrong file) • Considerations • Slews are kept to a minimum, i.e., the average Slew duration is around 45 min (7.5 ksec at best) • The duration of the Slews will not be considered by the mission planner when using R&C2

  3. Discussion : • MOS : Do CLOSED in Slews and/or dedicated observations ? • MOS : How often, i.e, how many revolutions should MOS be set to CLOSED during Slews ? • MOS : Does using MOS in CLOSED every so often have any impact in the MOS CAL-CLOSED • Slews ? • PN : is the approach of 2x10 ksec ok ?

More Related