330 likes | 470 Views
2. Agenda. Study BackgroundScope of WorkDescription of Field SitesFWD and GPR TestingPreliminary FWD Analysis ResultsFuture Work. 3. Study Background. Ground work laid in 2001Many major routes were to be rehabilitated or reconstructedNeed for a Long-Life Pavement DesignRoads could be Public-
E N D