Chapter 9 Case Studies

Tutorial on Harmonics Modeling and Simulation. Chapter 9 Case Studies. Contributors: J. Wikston, E. Gunther, and M. Grady. Case 1. Simulation of the potential harmonic impacts caused by DC motor drives of ski lifts in a ski area. Single Line Diagram. Scenarios.

Download Presentation

Chapter 9 Case Studies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tutorial on Harmonics Modeling and Simulation Chapter 9Case Studies Contributors: J. Wikston, E. Gunther, and M. Grady

  2. Case 1 Simulation of the potential harmonic impacts caused by DC motor drives of ski lifts in a ski area

  3. Single Line Diagram

  4. Scenarios • Scenario SKIA. No Corrections. • Scenario SKIB. 30° phase shifting transformers added at Apollo and BigBoss ASDs. • Scenario SKIC. Case SKIB, plus 1800 kVAr of filters.

  5. SKIA, Voltage Waveform and Spectrum at Bus #1, Substation 12.5 kV (THDV = 12.2%)

  6. SKIB, Voltage Waveform and Spectrum at Bus #6, Base (THDV = 8.7%)

  7. SKIC, Voltage Waveform and Spectrum at Bus #6, Base (THDV = 2.7%)

  8. Case 2 Harmonics and interharmonics, the filter design, and design verification measurements associated with an industrial load

  9. Introduction • The load and compensation • Measurements • Filter design • Performance measurements

  10. Load and Compensation • 6 pulse load • Characteristic harmonic orders are n*p +/- 1 • Initial design 5th and 7th on MV bus

  11. Measurements - Voltage Distortion

  12. Measurements – 200 ms window

  13. Measurements - Interharmonics

  14. Filter Design • Type of filter • Location of filter

  15. Filter Types

  16. Filter Location • Utility bus • Secondary of customers step-down • Fault level reduced to ½ • Utility bus impedance 100% variation • Secondary of customer step-down 50%

  17. Performance Measurements

  18. Case 3 Analysis of harmonic impacts of variable frequency drives to the system

  19. SuperHarm model one-line diagram

  20. Predicted voltage waveform distortion without filters

  21. Predicted voltage waveform distortion at Bus I with power factor correction capacitors