1. Twinning Manual 2009 – New procedures, new templates, preparing and amending Twinning Contracts
3. TW Manual 2009 – Main Changes
4. Special Conditions
5. Study Visits
6. Ceiling for supply of services
7. Twinning Review Missions
8. Ceilings for visibility costs
9. Model Expenditure Verification Report
10. Selection Fact Sheets
11. Addenda / Side Letter Templates
12. Lisbon Treaty As a consequence of the Lisbon Treaty, some denominations will have to be changed in some templates.
13.
TWINNING CONTRACT
14. TWINNING CONTRACT
The formal commitment made by a MS will be in the form of a ‘Twinning Contract’. This constitutes the contractual framework for implementing the Twinning project and specifies the obligations of both administrations in the MS and the BC
Twinning contract is a Grant contract
15. COMPOSITION OF THE CONTRACT Special Conditions
Annex I: Description of the Action + Work Plan
Annex II: General Conditions for EC financed grant contracts for external actions
Annex III: Budget for the Action
Annex IV: Contract – award procedures
Annex V: Standard request for payment and FIF
Annex VI: Model Expenditure Verification Report
Annex VII: Special Financial Annex
Annex VIII: Mandates (if consortium + intra consortium agreement)
16. CONTRACTING AUTHORITY (CA) Twinning partners should always refer to the Contracting Authority for financial and contractual issues
The CA can be either the Commission (for centralized programmes) or the CFCU (DIS)
17. CONTRACT SPECIAL CONDITIONS
Article 2 – Execution and Implementation period of the Action (legal and work plan duration)
Article 4 - Technical and financial reporting and payment arrangements
18. ANNEX I Description of the Action + WP Detailed work plan with clear benchmarks to allow for close monitoring of progress towards the final results
Drafting Twinning contract and work plan must be a joint MS/BC exercise
A work plan consists of a sequence of activities which together constitute a strategy aimed at achieving the results
19. ARTICLE 3 MANDATORY RESULTS (OUTPUTS) Concrete operational results
‘mandatory results’ should be limited, well-defined, measurable and precise institutional targets
Achievements of mandatory results should be maintained after the end of implementation, disseminated and consolidated
20. MANDATORY RESULTS (OUTPUTS)
21. ARTICLE 4. TASKS (INPUTS) Method
- Brief description of activity (What will happen: MS STE mission, study visit, training, consultation, etc), how will it be implemented, by whom (clear share of responsibility MS/BC) and when
Resources
- MS Human Resources (Number of experts and man / days)
- Beneficiary Administration Human Resources (No. of people and their home institutions)
- Other resources (translation, interpretation, training materials)
22. ARTICLE 5. RISKS
Internal conditions related to the project that must be fulfilled in order to guarantee its success
23. ARTICLE 6. SCHEDULE
24. ARTICLE 7 RESOURCES 7.1. Human Resources
7.1.1. Member State(s)
7.1.2. BC
7.1.3. Curricula Vitae
7.2. Material Resources
7.3. Indicative Budget
25. ARTICLE 8 MANAGEMENT AND MONITORING
8.1. Language
8.2. Project Steering Committee
8.3. Reporting
26. ARTICLE 9 Twinning Review Missions Each project can be followed, 6 to 12 months after its finalisation, by a Twinning Review Mission
This mission aims at reporting whether sustainable impacts or spin offs have been observed after Twinning project finalisation.
Twinning Review Missions are organized and financed by TAIEX instrument
27. ANNEX A3 BUDGET The Twinning budget is presented in the format of an activity based budget apart from the RTA related expenditure and other general budget items.
Expenditures listed in the budget must correspond to the activities listed in the work plan
The budget is signed and initialed by both MS and BC Project Leaders
28. ELIGIBLE COSTS RTA salary, allowances (as per chapter 5.3 and Annex B), training, Assistant
Project preparation (chapter 5.2.1)
Project Leader (fees, travel, visibility costs and audit certificate (chapter 5.4)
Experts per activity (fees, travel, per diem, local travel)
29. ELIGIBLE COSTS (2)
“Management Costs”: 150% on all fees
Translation – Interpretation
Training in BC – Training in MS
Expenditure verification report costs (for instance 4000-6000 €)
Procurement of Supplies / Services
Contingencies (2,5%)
30. NON-ELIGIBLE COSTS Costs of STE/PL working in the MS and backstopping costs are covered by project management costs
Travels to MS for BC officials
Large scale equipment
Operational costs of BC (Office space, telephone, fax, photocopiers, secretarial support, etc.)
MS STEs monitoring visits
VAT
31.
Salary, benefits, allowance
Salary and non-wage labour costs
6% of salary and non-wage costs
Subsistence allowance (50% of rate for days spent in BC)
Health insurance RTA + spouse (max. €200 / €100 children)
Accommodation
Per diem allowance for first 30 days (RTA + spouse/children)
Accommodation
Estate agent fees (max 2 months’ rent – one month sufficient)
32. Travel
Travel to and from place of duty
Removal and storage + annual trip home for RTA + spouse/children
OR:
monthly return trips home for RTA
Other RTA costs
School fees (max. €12,000 p.a.)
RTA training in Brussels (3 per diems plus return flight to Brussels)
Assistant (max. per BC)
33. PROJECT LEADER COSTS
The Project Leader is required to spend at least 3 days in BC every quarter
Project leader fees and 150% management costs
Airfares
Per diems
Translation of reports etc.
Interpretation
Final audit costs
Management of Logistics and Accounting are provided by the MS administration (and Partner MS) and covered out of the Management Costs (no additional cost to the contract)
34. CONTRACT PREPARATION COSTS Refundable upon endorsement of Contract for trips during the period up to 6 months following notification of selection
35. VISIBILITY COSTS Funds for the printing of posters, banners and other items promoting the activities and acknowledging the funding source (EU)
36. OTHER COSTS IN BC Fees of short-term experts
Management costs (150% of fees)
Per diems for STEs (per night, no halves)
Airfare (economy)
Local travel (max. €50)
Translation (for instance €15 - €45 per page)
Interpretation (for instance max. €300 per day)
Interpretation away (for instance max. €400 per day)
37. COSTS COVERED BY BC
Office space for RTA and assistant
Telecommunications (phone, fax)
Computer, including e-mail access, printer
Office supplies
Secretarial assistance
Meeting and seminar venues
International travel for BC staff
BC experts
38. COSTS IN MS Per diems for BC participants
Interpretation (for instance max. €300 per day)
Incidental fee 10€ per MS participant
NB: Hiring a BC interpreter is recommended if the cost for per diems and travel is lower than the cost of hiring a local interpreter
39. SHORT TERM EXPERTS FEES
PUBLIC ADMINISTRATION
Civil servants € 250
MANDATED BODY
Class 1 expert € 250
(Minimum 3 years of relevant experience)
Class 2 expert € 350
(Minimum 8 years of experience, work in non-EU countries)
Class 3 expert € 450
(Minimum 15 years of experience, high-level staff)
40. PRIVATE SECTOR INPUTS
Supply of Goods: Limited to € 5000 for each TW project
Supply of Services: Limited to € 10000,
In both cases a single tender procedure is managed by a MS PL.
41. Seminars, Training, Traineeships and workshops In the Beneficiary Country
TW mainly provides for experts from MS, possibly also documentation, interpretation and transport for on-site visits
Facilities, equipment, transport of BC staff, refreshments should be provided by the BC
In the Member State
BC covers transport costs of staff from BC to MS, per diems for BC trainees are allowed. Costs for MS expert fees cannot be added, (they are deemed to be included in the TW management costs)
Small incidental costs can be charged with a lump sum (max 10 EUR per trainee/day)
Special rules for traineeships, fees for training
42.
IMPLEMENTATION AND REPORTING
43. REPORTING REQUIREMENTS
Interim Quarterly Reports
Final Report
44. REPORTING REQUIREMENTS Reports shall consist of a content section and a financial section
RTA is responsible for submitting them to the concerned authority
The BC Project Leader is fully involved in this process and should be given adequate time to put forward comments. S/he must also co-sign each report
45. INTERIM QUARTERLY REPORTS Describe progress in the implementation making direct reference to the timetables and benchmarks
Update on the general environment, assumption and risks
Make an overall evaluation of the progress achieved
document the actual expenditure in relation to budgeted expenditure
Provide recommendations
46. FINAL REPORT
Executive summary of the project
Background information
Listing of objectives, purpose and mandatory results
Implementation process
Achievement of mandatory results
47. FINAL REPORT (II) Analysis of the long-term impact of the project, its sustainable results and identification of potential relevant follow-up actions
Information on visibility of EU financing
Conclusions, recommendations, including lessons to be learned for future Twinning projects
48. FINAL REPORT (III) Proof of transfers of ownership (if applicable) and a final statement of all eligible costs of the Twinning project plus a full summary statement of the Twinning project’s income and expenditure and payments received
Template to be used in ANNEX C5
Expenditure verification report from a recognized, independent auditor
49.
CHANGES TO TWINNING CONTRACTS
50. CHANGES TO TWINNING CONTRACTS
Changes can only be made within the execution period of the contract (legal duration)
Changes cannot be retroactive
There should be no changes to the mandatory results defined in the work plan; the means of achieving these may be adapted to circumstances
51. CHANGES TO TWINNING CONTRACTS Two procedures shall apply:
Addenda
Substantial changes to the Twinning Contract formalized in a formal written addendum to the contract signed by both MS administration and BC administration require prior approval
Side letters
Minor changes are notified to the CA through a side letter signed by both PLs. The notifications must be made by a secure means of communication, so that dispatch can be proven in the event of dispute.
52. ADDENDA (1) Acquis Communautaire related to the project (Article 2 of the Work plan)
Definition of the mandatory results and the benchmarks to be achieved (Articles 3 and 4 of the Work plan)
MS administration involved in the Twinning project (Article 5 of the Contract)
The period of execution (Art 2 of the Contract)
53. ADDENDA (2) Identity of the MS and BC Project Leaders, the RTA and the main MS short-term experts (Article 6 of the Work plan)
Interruption or termination before completion
Major reallocations beyond 15% of the total Budget
Template to be used in ANNEX C12
54. SIDE LETTERS
Changes not affecting basic purpose (means used for implementation, time schedule and dates, identity of non-key MS’ short term experts)
Reallocations below 15% of the total Twinning budget
Template to be used in ANNEX C13
55. BUDGET CHANGES The overall budget of a project cannot be increased
The unit costs (fees, daily allowances, etc.) must respect the rates set in the manual;
Introduction of a new activity must be justified by showing that it will be of real use in achieving the mandatory results targeted by the Twinning Contract; the mere availability of funds is not sufficient to justify the financing of new activities.
Costs for changes notified or approved after their implementation cannot be reimbursed
56. BUDGET CHANGES (2) As long as the budgetary reallocations of appropriations remain under 15% of the total budget for the Twinning project, the changes are effected trough a side letter
All budgetary changes through side letters are summed until the threshold of 15% of the total Twinning budget is reached. As from this moment, all budget modifications require an addendum
57.
PAYMENTS
58. PAYMENT PROCEDURE Article 15 of the General Conditions:
A pre-financing of 80% of the budget for the first 12 months of execution period within 45 days of receipt of:
- the Twinning Contract signed by both parties
- a request for payment (Annex A5)
59. PAYMENT PROCEDURE Further pre-financing: when the MS Twinning partner can demonstrate that more than 70% of the cumulated pre-financing has been consumed, a subsequent pre-financing payment may be requested
Payment should take place within 45 days of receipt of the request further to the endorsement by the Beneficiary of services rendered
60. PAYMENT PROCEDURE Prior to final payment/settlement, the accumulated payment of the initial prefinancing and the successive pre-financing payments may not exceed 90% of the total budget
Final payment: Upon completion of the Twinning project, and subject to approval of the final project report demonstrating that the mandatory result has been achieved, the MS Twinning partner may submit its request for final payment together with the final global financial report accompanied by the expenditure verification report
61. EXPENDITURE VERIFICATION REPORT An auditor must certify that all transactions invoiced by the MS Twinning partner were duly justified in accordance with the established rules and arose solely as a result of the Twinning Contract. Veracity as well as eligibility of the transactions must be audited
The expenditure verification report dispenses MS implementing bodies from submitting original documentary evidence to the contracting authority when requesting payment
62. DOCUMENTATION IN SUPPORT OF INVOICES The MS is obliged to keep full accurate and systematic record and accounts of the activities implemented
Records must be kept for a 7-year period after the last payment made by the BC and the MS
These documents comprise any documentation concerning income and expenditure, inventory necessary for the checking of supporting documents, mission/timesheets, transport tickets, pay slips for experts and other invoices