40 likes | 169 Views
Tables for Equipment Specification. C. Hessler, B. Goddard, M. Meddahi HiRadMat Primary Beam Working Group Meeting 10.12.2009. Magnet Aperture. Magnet Powering. Remarks: - No B190 magnets needed - Position calculated at “sortie” point with respect to SPS extraction point.
E N D
Tables for Equipment Specification C. Hessler, B. Goddard, M. Meddahi HiRadMat Primary Beam Working Group Meeting 10.12.2009
Magnet Aperture C. Hessler, B. Goddard, M. Meddahi
Magnet Powering Remarks: - No B190 magnets needed - Position calculated at “sortie” point with respect to SPS extraction point C. Hessler, B. Goddard, M. Meddahi
Beam Instrumentation * new bodies with LEP buttons ** as used for CNGS C. Hessler, B. Goddard, M. Meddahi