Risk Management Program. Program 2 requirements. Initial startup Normal operations Temporary operations Emergency shutdown and operations. 1a. Program 2 requirements. Normal shutdown Startup following: Normal or emergency shutdown Major change that requires a hazard review. 1b.
E N D
Program 2 requirements • Initial startup • Normal operations • Temporary operations • Emergency shutdown and operations 1a
Program 2 requirements • Normal shutdown • Startup following: • Normal or emergency shutdown • Major change that requires a hazard review 1b
Program 2 requirements • Consequences of deviations • Equipment inspections 1c
Program 3 requirements - steps • Initial startup • Normal operations • Temporary operations • Emergency shutdown 2a
Program 3 requirements - steps • Emergency operations • Normal shutdown • Startup following: • Turnaround • Emergency shutdown 2b
Program 3 requirements • Operating limits • Consequences of deviation • Steps required to correct or avoid deviation 2c
Program 3 requirements- safety and health considerations • Properties of chemicals used in the process • Hazards presented by chemicals used in the process 2d
Program 3 requirements- safety and health considerations • Precautions to prevent exposure • Engineering controls • Administrative controls • PPE 2e
Program 3 requirements- safety and health considerations • Control measures if exposure occurs • Quality control • Special or unique hazards 2f
Program 3 requirements - steps • Safety systems and their functions 2g