An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Guidelines for Energy Efficiency Measure Cost and Non-Energy Benefits Kickoff Meeting August 12, 2011 2:00pm PST For the Regional Technical Forum

  2. Agenda Introductions Scope of work Project timeline Cost collection/analysis approaches Non-energy benefits Project deliverables Project administration Discussion

  3. Introductions: Navigant Consulting Staff

  4. Introductions: RTF and the RTF Subcommittee RTF Subcommittee introductions

  5. Statement of Work • Task 1: Project Management • Kickoff Meeting • Develop Work Plan • Coordinate Staff and Meetings • Bring Together Experts • Task 2 and 3: Develop Guidelines for Measure Cost and NEBs* • Prepare Draft Guidelines for Subcommittee Review • Revise Guidelines for RTF Review • Revised Guidelines and Recommendation Memo • Final Guidelines Presented to the RTF • Task 4: Reports and Presentations *Navigant proposes changing the statement of work to include the intermediate reporting tasks within Tasks 2 and 3. Task 4 will be reserved for the final reporting and presentations to the RTF and the Subcommittee.

  6. Timeline – From Proposal • 5 weeks since proposed project start • Schedule change suggestions: • Shift schedule 4-5 weeks to reflect later start date. • 2011 RTF meetings: October 4, November 1, December 13

  7. Timeline – Revised

  8. Timeline – Revised * indicates a subcommittee meeting. Navigant proposes that all subcommittee meetings be held at 2 pm pacific time. Wednesday, August 31 - submit outlines, sample sections, questions to subcommittee *Wednesday, September 7 - review outline, sample sections, questions Wednesday, September 21 - submit draft guidelines *Wednesday, September 28 - review draft with subcommittee Wednesday, October 12 - submit draft guidelines (if needed) *Wednesday, October 19 - review draft with subcommittee (if needed) Tuesday, October 25 - submit draft to RTF Tuesday, November 1 - RTF meeting *Wednesday, November 2 - Discuss next steps with subcommittee Schedule beyond November 2 will depend on outcome of November RTF meeting if we are going to the December 13 RTF meeting… Wednesday, November 23 - submit draft to Subcommittee *Wednesday, November 30 - review draft with Subcommittee Tuesday, December 6 - Submit draft to RTF Tuesday, December 13 - RTF meeting

  9. Purpose of Measure Costs and NEBs • Used to • determine the cost-effectiveness of energy efficiency measures (e.g. TRC B/C ratio), • plan programs • produce ex-post summary of savings and costs • Cost-effectiveness metrics are beyond the scope of this project. • They are defined by the RTF • Regionally accepted parameter estimates used to compute cost-effectiveness metrics • For each measure, the following inputs are needed • Energy savings (electricity and gas) – Savings Estimation Guidelines (June 1, 2011) • Load shapes (electric and gas) • Measure lifetime – current contract and subcommittee • Upfront costs • Periodic costs (magnitude and frequency)this contract and subcommittee • Non-energy benefits

  10. Defining Costs and Non-Energy Benefits • Non-Energy Benefits Quantifiable dollar value • Water • Fuels besides electricity and gas • Soap savings/detergent savings • Local Emissions • Other? • O&M • O&M • Comfort • Water • Quantifiable • Hard toQuantify • Measure Costs • Material equipment • Ancillary materials (piping, etc) • Installation Labor • Define components • Establish templates and predefined structures

  11. Measure Costs - Framing • Defining the Cost Application: • Retrofit (RET) • Replace-On-Burnout (ROB) • New Construction (NEW) • Defining the Cost Basis: • Incremental Measure Costs (current practice baseline) • Full Measure Costs (pre-conditions baseline)

  12. Measure Costs – Guidelines • Use clearly defined technical specifications • Define boundaries and components of systems • Define different measure applications where costs vary widely (e.g. by installation cost variables) • Validate data • Data cleaning • Treatment of outliers • Influence of non-energy features (vendor, location, brand, finish) • Consider the program delivery method in measure costs • E.g, retail cost for rebate, wholesale cost for direct install

  13. Measure Costs –Guidelines • Assess the rigor of cost research required for each measure • How is expected level of rigor expressed in the guidelines? • Should all measures receive the same level of rigor? • Factors • Technical/economic potential (e.g small savers) • Cost-effectiveness • Establish specific conventions for lifecycle costing: • Measure life (and baseline life) →separate subcommittee and contract

  14. Measure Costs - Guidelines • Systematize the pricing process • Standardized workbooks and pricing approaches • Index costing elements to industry recognized methods and resources • R.S. Means • Proxy for labor costs in the absence of primary data • Benchmarking tool for labor and material costs • Provide the ability to update measure costs over time • Contextual data tracking (unique measure ID, source, contact information, etc.) • Identify where specific economic indicators can be used to adjust measure costs. • Consumer Price Index (CPI) • Producer Price Index (PPI)

  15. Measure Costs - Guidelines • Data collection sources may include: • Web pricing • Retail surveys • Manufacturers/Distributors • Contractors • Cost data from industry accepted resources • Point of sales data • Economic statistics & indices

  16. Measure Cost - Analysis Approaches • Arithmetic Mean • Averages all cost observations into a single point estimate and represents the “middle” or “expected” value. • Weighted Average • Similar to the arithmetic mean but assigns more “weight” or “value” to certain data points • Minimum • Used to isolate cost of higher efficiency from cost of other features • Regression Modeling • Attempts to quantify the behavior of an uncertain parameters relative to other observation, and potentially influential, variables • Custom Cost Estimates • Approach is unique to engineered and/or technically complex types of measures (e.g. EMS systems) • Often involves building up costs for various components through different resources

  17. Non-Energy Benefits • Definition • “Quantifiable” – need to provide clarity on what this means (what level of certainty?) • Maybe this is left intentionally vague? • Need to quantify benefit • Need to value benefit • Many of same issues as with MEASURE cost • Rigor - Assess the rigor of research required for each measure • Establish specific conventions for lifecycle benefits

  18. Non-Energy Benefits - Water • Standard water cost analysis? • Use for all measure analyses • Rates by sector, region • Use marginal water costs • Update periodically (for cost and embodied energy) • Sources? • Avoid double counting embodied energy • If you count the embodied energy in water, you need to discount the cost of the water

  19. Non-Energy Benefits – O&M • Standard O&M cost analysis? • Use for all measure analyses • Rates by sector, region • Update periodically (for cost and embodied energy) • When is a labor cost of O&M justified? • Non-residential measures– always? • Residential – never? • Sources?

  20. Non-Energy Benefits – Alternative fuels • Should alternative fuels be considered an NEB? • Propane • wood, oil • These aren’t included in ProCost because they don’t require a load-shape-based analysis • If so, should there be a standard cost analysis?

  21. Questions • Are there other regional experts that we want to solicit for this subcommittee? • Is O&M a cost or NEB? • Aside from cost effectiveness tests and program planning, what are costs and NEBs used for? • Should fuels besides electricity and gas be counted as NEBs? (e.g. propane, oil, wood) • Should the guidelines address rigor? If so, how? • Should all measures receive the same level of rigor? • Factor - Technical/economic potential (e.g small savers) • Factor - Cost-effectiveness (e.g. less rigor for very cost effective measures?) • Factor – Cost-effectiveness sensitivity (e.g. less rigor for relatively small impacts on cost-effectiveness) • When does the RTF reject a cost analysis? • What happens if the RTF rejects a cost analysis? • Should uncertainty in cost and NEB estimates be specified? • Should residential labor be valued?

  22. Questions • Is the word “benefits” in Non-energy Benefits misleading? • E.g. HPWH requires periodic filter replacement. This is a negative benefit. • What about having a Cost workbook that contains all of the most recent, RTF approved costs (water, labor, propane, soap, etc.)? This workbook would be used/referenced when possible for measure analyses.

  23. Project Deliverables • Interim deliverables • outline • sample sections • identification of decision nodes for RTF/RTF subcommittee • e.g. what is an acceptable cost collection method? In what circumstances? • Deliverables • Draft guidelines • Guidelines • Recommendation Memo • Presentations to RTF (first on November 13, 2011. From there, depends on RTF meeting outcome)

  24. Project Deliverables

  25. Project Administration • Frequency of meetings? • With project manager (Adam) • With Subcommittee members (proposed approximately every three weeks) • Expected review period for interim deliverables (proposed one week) • Expected review period for draft guidelines (proposed one week)

  26. Contact Information Floyd Keneipp, Engagement Manager Floyd.Keneipp@navigant.com (925) 930- 2716 Ryan Firestone, Project Manager Ryan.Firestone@navigant.com (925) 930-2708 Sam Piell, Project Coordinator Sam.Piell@navigant.com (925) 930-2711