1 / 4

IEEE 802.1 OmniRAN TG Status Report to IEEE 802 WGs

IEEE 802.1 OmniRAN TG Status Report to IEEE 802 WGs. 2014-05-15. IEEE 802.1 OmniRAN TG Status. FYI: OmniRAN P802.1 PAR: https://development.standards.ieee.org/get-file/P802.1CF.pdf?t=81644900003 The PAR was approved by NesCom on March 26 th , 2014

elke
Download Presentation

IEEE 802.1 OmniRAN TG Status Report to IEEE 802 WGs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.1 OmniRAN TGStatus Reportto IEEE 802 WGs 2014-05-15

  2. IEEE 802.1 OmniRAN TG Status • FYI: OmniRAN P802.1 PAR: https://development.standards.ieee.org/get-file/P802.1CF.pdf?t=81644900003 • The PAR was approved by NesCom on March 26th, 2014 • OmniRAN EC SG was disbanded by the NesCom approval. • An IEEE 802.1 OmniRAN TG was established to take care of the P802.1CF project. • Chair of OmniRAN TG: Max Riegel, NSN • OmniRAN TG maintains a Wiki page on mentor to reflect its status and achievementshttps://mentor.ieee.org/omniran/bp/StartPage • OmniRAN filespace on mentor is used for contributions.

  3. OmniRAN TG Activities • Conference call on April 29th, 2014 • Mainly discussing organizational issues in preparation of its first F2F meeting • Minutes: https://mentor.ieee.org/omniran/dcn/14/omniran-14-0035-00-00TG-apr-29th-meeting-minutes.docx • 1.5 day F2F meeting in Norfolk, VA on May 14th /15th • Part of IEEE 802.1/802.3 Interim • Discussions: • PtP Links by PBB-TE and SDN • Separation of data path and control on reference points of NRM • SDN use cases and requirements • Treatment of backhaul within 802.1CF • Refinement of ToC of 802.1CF • Response on liaison from ITU-T on 802.1CF • Fields of cooperation with other 802.1 TGs

  4. Looking forward to next plenary sessionSan Diego, July 14-20 • Envisioned topics: • Continuation of data path discussions • First draft text on NDS for review with other WGs • Multiple IEEE 802 interfaces on the same link – what are the issues? • Which of the IEEE 802.15 interfaces applies to 802.1CF? • Revision of SDN contribution text • Other topics • Update from ONF Wireless and Mobile WG studies • Contributions to other areas mentioned in the ToC • Contribution template for text contributions • Conference call on July 2nd, 10:00AM ET • Dial-in details on OmniRAN TG Wiki page on mentor

More Related