An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lecture 11 Method Study …

  2. There are two things Motion Study Time Study Method Study …

  3. Motion study … • There is a lot of man-power in garment industry • Everybody is dependent on someone else • Difference in motion level of operators will directly effect the time value • Work results are dependent on Consistency, Work SpeedandTime Wastage

  4. Motion study … Improvement in motion ~ Time wastage Time wastage ~ Production Production ~ Productivity Productivity ~ Profit Profit ~ Prosperity • Therefore Improvement in motion ~ Prosperity

  5. Why motion study? • To determine the optimum work • To standardize the work • To train the workers • To manage the work

  6. How to Analyze? • There may be four methods • Inspection by listening • Direct observation • Conducting VTD • PTS

  7. 1- Inspection by listening … • Inspection is performed by listening the opinion of operators and supervisors • USES: • To grasp the outline of work prior to making the observation • To support any insufficient point of observation • To inspect special/irregular work

  8. 2- Direct observation … • This is the most commonly used method. Steps involved are as follows • Determine the target work • Process which produces a high proportion of defects, Process which uses expensive equipment etc • Prepare an inspection form • Enter the items of inspection on inspection form • Draw up an action improvement plan • Determine a new working method

  9. 3- Conducting VTD • VTD stands for Video Type Discussion. It has been proven to be very effective • You can show a video of inefficient work to make operators realize their negligence • You can show a video of improved work for training purpose • Videos can be used as standards for reference purpose

  10. 4- PTS … • PTS stands for Pre-determined Time Standards. We can determine working standards before starting actual work

  11. Advantages of PTS … • Rating is eliminated when setting the standard time • The work plan can be checked on the basis of numerical data before starting work • Since we have a very detailed data so it will be effective for short cycles • No stop watch is required

  12. Disadvantages of PTS … • To learn how to use this method, special training and appropriate skills are required • A detailed analysis requires a great deal of time • The time required for machine work needs to be measured separately

  13. MTM (Method’s Time measurement… • “A system of pre-determined time values used to analyze manual operation and where a time value is assigned to each motion determined by the nature of the said motion and the conditions under which it is performed”

  14. MTM … • Units used for the MTM 1TMU (Time Measurement Unit) = 0.00001 hr 1TMU (Time Measurement Unit) = 0.0006 min 1TMU (Time Measurement Unit) = 0.036 sec 1 second = 27.8 TMU 1 minute = 1,667 TMU 1 hour = 100,000 TMU

  15. Basic Actions and Symbols … R = Reach M = Move T = Turn AP = Apply pressure G = Grasp P = Position RL = Release D = Disengage ET = Eye Travel Time EF = Eye Focus BM, LM, EM = Body, Leg and Foot Movement