RTCASS/RTCASS-HP LRG Brief GySgt Chad George June 2010. UNCLASSIFIED. RTCASS FAMILY. INTRODUCTION. RTCASS/RTCASS-HP Next generation CASS family of ATE testers Eventually replace all Marine Corps legacy ATE; Including legacy CASS Operating environment

ella
Download Presentation

RTCASS/RTCASS-HP LRG Brief GySgt Chad George June 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTCASS/RTCASS-HPLRG BriefGySgt Chad GeorgeJune 2010 UNCLASSIFIED

  2. RTCASS FAMILY

  3. INTRODUCTION • RTCASS/RTCASS-HP • Next generation CASS family of ATE testers • Eventually replace all Marine Corps legacy ATE; Including legacy CASS • Operating environment • RTCASS is housed in a single-wide MMF • Also has a free-standing capability • RTCASS-HP is housed in a double-wideMMF • RTCASS-HP • The HPDTS is reused with the RTCASS • A Bridge Unit marries the two assemblies together • WCU is reused

  4. RTCASS Fielding Plan RTCASS installed in MMFs at North Island by install team, and shipped to respective MALS RTCASS delivered without removal of legacy until a suitable operational amount of RTCASS is in place; then legacy begins to come out Install team performs initial OSV on-site Subsequent deliveries received at MALS by Marines, not install teams Hard Sites (AFSOC, FSTs, CNATT, etc) shipped directly from production facility at Teradyne RTCASS-HP installed by North Island install team, once RTCASS-HP up and operational, install team removes CASS-HP Done in the same visit One for one swap in most cases Will not remove any capability from the MALS 4

  5. MALS 11 TSA CASS INSTALLS CFG DATE HYB (1) Installed RF (1) Installed EO3 (1) Installed RFHP (1) Installed RTCASS (6) Installed RTHP (1) AUG 10 LEGACY ATE REMOVAL ATE DATE ARM-146 MAY 10 IATS (1) MAY 10 CASS HYB (1) MAY 10 CASS RF (1) MAY 10 CASS RFHP (1) AUG 10 NEWTS OCT 10 HTS (2) FEB 11 CASS EO (1) FY 11

  6. MALS 11 CCSP/FOSP CASS INSTALLS CFG DATE HYB (3) CCSP Installed RF (3) CCSP Installed CNI (1) CCSP Installed EO3 (1) CCSP Installed RFHP (2) CCSP Installed RTCASS (2) CCSP Installed RTCASS (1) CCSP JUNE 10 RTCASS (3) CCSP NOV 10 RTCASS (3) CCSP FY 11 RTHP (2) CCSP SEP 10 EO3 (1) FOSP Installed RTCASS (4) FOSP FY 11 RTHP (1) FOSP OCT 10 LEGACY ATE REMOVAL ATE DATE ARM-146 MAY 10 IATS (2) MAY 10 CASS RFHP(2) SEP 10 CASS HYB (3) SEP 10 CASS RF (1) SEP 10 NEWTS JUL 10 CASS RF (2) JAN 11 HTS (4) FEB 11 CASS EO (2) FY 11 CASS CNI TBD

  7. MALS 12 CCSP/FOSP LEGACY ATE REMOVAL ATE DATE ARM-146 MAY 10 DTB MAY 10 IATS MAY 10 TTS MAY 10 CATIIID (1) JUN 10 RADCOM (2) JUN 10 NEWTS (2) JUL 10 CASS RF (2) DEC 10 CASS HYB (2) DEC 10 HTS (4) FEB11 CASS RFHP (2) MAR 11 CASS EO (1) FY 12 CASS CNI TBD CASS INSTALLS CFG DATE HYB (3) CCSP Installed RF (2) CCSP Installed CNI (1) CCSP Installed EO3 (1) CCSP Installed RFHP (2) CCSP Installed RTCASS (9) CCSP Installed RTHP (2) CCSP MAR 11 EO3 (1) FOSP Installed

  8. MALS 13 CCSP CASS INSTALLS CFG DATE HYB (3) CCSP Installed RF (3) CCSP Installed * EO3 (1) CCSP Installed ** RFHP (2) CCSP Installed RTCASS (7) CCSP Installed RTHP (1) CCSP JULY 10 RTHP (1) CCSP AUG 10 * 1 BLK I RF ** EO Console removed LEGACY ATE REMOVAL ATE DATE CASS RF (1) TBD * ARM-146 MAY 10 NEWTS (2) JUL 10 CASS RFHP (1) JULY 10 CASS EO (1) JUN 10 CASS RFHP (1) AUG 10 CASS RF (2) DEC 10

  9. MALS 14 TSA CASS INSTALLS CFG DATE RTCASS (3) Installed RTHP (1) JUN 12 * LEGACY ATE REMOVAL ATE DATE ARM-146 (1) MAY 10 * RE-SITE From CP FST

  10. MALS 14 CCSP/FOSP CASS INSTALLS CFG DATE HYB (1) CCSP Installed RF (2) CCSP Installed CNI (1) CCSP Installed RFHP (2) CCSP Installed RTCASS (9) CCSP Installed RTHP (2) CCSP Installed RFHP (1) FOSP Installed RTCASS (1) FOSP Installed RTCASS (1) FOSP JUNE 10 RTHP (1) FOSP JULY 10 RTHP (2) FOSP NOV 10 LEGACY ATE REMOVAL ATE DATE TTS (2) TBD CASS RFHP (1) FOSP JULY 10 CATIIID (2) JUN 10 RADCOM (3) JUN 10 NEWTS JUL 10 CASS RF (2) DEC 10 CASS HYB (1) DEC 10 GACT/GRAD (3) DEC 11 CNI FY 12

  11. MALS 31 CCSP/FOSP CASS INSTALLS CFG DATE HYB (2) CCSP Installed RF (2) CCSP Installed CNI (1) CCSP Installed EO3 (1) CCSP Installed RFHP (2) CCSP Installed RTCASS (8) CCSP Installed RTHP (1) CCSP OCT 10 RTCASS (1) CCSP OCT 10 RTHP (1) CCSP JAN 11 RFHP (1) FOSP Installed EO3 (2) FOSP Installed RTCASS (1) FOSP OCT 10 RTCASS (3) FOSP DEC 10 RTHP (1) FOSP JAN 11 LEGACY ATE REMOVAL ATE DATE ARM-146 (2) MAY 10 IATS (2) MAY 10 NEWTS (2) JUL 10 CASS HYB (2) JUN 10 CASS RFHP CCSP (1) OCT 10 CASS RF (2) DEC 10 HTS (4) JAN 11 CASS RFHP (2) JAN 11 CASS EO (3) FY 11 CNI TBD

  12. MALS 41 CCSP CASS INSTALLS CFG DATE HYB (2) CCSP Installed RF (2) CCSP Installed CNI (1) CCSP Installed EO3 (1) CCSP Installed RFHP (1) CCSP Installed RTHP (1) CCSP FEB 11 RTCASS (4) CCSP FEB 11 RTCASS (2) CCSP JUN 11 LEGACY ATE REMOVAL ATE DATE ARM-146 MAY 10 IATS MAY 10 NEWTS (2) OCT 10 CASS RFHP (1) JAN 11 CASS HYB (2) JUN 11 CASS RF (2) SEP 11 HTS (2) SEP 11 CASS EO (1) FY 11 CNI TBD

  13. R/W MALS SITES SITE RTCASS / DATE MALS 16 CCSP (1) Installed (1)JUL 10 (1) FY 11 MALS 24 CCSP (3) JUL 15 MALS 26 CCSP (3) Installed (3) FY 11 MALS 26 TSA (4) Installed MALS-29 CCSP (1) FY 11 (1) FY 13 (2) FY 17 13

  14. R/W MALS SITES SITE RTCASS / DATE MALS 36 CCSP (3) JAN 13 (2) JAN 15 MALS 39 CCSP (3) JUL 12 (2) TBD MALS 39 TSA (2) OCT 10 MALS 49 CCSP (4) JAN 17 (Res. Regional Maint.) MCAF Quantico (3) JUN 11 – (HMX-1) 14