An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sherman Avenue SubdivisionFEIS Review on behalf of PEPA The Louis Berger Group, Inc.

  2. STEEP SLOPE COMPLIANCE • “It should be noted that the Applicant purchased its property prior to the enactment of the Steep Slope Law and filed the current application before the law was adopted.” • The Steep Slope Law does not provide for “Grandfathering” and fully applies to the Sherman Oaks project.

  3. STEEP SLOPE COMPLIANCE • Review by Planning Board • Applicant Burden of Proof • Failure to Meet Steep Slope Review Standards

  4. STEEP SLOPE COMPLIANCE • Review by Planning Board • the Planning Board (rather than the Building Inspector) is the approval authority for all applications specified in § 199-5B and that, consequently, the term "Planning Board" shall be substituted for the term "Building Inspector" • Applicant Burden of Proof of No Alternative • Failure to Meet Steep Slope Review Standards

  5. STEEP SLOPE COMPLIANCE • § 199-6D Review standards Compliance • minimize flooding • best use of the natural terrain and aesthetic character • terracing of building sites is kept to a minimum • Habitat is quantified and protected • Applicant Burden of Proof of No Alternative • Failure to Meet Steep Slope Review Standards

  6. STEEP SLOPE COMPLIANCE • Applicant Burden of Proof of No Alternative • No on-site alternatives that substantially reduce impacts • Impacts of on-site alternatives not analyzed • On-site Alternative are not practicable (Strawman) • No Off-Site Alternatives analyzed

  7. STEEP SLOPE COMPLIANCE • CONCLUSION: • Failed to meet: • Steep Slope Review Standards • Burden of Proof of absence of practicable alternatives • REMEDY: • Applicant provide Planning Board with additional information to fill data gaps • Public comment period extended