100 likes | 284 Views
Automated Refuelling Station. Team FuelBot. Introduction. Purpose – to design an automated refuelling station for elderly and disabled persons Working alongside Sigjaws Charitable Trust to create a solution to on-going service station issues
E N D
Automated Refuelling Station Team FuelBot
Introduction Purpose – to design an automated refuelling station for elderly and disabled persons Working alongside Sigjaws Charitable Trust to create a solution to on-going service station issues The automated refuelling station should perform all necessary tasks for the user to refill their vehicle
Scope and Deliverables Design and construction of a robotic end effector Development of software to control the motion path of the robot Development of a vision system Construction of a test rig for analysis Technical engineering report
Workstreams Phase 1: Project Proposal Phase 2: Mechanical Design Phase 3: Software Design Phase 4: System Integration Phase 5: Review
Phase 1: Project Proposal Phase 2: Mechanical Design Phase 3: Software Design Phase 4: System Integration Phase 5: Review Current Status • Developed proposal for Sigjaws • Main Outline • Detect and open fuel flap • Remove cap if necessary • Grasp fuel nozzle • Insert nozzle into vehicle
Phase 1: Project Proposal Phase 2: Mechanical Design Phase 3: Software Design Phase 4: System Integration Phase 5: Review Current Status Fuel Flap Opener Fuel Cap Opener Fuel Nozzle Gripper Stereo Vision Industrial Robotic Arm
Phase 1: Project Proposal Phase 2: Mechanical Design Phase 3: Software Design Phase 4: System Integration Phase 5: Review Future Work • Phase 3: Software Design • - Mount end effector on robot • - Motion paths for • - Opening flap • - Picking up nozzle • - Filling Car 18th July - 27th August
Phase 1: Project Proposal Phase 2: Mechanical Design Phase 3: Software Design Phase 4: System Integration Phase 5: Review Future Work Phase 4: System Integration - Integrate computer vision 14th August – 9th September Phase 5: Review -Evaluation and Testing 28th August – 14th October Future Costs