100 likes | 246 Views
Agenda. Southline Project Update Study Design Line Flow Summary Voltage Summary Outage Summary Feedback & Next Steps. o. 2. The Southline. New 345 kV Afton-Columbus-Hidalgo-Apache Upgrade Apache-Bicknell to 345/230 double New 500 kV Bicknell- Hassayampa 2000 MW New Generation
E N D
Agenda • Southline Project Update • Study Design • Line Flow Summary • Voltage Summary • Outage Summary • Feedback & Next Steps o 2
The Southline • New 345 kV Afton-Columbus-Hidalgo-Apache • Upgrade Apache-Bicknell to 345/230 double • New 500 kV Bicknell-Hassayampa • 2000 MW New Generation • 2014 SATS Heavy Summer Case PHOENIX Hass/ PV Pinal West TUCSON LAS CRUCES 333 MW Bicknell Afton Apache Hidalgo Existing Lines 333 MW 500 kV 345 kV Columbus 230 kV 500 MW 500 MW 115kV EL PASO Preferred Route 333 MW Proposed Upgrade 500 kV Proposed Upgrade 345 kV Proposed New Build 345 kV 3
Line Flow Delta Summary (MW) MEAD SPRINGER WINCHESTER 196 24 307 24 PERKINS GREENLEE 86 WILLOW DEVERS 307 VAIL 197 WESTWING 333 311 315 AFTON 119 PALO VERDE LUNA 234 77 79 177 336 521 SOUTH 47 HASSYAMP 256 HIDALGO NEWMAN 333 PINAL SOUTH 500 725 649 DIABLO BICKNELL 87 864 APACHE 353 738 500 22 PINAL WEST COLUMBUS 333
Contact Information Black Forest Partners, LP Doug Patterson 31 Purchase Street, Ste. 3-1 Rye, NY 10580 doug@blackforestpartners.com 914 305 5511 William Kipp 275 Battery Street, 16th floor San Francisco, CA 94104 bill@blackforestpartners.com 415 244 3540 Utility Systems Efficiencies, Inc (USE) 2108 Marchita Way Carmichael, CA 95608 www.useconsulting.com Fontana Energy Associates, LLC (FEA) 24 Arbuelo Way Los Altos, California 94022 www.fontanaenergy.com Stoel Rives, LLP 900 SW Fifth Avenue, Ste. 2600 Portland, OR 97204 www.stoel.com 10