An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 肆、治理成效

  2. 經濟部水利署 尖石鄉秀巒壩魚梯及其上游護岸整治復育工程 治理前 完工後

  3. 宇內溪庫邊(和平橋上游)復育工作 治理前 完工後

  4. 行政院農業委員會林務局 大溪事業區第153林班崩塌地復育工程 • 工程改善內容: • 崩塌地復育8,570m2 • 噴漿溝110m 目前復育情形 災害後 完工時

  5. 大溪事業區第43林班崩塌地復育工程 • 工程改善內容: 掛網噴植601m2 噴漿溝193m • 打樁編柵2604m2 • 種數苗521株 目前復育情形 災害後 完工時

  6. 交通部公路總局 交通部公路總局96年 台7線38K+180~42K+180段5處水土保持工程 • 工程改善內容: • 邊坡改善1,438m2 災害後 集水區保育後

  7. 交通部公路總局96年 台7線37K+900~38K+100段水土保持工程 • 工程改善內容: • 邊坡改善8,610m2 • 截水溝154m 災害後 集水區保育後