1 / 23

TOTAL ACCIDENTS (RB)

TOTAL ACCIDENTS (RB). Targets for next year. Overall reduction of 10% in consequential train accidents. Action plan to achieve the target. 1. Monitoring of action plan targets fixed by various departments. 2. Conducting super checks and Safety Audit inspection

elvis-kirby
Download Presentation

TOTAL ACCIDENTS (RB)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOTAL ACCIDENTS (RB)

  2. Targets for next year Overall reduction of 10% in consequential train accidents. Action plan to achieve the target • 1. Monitoring of action plan targets fixed • by various departments. • 2. Conducting super checks and Safety Audit inspection • and point out the deficiencies to the concerned departments. • 3. Regular inspections, foot plate and night inspections. • 4. Surprise and ambush checks. • Organising safety seminars, safety drives, special drives, • nukkar natak etc. • 6. Use of print and electronic media to educate the road users.

  3. Initiatives taken during 07-08 • Procurement of illuminating flare signal (fusees) stopped over N. Rly thus saving substantial revenue expenditure. • Discrepancy in slot vis-a-vis taking off signal at TKD was • investigated and a special drive to check meggering of S&T • cables at regular interval was launched to avoid short • circuiting of conductors of signalling cable. • Starter signal of PF No.7 at NDLS was got shifted to avoid • parallax to drivers of trains to avoid derailments on this • account. • Instruction issued by Board regarding revamping of Safety • organisation was got implemented on N. Rly by posting • Sr. DSO from multi-disciplines and repatriating the previous • Sr. DSO from traffic streams to Sr. DOM / DOM (Safety) to • improve traffic safety on two divisions.

  4. 5. The progress of SRSF works and Safety Action • Plan targets of various departments were monitored. • Implementation of RSRC and HLDMC recommendations • was monitored as only 8 & 3 recommendation pending as • on 31/3/08 for implementation against 9 & 12 as on 31/3/07 • respectively. • 7. 6 no. of Safety Audit inspection were conducted. • Master correction slip no.1 of 2008 was got issued for gate • working instructions to improve smooth passage of road • traffic across manned LC gates.

  5. Order was got issued for releasing of rakes at stations • where gradient is more than 1 in 400 to avoid rolling down • of rakes into block section. • Administrative approval for interlocking of 130 no. of gates • was taken from the G.M. • D&AR cases got finalised i.e. 5 no. of D&AR pending as on • 31/3/08 against 18 no. as on 31/3/07. • Lack of basic infrastructure at L-xing gates was pointed • out. • Master correction slip was got issued for verification of • complete arrival of trains at stations provided with BPAC.

More Related