PSI Contact • PSI visit arranged for Feb 9th • Assessment of activity/contamination • Possible remedial action • Seek additional equipment for solenoid • Power supply • Control system • Seek help for installation at a later stage • PSI have the experience • Augments UK installation effort (for free) • Ownership status of equipment • Disposal issues • MoU between CCLRC & PSI ?
ASTeC • Discussions with ASTeC RF group • Will take over in next 6 mo overlap • Equipment form LBNL • Ship to DL • Strip down • Technical assessment • Plan for a test stand at DL
Shutdown work plan • Prior: • Contract to cut hole (KP to sign job order) • ISIS Synchrotron Beam Components • Beam plug (concrete filled steel tube) • During cool down period: • Clear MICE side of wall • Tent and prepare • During: • Clear Synchrotron side of wall • Tent and prepare • Pilot hole • Circular aperture • Clear up • Post: • Install plug • Reinstate shielding