My Rights – My Voice (MR – MV). Work Package 5: Quality Assurance. Status quo – Juli 2013. Qualitiy Assurance is important for all Workpackages The duration of the workpackage goes across the entire lifetime of the project
E N D
My Rights – My Voice (MR – MV) Work Package 5: Quality Assurance
Status quo – Juli 2013 • Qualitiy Assurance isimportantfor all Workpackages • Theduration of theworkpackagegoesacrosstheentirelifetime of theproject • ThebasisdocumentsforthisWorkpackagearetheworkpackages in theapplication and thequalityassurance plan
Qualityassurance - Tasks • Creation of quality plan (5.1.) Evaluation of WP 1 (5.2.) – 30.05.2014 • Evaluation of WP 2 (5.3.) – to discuss Evaluation of WP 3 (5.4.) – cooperationwith Karen Evaluation of WP 4 (5.5.) – Draft 04.07.2014 Evaluation of WP 6 (5.6.) – 30.09.2014 Interim Revue (5.7.) – 30.09.2014 it was canceld (extern Auditor)