1 / 4

My Rights – My Voice (MR – MV)

My Rights – My Voice (MR – MV). Work Package 5: Quality Assurance. Status quo – Juli 2013. Qualitiy Assurance is important for all Workpackages The duration of the workpackage goes across the entire lifetime of the project

elyse
Download Presentation

My Rights – My Voice (MR – MV)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. My Rights – My Voice (MR – MV) Work Package 5: Quality Assurance

  2. Status quo – Juli 2013 • Qualitiy Assurance isimportantfor all Workpackages • Theduration of theworkpackagegoesacrosstheentirelifetime of theproject • ThebasisdocumentsforthisWorkpackagearetheworkpackages in theapplication and thequalityassurance plan

  3. Qualityassurance - Tasks • Creation of quality plan (5.1.) Evaluation of WP 1 (5.2.) – 30.05.2014 • Evaluation of WP 2 (5.3.) – to discuss Evaluation of WP 3 (5.4.) – cooperationwith Karen Evaluation of WP 4 (5.5.) – Draft 04.07.2014 Evaluation of WP 6 (5.6.) – 30.09.2014 Interim Revue (5.7.) – 30.09.2014 it was canceld (extern Auditor)

More Related