Southern WV 340 Environmental Infrastructure Program Sherry Adams 340 Program Manager
Southern WV Environmental InfrastructureSection 340 Webster Krouts Creek Cabell Kilsyth Nicholas Pocohontas Lincoln Fayette County Wayne Boone Fayette Boone County Greenbrier Marsh Fork Raleigh Logan Cool Ridge / Flattop and Piney Creek Mingo Gilbert Wyoming Summers Monroe McDowell Pageton Mercer Mercer Co. and Oakvale Road
Southern WV Environmental Infrastructure – Section 340 • Authorized by WRDA 92 (Sec. 340) • Amended by WRDA 96 (Sec. 359) • Amended by WRDA 99 (Sec. 368) • Increased authority to $40M • Amended by WRDA 2000 (Sec. 550) • 75 / 25% cost share • Inventory of needs – $1.1B • Scope • Water and wastewater • Surface water resource protection and development • Environmental restoration • $20.2M Appropriated thru FY 05 • $750K Appropriated in FY 06 (Corps) • $2M ARC
Kilsyth / Mt. Hope Environmental Infrastructure • Water quality improvement project • Part of a comprehensive watershed restoration plan for Dunloup Creek • Phase I – Design of Kilsyth Collection System and upgrade of Mt. Hope wastewater treatment plan (WWTP) • Phase II – Construct WWTP upgrade at Mt. Hope • Phase III – Construct Kilsyth collection system • Total Corps Project Cost – $2.5M • Design cost – $340K • Construction cost – $2.1M • Local Sponsor – City of Mt. Hope (25%) • Source of Non-Federal funds – SCBG, DEP Stream Restoration Funds, SRF Loan • Current Status • Initiate Phase II – Mt. Hope WWTP construction
Cool Ridge / Flat Top Environmental Infrastructure • Construction of new WWTP, pump station, force main and collection system • Total Corps Project Cost – $3.6M • Local Sponsor – Shady Spring PSD (25%) • Source of Non-Federal funds – SRF Loan, IJDC Loan, Flat Top Lake Grant • Current Status • Initiated construction Dec 05
Boone County PSD Environmental Infrastructure • New WWTP and collection system to improve local environment • Total Corps Project Cost • Design Cost - $450K • Construction Cost - $2M • Local Sponsor – Boone County PSD (25%) • Source of Non-Federal funds – SCBG, ARC grant, IJDC loan, IJDC grant • Current Status • Execute construction agreement and initiate construction of WWTP
Krouts Creek Environmental Infrastructure • Stormwater diversion • 5’ x 9’ underground box culvert • 1,250 feet long • Total Project Cost – $3.3M • Local Sponsor – City of Huntington (25%) • Source of Non-Federal funds – WVCA, City of Huntington • Current Status • Complete construction Mar 06
Piney Creek Interceptor Environmental Infrastructure • Replacement of gravity sewer line • In close proximity to Whitestick Creek and runs through the incorporated Town of Mabscott • Total Corps Project Cost – $1.3M • Local Sponsor – Beckley Sanitary Board (25%) • Source of Non-Federal funds – Beckley Sanitary Board • Current Status • Execute design / construction agreement Feb 06 • Initiate construction Mar 06
Oakvale Road PSD Environmental Infrastructure • Water system extension/upgrade to Southern Hollow Road • Serves 30 new customers • Additional phases allow potential of providing water service and fire protection to another 1,100 customers • Total Project Cost – $830K • Local Sponsor – Oakvale Road PSD (25%) • Source of Non-Federal funds – State Digest, WVAWC, Mercer Co. Commission, IJDC Grant • Current Status • Initiate construction Mar 06 • Complete construction Aug 06