BOMA: Achieving High Performance Through Innovation

A Business Case for Multi-Tenanted Office Buildings Creating a Win for Owners, Managers and Tenants. Richard W. Greninger, CPM Vice Chair, BOMA International Managing Partner, Operations Carr Properties Washington, DC. BOMA: Achieving High Performance Through Innovation. 210,655 sq. ft.

emele
Download Presentation

BOMA: Achieving High Performance Through Innovation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Business Case for Multi-Tenanted Office BuildingsCreating a Win forOwners, Managers and Tenants Richard W. Greninger, CPM Vice Chair, BOMA International Managing Partner, Operations Carr Properties Washington, DC BOMA: Achieving High Performance Through Innovation

  2. 210,655 sq. ft. • 2 level garage with 203 spaces • Built in 1979 • Owners: • 1575 Eye St LP • American Society of Association Executives • AETNA • Carr Properties, Managing Partner 1575 Eye Street, NWWashington, DC 20005 BOMA: Achieving High Performance Through Innovation

  3. Occupancy Profile / Major Tenancy • American Society of Association Executives (ASAE) • 40,516 sf (20%) • Veteran’s Affairs (VA) • 63,798 sf (30%) • Federal Aviation Administration (FAA) • 54,942 sf (26%) • 76% of the building occupied by three tenants   • 56% expiring leases in 2010 and 2011 (VA and FAA) BOMA: Achieving High Performance Through Innovation

  4. Energy Efficiency Retrofit Profile • Replaced two chillers totaling 550 tons with two high efficiency chillers & replaced two cooling towers with new high efficiency towers, reduced from four fans and four motors to two fans controlled by a VFD • Replaced domestic water boost pumps with new high efficiency booster pump system with VFD’s • Installed soft start on central plant supply and return fans to control peak demand • Replaced 10-ton elevator lobby unit with high efficiency unit BOMA: Achieving High Performance Through Innovation

  5. Energy Efficiency Retrofit Profile • Complete building lighting retrofit from F-40’s to T-8 lights, also installed sensors in all public restrooms and replaced light switches with motion control during new tenant build outs • Demand Management • Installed energy modeling/management system and upgraded building-wide EMS system to “state of the art,” and incorporated Constellation Demand Response Program. • Supply Management • Renegotiated electric supply contract with Constellation Energy, reducing cost 25%. BOMA: Achieving High Performance Through Innovation

  6. BOMA: Achieving High Performance Through Innovation

  7. High Performance ROI • Energy Efficiency Retrofit Cost $ 963,000 • Annual Reduction in Electric: • Consumption 1,056,246 KWH (21.5%) • Cost Savings (2012) $ 220,000 • Annual R&M Savings $ 20,000 • Annual Rental Revenue (VA & FAA) $ 5,471,881 • Total Savings $ 5,711,881 • Payback Ratio (Total) $ 963,000 / 5,711,881 = 2.1 mth • Payback Ratio (Energy Only) $ 963,000 / 240,000 = 4 years BOMA: Achieving High Performance Through Innovation

  8. Benefits • Owners • Retained 56% of tenancy preserving $5.5 million in gross income • Long-term viability of investment • GSA and Class A tenancy evaporation • Instantaneous payback of investment and value enhancement • Projected $15,000,000 value gain (Revenue and Cap-rate improvement) • Achievement of sustainability goals BOMA: Achieving High Performance Through Innovation

  9. Benefits • Managers • Operational performance efficiency • Achievement of sustainability goals. Energy Star rating of 85 • Income/fee enhancement • Job preservation (20 positions) • Tenants • Consistency of workplace environment • Achievement of sustainability goals • Greater employee productivity • Reduction in gross rent payments BOMA: Achieving High Performance Through Innovation