1 / 6

PNPI INTAS Report Task 2.2. Monitoring of the Grid infrastructure state. Ryabov Yu.F. 2006

PNPI INTAS Report Task 2.2. Monitoring of the Grid infrastructure state. Ryabov Yu.F. 2006. DB. GRIS. DP. MDC. BDII. SI. RDC. RGMA. UI. General Structure. GRIS , BDII and RGMA are the external data sources MDC – MDS Data Collector RDC – RGMA Data Collector DB – DataBase

emiko
Download Presentation

PNPI INTAS Report Task 2.2. Monitoring of the Grid infrastructure state. Ryabov Yu.F. 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PNPI INTAS ReportTask 2.2. Monitoring of the Grid infrastructure state.Ryabov Yu.F.2006

  2. DB GRIS DP MDC BDII SI RDC RGMA UI General Structure • GRIS, BDII and RGMA are the external data sources • MDC – MDS Data Collector • RDC – RGMA Data Collector • DB – DataBase • DP – Data Processor • SI – Service Interface • UI – User Interface

  3. Resources Attributes Views ID Name ID Name Type ID Name Type 1 1 1 ∞ ∞ ∞ ∞ VID RID RID AID Time Value Bindings Rawdata ∞ ∞ ∞ 1 ID Name Type Value PID RID AID Time Statdata Parameters Data Schema

  4. Functions of Data Processor • Estimation of an attribute value and deviation (predictability) for load-related attributes: number of free job slots, queue length, job waiting time. • Detection of a resource failure/recovery periodicity. • Calculation of reliability-related parameters: time between failures, recovery time. • Estimation of a next resource failure time based on mean TBF and TBF deviation. • Estimation of a next resource failure period based on mean TOF and TOF deviation. • Determination of a “failure-safe” resources for a specified job.

  5. User Web Interface User Info Menu Resource parameters

  6. Final Results • Complete software suite is developed • Installed and working at PNPI • 5.7 Gb of statistical data collected up to now • Open to future improvements (integration with new MW and so on)