SUB 1 : SG SENARUT HILIR @ SG MUAR

SUB 1 : SG SENARUT HILIR @ SG MUAR. DAERAH : SEGAMAT LAPORAN KEMAJUAN DAN STATUS PELAKSANAAN DEEP STATUS SEHINGGA: JUN 2012. PETA TABURAN ADUAN AWAM. Sub- Lembangan Sg Senarut Hilir. Kawasan Tumpuan Aduan. Lembangan Sg . Muar. BANJIR. SALIRAN BANDAR. PENGURUSAN SUNGAI & RIZAB.

emmett
Download Presentation

SUB 1 : SG SENARUT HILIR @ SG MUAR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUB 1 : SG SENARUT HILIR @ SG MUAR • DAERAH : SEGAMAT • LAPORAN KEMAJUAN DAN STATUS PELAKSANAAN DEEP • STATUS SEHINGGA: JUN 2012

  2. PETA TABURAN ADUAN AWAM Sub-LembanganSgSenarutHilir KawasanTumpuanAduan Lembangan Sg. Muar BANJIR SALIRAN BANDAR PENGURUSAN SUNGAI & RIZAB SUMBER AIR & ALAM SEKITAR SEMPADAN DAERAH BASIN SG MUAR

  3. SUB LEMBANGAN SUNGAI SENARUT HILIR Sungai Muar KawasanTadahanSgSenarutHilir Sungai SenarutHilir Daerah Segamat = 2851.36 KM² Basin Sg Muar = 6,137.801 KM² Sub Basin SgSenarutHilir = 40.74 KM²

  4. ISU DAN KEKANGAN DIHADAPI

  5. KAEDAH PEMILIHAN SUB LEMBANGAN

  6. MASALAH DI SUB LEMBANGAN DIPILIH

  7. RUMUSAN ADUAN ANALISIS ADUAN DALAM SUB LEMBANGAN DATA ADUAN Majoritiaduanadalahberkenaanbanjiriaitu40% daripadakumulatifaduan yang diterimadariJanuari2009 sehinggaDisember 2011. Yang keduaaduantertinggiadalahberkaitanSungai danKoridoryang rata-ratanyadilihatsebagaikurangsempurnadikawasansekitar sub lembanganSgSenarutHilir.

  8. SUB 1 : SG SENARUT HILIR @ SG MUAR DESCRIBE

  9. PENERANGAN ISU DALAM SUB LEMBANGAN • Masalahbanjirberlakudikawasan Kg. Bankong, Kg. Awatdan Kg. Merigi. • Aduandaripada stakeholder danpenduduktempatan. • Mengakibatkankerugianhartabenda.

  10. LOKASI YANG SERING BERLAKU BANJIR SUNGAI MUAR SUNGAI SENARUT HILIR

  11. SUB 1 : SG SENARUT HILIR @ SG MUAR EXPLAIN

  12. MASALAH UTAMA - BANJIR • Masalahbanjirberlakudi Kg. Bankong. Kg. Awatdan Kg. Merigi. • Terdapatpenempatanperkampungandikawasantanahrendah. • Sungai Muar tidakdapatmenampungjumlahcurahanhujan yang lebatdanmenyebabkanluahan air dikawasan sub lembanganiniberlaku.

  13. PIHAK BERKEPENTINGAN

  14. SUB 1 : SG SENARUT HILIR @ SG MUAR EVALUATE

  15. INVENTORI MAKLUMAT Kajian MaklumatTambahan - Tiada - Pembentungdibinaolehpemaju (MDS) Sebahagianparitutamadibinaoleh JPS dalam sub lembanganini. Maklumat GIS Rumusan Petatopo 1:50,000 (digital) PetaDaerah Segamat Petalembangan –lembangansungaiutamadalamDaerah Segamat Peta Sub-Lembangansungai Petakawasanbanjir Hujan > 100 ARI bolehmenyebabkanbanjirsetinggi 1.0 m disekitarLembangan Sungai Tatat.

  16. SUB 1 : SG SENARUT HILIR @ SG MUAR PRESCRIBE

  17. KESIMPULAN • Jps@komunitimerupakansatupendekatanterbaikdalammelaksanakantanggungJawabdiperingkat Daerah. • Iamerupakansatusistemkerja yang didokumenkansecarateraturmenggunakanaplikasi GIS.

  18. SEKIAN, TERIMA KASIH