310 likes | 428 Views
Compare NDVI and BT from MODIS, AVHRR and VIIRS on 4km Grid. 11/7/2012. GVI Sub-regions for VIIRS 500m VH product. The GVI regions covers latitude zone from 55.152S to 75.024N It was divided into 8 x8 sub-regions with the same size Each region covers 45° x 16.27 ° degree,
E N D
Compare NDVI and BT from MODIS, AVHRR and VIIRSon 4km Grid 11/7/2012
GVI Sub-regions for VIIRS 500m VH product The GVI regions covers latitude zone from 55.152S to 75.024N It was divided into 8 x8 sub-regions with the same size Each region covers 45° x 16.27 ° degree, For VIIRS 500m VH product, each region has 1000x3616 grid cells VGVI.G500m.C01.npp.P2012312_r01c01.nc VGVI.G500m.C07.npp.P2012312_r08c08.nc VGVI.G500m.C07.npp.P2012312.ND_r08c08.nc VGVI.G500m.C07.npp.P2012312.SM_r08c08.nc
VIIRS NDVI vs. SMN (2012,week 27) VIIRS NDVI VIIRS SMN
Aggregated 4km maps • Take mean of valid values within a 4km grid cell. • Compare between below variables: • AVHRR NDVI / SMN • VIIRS NDVI / SMN • MODIS NDVI • Climatology of MODIS • Climatology of AVHRR
MODIS NDVI vs. EVI (2012, period 12) MODIS NDVI MODIS EVI
MODIS Climatology (11 year) vs. AVHRR climatology (30 years) NDVI_MEAN MODIS AVHRR
MODIS Climatology (11 year) vs. AVHRR climatology (30 years) NDVI_MAX MODIS AVHRR Week 29
MODIS Climatology (11 year) vs. AVHRR climatology (30 years) NDVI_MIN MODIS AVHRR Week 29
MODIS NDVI (2012,p=12)vs. VIIRS NDVI (2012,week 29) MODIS NDVI VIIRS NDVI Week 29
MODIS NDVI vs. VIIRS NDVI (2012,week 29) MODIS NDVI VIIRS SMN Week 29
MODIS NDVI (2012,p=12)vs. N19 NDVI (2012,week 29) MODIS NDVI N19 -NDVI Week 29
MODIS NDVI vs. N19 SMN (2012,week 29) MODIS NDVI N19 SMN
AVHRR(N19) MODIS VIIRS
Regression between MODIS-NDVI and VIIRS-NDVI for 2012 • week=20 Period_16days= 8 Y= a +b * X : a= 0.0835132 b= 0.676161 CC= 0.9290 RMSE=0.126013 MeanX= 0.428155 MeanY= 0.373015 • week=21 Period_16days= 8 Y= a +b * X : a= 0.0854498 b= 0.654033 CC= 0.8995 RMSE=0.141027 MeanX= 0.428172 MeanY= 0.365488 • week=22 Period_16days= 9 Y= a +b * X : a= 0.0761164 b= 0.664260 CC= 0.9106 RMSE=0.139756 MeanX= 0.428441 MeanY= 0.360712 • week=23 Period_16days= 9 Y= a +b * X : a= 0.0837967 b= 0.651849 CC= 0.9020 RMSE=0.142544 MeanX= 0.428462 MeanY= 0.363089 • week=24 Period_16days= 10 Y= a +b * X : a= 0.0732078 b= 0.692766 CC= 0.9370 RMSE=0.121182 MeanX= 0.420823 MeanY= 0.364740 • week=25 Period_16days= 10 Y= a +b * X : a= 0.0788376 b= 0.650824 CC= 0.8907 RMSE=0.145862 MeanX= 0.420741 MeanY= 0.352666 • week=26 Period_16days= 10 Y= a +b * X : a= 0.0793715 b= 0.671477 CC= 0.8983 RMSE=0.137569 MeanX= 0.420729 MeanY= 0.361881 • week=27 Period_16days= 11 Y= a +b * X : a= 0.0759154 b= 0.682492 CC= 0.9174 RMSE=0.129965 MeanX= 0.420359 MeanY= 0.362808 • week=28 Period_16days= 11 Y= a +b * X : a= 0.0877819 b= 0.648993 CC= 0.8937 RMSE=0.141764 MeanX= 0.420328 MeanY= 0.360572 • week=29 Period_16days= 12 Y= a +b * X : a= 0.0791659 b= 0.661783 CC= 0.9006 RMSE=0.139612 MeanX= 0.421423 MeanY= 0.358057 • week=30 Period_16days= 12 Y= a +b * X : a= 0.0855309 b= 0.647220 CC= 0.8751 RMSE=0.148476 MeanX= 0.421539 MeanY= 0.358360 • week=31 Period_16days= 13 Y= a +b * X : a= 0.0722391 b= 0.652663 CC= 0.8938 RMSE=0.146902 MeanX= 0.418717 MeanY= 0.345520 • week=32 Period_16days= 13 Y= a +b * X : a= 0.0813122 b= 0.670972 CC= 0.9055 RMSE=0.133916 MeanX= 0.418622 MeanY= 0.362196
Regression between MODIS-NDVI and AVHRR (N19)-SMNfor 2012 • week=1 Period_16days= 1 Y= a +b * X : a= 0.0379680 b= 0.461226 CC= 0.8924 RMSE=0.232560 MeanX= 0.399710 MeanY= 0.222324 • week=2 Period_16days= 1 Y= a +b * X : a= 0.0359047 b= 0.464314 CC= 0.8956 RMSE=0.232572 MeanX= 0.399739 MeanY= 0.221509 • week=3 Period_16days= 1 Y= a +b * X : a= 0.0348044 b= 0.465574 CC= 0.8949 RMSE=0.232945 MeanX= 0.399752 MeanY= 0.220919 • week=4 Period_16days= 1 Y= a +b * X : a= 0.0345995 b= 0.466675 CC= 0.8923 RMSE=0.232877 MeanX= 0.399808 MeanY= 0.221180 • week=5 Period_16days= 1 Y= a +b * X : a= 0.0350827 b= 0.467049 CC= 0.8877 RMSE=0.232749 MeanX= 0.399833 MeanY= 0.221824 • week=6 Period_16days= 2 Y= a +b * X : a= 0.0336846 b= 0.468126 CC= 0.8848 RMSE=0.235294 MeanX= 0.403705 MeanY= 0.222669 • week=7 Period_16days= 2 Y= a +b * X : a= 0.0336296 b= 0.471104 CC= 0.8835 RMSE=0.234178 MeanX= 0.403698 MeanY= 0.223813 • week=8 Period_16days= 3 Y= a +b * X : a= 0.0330163 b= 0.482067 CC= 0.8938 RMSE=0.226096 MeanX= 0.398149 MeanY= 0.224951 • week=9 Period_16days= 3 Y= a +b * X : a= 0.0337925 b= 0.482749 CC= 0.8929 RMSE=0.225250 MeanX= 0.398032 MeanY= 0.225942 • week=10 Period_16days= 3 Y= a +b * X : a= 0.0353770 b= 0.483305 CC= 0.8914 RMSE=0.223931 MeanX= 0.397961 MeanY= 0.227713 • week=11 Period_16days= 4 Y= a +b * X : a= 0.0342351 b= 0.487553 CC= 0.9083 RMSE=0.223066 MeanX= 0.398965 MeanY= 0.228752 • week=12 Period_16days= 4 Y= a +b * X : a= 0.0362325 b= 0.487505 CC= 0.9042 RMSE=0.221984 MeanX= 0.399038 MeanY= 0.230766 • week=13 Period_16days= 5 Y= a +b * X : a= 0.0300682 b= 0.492048 CC= 0.9131 RMSE=0.228371 MeanX= 0.409512 MeanY= 0.231568 • week=14 Period_16days= 5 Y= a +b * X : a= 0.0307438 b= 0.494694 CC= 0.9128 RMSE=0.226755 MeanX= 0.409612 MeanY= 0.233376 • week=15 Period_16days= 6 Y= a +b * X : a= 0.0268019 b= 0.500518 CC= 0.9196 RMSE=0.229413 MeanX= 0.415259 MeanY= 0.234647 • week=16 Period_16days= 6 Y= a +b * X : a= 0.0274342 b= 0.503569 CC= 0.9174 RMSE=0.227785 MeanX= 0.415356 MeanY= 0.236594 • week=17 Period_16days= 6 Y= a +b * X : a= 0.0291079 b= 0.502243 CC= 0.9119 RMSE=0.227639 MeanX= 0.415458 MeanY= 0.237769 • week=18 Period_16days= 7 Y= a +b * X : a= 0.0272752 b= 0.493663 CC= 0.9165 RMSE=0.239463 MeanX= 0.427977 MeanY= 0.238552 • week=19 Period_16days= 7 Y= a +b * X : a= 0.0279889 b= 0.492443 CC= 0.9108 RMSE=0.240059 MeanX= 0.428185 MeanY= 0.238846 • week=20 Period_16days= 8 Y= a +b * X : a= 0.0261831 b= 0.490353 CC= 0.9117 RMSE=0.244821 MeanX= 0.432756 MeanY= 0.238386 • week=21 Period_16days= 8 Y= a +b * X : a= 0.0266567 b= 0.484921 CC= 0.9039 RMSE=0.247774 MeanX= 0.433046 MeanY= 0.236650 • week=22 Period_16days= 9 Y= a +b * X : a= 0.0257929 b= 0.479946 CC= 0.9017 RMSE=0.251883 MeanX= 0.433781 MeanY= 0.233984 • week=23 Period_16days= 9 Y= a +b * X : a= 0.0249337 b= 0.478289 CC= 0.8948 RMSE=0.254123 MeanX= 0.434317 MeanY= 0.232662 • week=24 Period_16days= 10 Y= a +b * X : a= 0.0221552 b= 0.490351 CC= 0.9024 RMSE=0.246066 MeanX= 0.427327 MeanY= 0.231696 • week=25 Period_16days= 10 Y= a +b * X : a= 0.0213688 b= 0.489628 CC= 0.8987 RMSE=0.247635 MeanX= 0.428183 MeanY= 0.231019 • week=26 Period_16days= 10 Y= a +b * X : a= 0.0216330 b= 0.487642 CC= 0.8921 RMSE=0.249231 MeanX= 0.429072 MeanY= 0.230867 • week=27 Period_16days= 11 Y= a +b * X : a= 0.0204905 b= 0.489571 CC= 0.8946 RMSE=0.249442 MeanX= 0.429560 MeanY= 0.230790 • week=28 Period_16days= 11 Y= a +b * X : a= 0.0224049 b= 0.485330 CC= 0.8900 RMSE=0.250510 MeanX= 0.430315 MeanY= 0.231250 • week=29 Period_16days= 12 Y= a +b * X : a= 0.0214712 b= 0.486611 CC= 0.8877 RMSE=0.251281 MeanX= 0.432491 MeanY= 0.231926 • week=30 Period_16days= 12 Y= a +b * X : a= 0.0230242 b= 0.483433 CC= 0.8827 RMSE=0.252152 MeanX= 0.433123 MeanY= 0.232410 • week=31 Period_16days= 13 Y= a +b * X : a= 0.0216330 b= 0.490129 CC= 0.8948 RMSE=0.247820 MeanX= 0.430457 MeanY= 0.232612 • week=32 Period_16days= 13 Y= a +b * X : a= 0.0227793 b= 0.487456 CC= 0.8923 RMSE=0.248366 MeanX= 0.430495 MeanY= 0.232626 • week=33 Period_16days= 13 Y= a +b * X : a= 0.0249812 b= 0.481747 CC= 0.8854 RMSE=0.249810 MeanX= 0.430435 MeanY= 0.232342 • week=34 Period_16days= 14 Y= a +b * X : a= 0.0232702 b= 0.481362 CC= 0.8803 RMSE=0.253131 MeanX= 0.434275 MeanY= 0.232314
MODIS Climatology (11 year) vs. AVHRR climatology (30 years) BT_MEAN MODIS LST_MEAN AVHRR BT_MEAN
MODIS Climatology (11 year) vs. AVHRR climatology (30 years) BT_MAX MODIS LST_MAX AVHRR BT_MAX Week 29
MODIS Climatology (11 year) vs. AVHRR climatology (30 years) BT_MIN MODIS LST_MAX AVHRR BT_MIN Week 29
MODIS LST (period 12) vs. VIIRS BT (week 29) MODIS LST VIIRS BT dT=12K Week 29
VIIRS: BT vs. SMT (2012,week 29) VIIRS BT VIIRS SMT dT=2K Week 29
MODIS LST (period 12) vs. AVHRR LST (week 29) MODIS LST AVHRR BT4 dT=9K Week 29
MODIS LST (period 12) vs. AVHRR LST (week 29) MODIS LST AVHRR SMT dT=7K Week 29
MODIS LST (period 12) vs. VIIRS SMT (week 29) MODIS LST VIIRS SMT dT=8K Week 29
MODIS-LST vs. AVHRR SMT 2003 week=01 Period_16days= 01 Y= a +b * X : a= 16.0586 b= 0.928394 CC= 0.9029 RMSE=8.34266 MeanX= 301.989 MeanY= 296.423 2003 week=05 Period_16days= 01 Y= a +b * X : a= 27.9125 b= 0.890390 CC= 0.8552 RMSE=9.23643 MeanX= 301.989 MeanY= 296.801 2003 week=09 Period_16days= 03 Y= a +b * X : a= 50.8832 b= 0.817699 CC= 0.7688 RMSE=10.4418 MeanX= 302.354 MeanY= 298.118 2003 week=13 Period_16days= 05 Y= a +b * X : a= 95.9223 b= 0.673652 CC= 0.6729 RMSE=11.2452 MeanX= 303.115 MeanY= 300.116 2003 week=17 Period_16days= 06 Y= a +b * X : a= 158.758 b= 0.470588 CC= 0.4896 RMSE=13.1465 MeanX= 303.222 MeanY= 301.451 2003 week=21 Period_16days= 08 Y= a +b * X : a= 203.847 b= 0.321019 CC= 0.3176 RMSE=14.2902 MeanX= 304.032 MeanY= 301.447 2003 week=25 Period_16days= 10 Y= a +b * X : a= 215.631 b= 0.278575 CC= 0.2489 RMSE=15.2133 MeanX= 305.464 MeanY= 300.726 2003 week=29 Period_16days= 12 Y= a +b * X : a= 204.825 b= 0.311229 CC= 0.2770 RMSE=15.6675 MeanX= 306.850 MeanY= 300.325 2003 week=33 Period_16days= 13 Y= a +b * X : a= 169.741 b= 0.426328 CC= 0.3680 RMSE=14.1605 MeanX= 306.890 MeanY= 300.577 2003 week=37 Period_16days= 15 Y= a +b * X : a= 120.597 b= 0.587626 CC= 0.5329 RMSE=12.0489 MeanX= 307.268 MeanY= 301.156 2003 week=41 Period_16days= 17 Y= a +b * X : a= 118.370 b= 0.595001 CC= 0.6237 RMSE=11.2120 MeanX= 307.379 MeanY= 301.261 2003 week=45 Period_16days= 19 Y= a +b * X : a= 158.630 b= 0.457377 CC= 0.4198 RMSE=13.8909 MeanX= 306.513 MeanY= 298.822 2003 week=49 Period_16days= 20 Y= a +b * X : a= 235.872 b= 0.195791 CC= 0.1595 RMSE=18.8197 MeanX= 306.337 MeanY= 295.850 2005 week=01 Period_16days= 01 Y= a +b * X : a= 12.6633 b= 0.937296 CC= 0.8800 RMSE=9.45830 MeanX= 300.918 MeanY= 294.713 2005 week=05 Period_16days= 01 Y= a +b * X : a= 7.07745 b= 0.957888 CC= 0.8521 RMSE=9.97286 MeanX= 300.918 MeanY= 295.323 2005 week=09 Period_16days= 03 Y= a +b * X : a= 48.4859 b= 0.826774 CC= 0.7946 RMSE=9.87543 MeanX= 301.136 MeanY= 297.458 2005 week=13 Period_16days= 05 Y= a +b * X : a= 114.208 b= 0.613961 CC= 0.6626 RMSE=11.2689 MeanX= 302.596 MeanY= 299.990 2005 week=17 Period_16days= 06 Y= a +b * X : a= 189.394 b= 0.368372 CC= 0.4316 RMSE=13.8605 MeanX= 303.371 MeanY= 301.147 2005 week=21 Period_16days= 08 Y= a +b * X : a= 205.202 b= 0.313600 CC= 0.3301 RMSE=15.0293 MeanX= 304.761 MeanY= 300.775 2005 week=25 Period_16days= 10 Y= a +b * X : a= 224.631 b= 0.249444 CC= 0.2255 RMSE=15.0045 MeanX= 305.591 MeanY= 300.859 2005 week=29 Period_16days= 12 Y= a +b * X : a= 192.289 b= 0.354425 CC= 0.3236 RMSE=14.8529 MeanX= 307.132 MeanY= 301.144 2005 week=33 Period_16days= 13 Y= a +b * X : a= 180.383 b= 0.395835 CC= 0.3606 RMSE=13.5448 MeanX= 306.921 MeanY= 301.873 2005 week=37 Period_16days= 15 Y= a +b * X : a= 122.281 b= 0.586691 CC= 0.5729 RMSE=10.7802 MeanX= 307.126 MeanY= 302.469 2005 week=41 Period_16days= 17 Y= a +b * X : a= 108.866 b= 0.628816 CC= 0.6518 RMSE=9.95080 MeanX= 307.035 MeanY= 301.934 2005 week=45 Period_16days= 19 Y= a +b * X : a= 152.044 b= 0.481738 CC= 0.4699 RMSE=13.1069 MeanX= 306.721 MeanY= 299.803 2005 week=49 Period_16days= 20 Y= a +b * X : a= 201.911 b= 0.310947 CC= 0.2681 RMSE=17.0419 MeanX= 307.013 MeanY= 297.375 2006 week=01 Period_16days= 01 Y= a +b * X : a= 41.7322 b= 0.845054 CC= 0.8944 RMSE=7.97717 MeanX= 301.400 MeanY= 296.431 2006 week=05 Period_16days= 01 Y= a +b * X : a= 52.9004 b= 0.809464 CC= 0.8418 RMSE=8.90107 MeanX= 301.400 MeanY= 296.873 2006 week=09 Period_16days= 03 Y= a +b * X : a= 94.9458 b= 0.677996 CC= 0.7483 RMSE=9.54824 MeanX= 301.293 MeanY= 299.221 2006 week=13 Period_16days= 05 Y= a +b * X : a= 112.388 b= 0.621843 CC= 0.6468 RMSE=10.4826 MeanX= 303.016 MeanY= 300.816 2006 week=17 Period_16days= 06 Y= a +b * X : a= 178.793 b= 0.405112 CC= 0.4409 RMSE=12.7687 MeanX= 303.442 MeanY= 301.721 2006 week=21 Period_16days= 08 Y= a +b * X : a= 172.585 b= 0.424742 CC= 0.4323 RMSE=12.5410 MeanX= 305.189 MeanY= 302.212 2006 week=25 Period_16days= 10 Y= a +b * X : a= 199.796 b= 0.334894 CC= 0.3143 RMSE=13.5362 MeanX= 305.021 MeanY= 301.946 2006 week=29 Period_16days= 12 Y= a +b * X : a= 182.821 b= 0.387381 CC= 0.3406 RMSE=13.6521 MeanX= 306.240 MeanY= 301.453 2006 week=33 Period_16days= 13 Y= a +b * X : a= 184.519 b= 0.382740 CC= 0.3521 RMSE=13.0794 MeanX= 306.477 MeanY= 301.820 2006 week=37 Period_16days= 15 Y= a +b * X : a= 148.582 b= 0.501559 CC= 0.5195 RMSE=10.8482 MeanX= 306.780 MeanY= 302.450 2006 week=41 Period_16days= 17 Y= a +b * X : a= 131.648 b= 0.554774 CC= 0.6056 RMSE=10.3999 MeanX= 306.768 MeanY= 301.834 2006 week=45 Period_16days= 19 Y= a +b * X : a= 203.371 b= 0.313006 CC= 0.3142 RMSE=14.6455 MeanX= 306.843 MeanY= 299.415 2006 week=49 Period_16days= 20 Y= a +b * X : a= 265.981 b= 0.101392 CC= 0.0911 RMSE=18.2900 MeanX= 306.485 MeanY= 297.056 2007 week=01 Period_16days= 01 Y= a +b * X : a= 42.5351 b= 0.847209 CC= 0.9039 RMSE=6.65659 MeanX= 299.797 MeanY= 296.526 2007 week=05 Period_16days= 01 Y= a +b * X : a= 52.2545 b= 0.819522 CC= 0.8611 RMSE=7.22430 MeanX= 299.797 MeanY= 297.945 2007 week=09 Period_16days= 03 Y= a +b * X : a= 80.8728 b= 0.727035 CC= 0.7812 RMSE=8.67279 MeanX= 300.871 MeanY= 299.616 2007 week=13 Period_16days= 05 Y= a +b * X : a= 125.311 b= 0.579622 CC= 0.6825 RMSE=10.2322 MeanX= 303.336 MeanY= 301.132 2007 week=17 Period_16days= 06 Y= a +b * X : a= 192.878 b= 0.360073 CC= 0.4532 RMSE=12.7801 MeanX= 303.716 MeanY= 302.238 2007 week=21 Period_16days= 08 Y= a +b * X : a= 216.725 b= 0.280634 CC= 0.3013 RMSE=13.7128 MeanX= 304.673 MeanY= 302.226 2007 week=25 Period_16days= 10 Y= a +b * X : a= 228.548 b= 0.239472 CC= 0.2181 RMSE=14.5028 MeanX= 304.931 MeanY= 301.570 2007 week=29 Period_16days= 12 Y= a +b * X : a= 209.272 b= 0.300096 CC= 0.2451 RMSE=14.4295 MeanX= 306.248 MeanY= 301.176 2007 week=33 Period_16days= 13 Y= a +b * X : a= 178.282 b= 0.403414 CC= 0.3542 RMSE=13.1113 MeanX= 306.083 MeanY= 301.760 2007 week=37 Period_16days= 15 Y= a +b * X : a= 127.323 b= 0.571546 CC= 0.5454 RMSE=10.8297 MeanX= 306.695 MeanY= 302.613 2007 week=41 Period_16days= 17 Y= a +b * X : a= 101.459 b= 0.654575 CC= 0.6293 RMSE=9.92264 MeanX= 307.011 MeanY= 302.421 2007 week=45 Period_16days= 19 Y= a +b * X : a= 165.323 b= 0.440582 CC= 0.4602 RMSE=12.9090 MeanX= 306.609 MeanY= 300.409 2007 week=49 Period_16days= 20 Y= a +b * X : a= 239.589 b= 0.188876 CC= 0.1702 RMSE=17.1662 MeanX= 306.297 MeanY= 297.441 2008 week=01 Period_16days= 01 Y= a +b * X : a= 43.0053 b= 0.841169 CC= 0.9120 RMSE=7.60723 MeanX= 300.885 MeanY= 296.100 2008 week=05 Period_16days= 01 Y= a +b * X : a= 49.8268 b= 0.818840 CC= 0.8626 RMSE=8.75069 MeanX= 300.885 MeanY= 296.203 2008 week=09 Period_16days= 03 Y= a +b * X : a= 117.217 b= 0.608614 CC= 0.7419 RMSE=10.1017 MeanX= 300.059 MeanY= 299.837 2008 week=13 Period_16days= 05 Y= a +b * X : a= 150.378 b= 0.501853 CC= 0.5972 RMSE=11.6221 MeanX= 301.260 MeanY= 301.566 2008 week=17 Period_16days= 06 Y= a +b * X : a= 184.149 b= 0.392037 CC= 0.4534 RMSE=12.9258 MeanX= 302.058 MeanY= 302.567 2008 week=21 Period_16days= 08 Y= a +b * X : a= 182.810 b= 0.392242 CC= 0.4010 RMSE=12.8668 MeanX= 304.561 MeanY= 302.272 2008 week=25 Period_16days= 10 Y= a +b * X : a= 181.762 b= 0.391248 CC= 0.3618 RMSE=13.8061 MeanX= 306.312 MeanY= 301.605 2008 week=29 Period_16days= 12 Y= a +b * X : a= 171.358 b= 0.425807 CC= 0.3587 RMSE=13.5351 MeanX= 305.921 MeanY= 301.621 2008 week=33 Period_16days= 13 Y= a +b * X : a= 167.552 b= 0.438211 CC= 0.3681 RMSE=12.8075 MeanX= 306.312 MeanY= 301.781 2008 week=37 Period_16days= 15 Y= a +b * X : a= 112.510 b= 0.618292 CC= 0.6035 RMSE=10.3114 MeanX= 307.446 MeanY= 302.601 2008 week=41 Period_16days= 17 Y= a +b * X : a= 112.144 b= 0.618250 CC= 0.6354 RMSE=10.0462 MeanX= 307.093 MeanY= 302.004 2008 week=45 Period_16days= 19 Y= a +b * X : a= 176.144 b= 0.403417 CC= 0.4172 RMSE=13.5759 MeanX= 306.522 MeanY= 299.800 2008 week=49 Period_16days= 20 Y= a +b * X : a= 222.835 b= 0.242706 CC= 0.2266 RMSE=17.3211 MeanX= 306.801 MeanY= 297.297 2009 week=01 Period_16days= 01 Y= a +b * X : a= 51.3125 b= 0.815006 CC= 0.9001 RMSE=7.60747 MeanX= 301.080 MeanY= 296.695 2009 week=05 Period_16days= 01 Y= a +b * X : a= 63.4221 b= 0.777659 CC= 0.8440 RMSE=8.49703 MeanX= 301.080 MeanY= 297.560 2009 week=09 Period_16days= 03 Y= a +b * X : a= 82.2477 b= 0.720927 CC= 0.7551 RMSE=9.38024 MeanX= 301.035 MeanY= 299.272 2009 week=13 Period_16days= 05 Y= a +b * X : a= 99.5626 b= 0.664658 CC= 0.7213 RMSE=9.39408 MeanX= 303.621 MeanY= 301.367 2009 week=17 Period_16days= 06 Y= a +b * X : a= 156.463 b= 0.481107 CC= 0.5080 RMSE=11.3931 MeanX= 303.260 MeanY= 302.363 2009 week=21 Period_16days= 08 Y= a +b * X : a= 195.784 b= 0.351488 CC= 0.3759 RMSE=13.1743 MeanX= 304.278 MeanY= 302.734 2009 week=25 Period_16days= 10 Y= a +b * X : a= 173.789 b= 0.418891 CC= 0.3824 RMSE=13.0229 MeanX= 306.175 MeanY= 302.043 2009 week=29 Period_16days= 12 Y= a +b * X : a= 194.082 b= 0.351682 CC= 0.3129 RMSE=13.8553 MeanX= 306.055 MeanY= 301.716 2009 week=33 Period_16days= 13 Y= a +b * X : a= 179.017 b= 0.402614 CC= 0.3663 RMSE=12.5851 MeanX= 306.574 MeanY= 302.448 2009 week=37 Period_16days= 15 Y= a +b * X : a= 121.277 b= 0.592219 CC= 0.5923 RMSE=9.70392 MeanX= 306.438 MeanY= 302.756 2009 week=41 Period_16days= 17 Y= a +b * X : a= 123.320 b= 0.583304 CC= 0.6292 RMSE=9.72819 MeanX= 306.258 MeanY= 301.961 2009 week=45 Period_16days= 19 Y= a +b * X : a= 181.285 b= 0.386711 CC= 0.4183 RMSE=13.7124 MeanX= 306.873 MeanY= 299.956 2009 week=49 Period_16days= 20 Y= a +b * X : a= 225.782 b= 0.233325 CC= 0.2106 RMSE=17.5751 MeanX= 306.762 MeanY= 297.357 2010 week=01 Period_16days= 01 Y= a +b * X : a= 26.7094 b= 0.897003 CC= 0.9134 RMSE=7.06788 MeanX= 301.439 MeanY= 297.101 2010 week=05 Period_16days= 01 Y= a +b * X : a= 28.7817 b= 0.892429 CC= 0.8878 RMSE=7.38255 MeanX= 301.439 MeanY= 297.794 2010 week=09 Period_16days= 03 Y= a +b * X : a= 69.2281 b= 0.760976 CC= 0.7845 RMSE=9.03015 MeanX= 302.784 MeanY= 299.639 2010 week=13 Period_16days= 05 Y= a +b * X : a= 136.046 b= 0.546376 CC= 0.6355 RMSE=10.7688 MeanX= 302.859 MeanY= 301.520 2010 week=17 Period_16days= 06 Y= a +b * X : a= 180.153 b= 0.400639 CC= 0.4872 RMSE=13.0031 MeanX= 303.918 MeanY= 301.915 2010 week=21 Period_16days= 08 Y= a +b * X : a= 180.852 b= 0.396417 CC= 0.4045 RMSE=13.0654 MeanX= 304.525 MeanY= 301.571 2010 week=25 Period_16days= 10 Y= a +b * X : a= 189.125 b= 0.365208 CC= 0.3190 RMSE=13.9461 MeanX= 305.967 MeanY= 300.866 2010 week=29 Period_16days= 12 Y= a +b * X : a= 191.298 b= 0.356722 CC= 0.3075 RMSE=14.2628 MeanX= 306.152 MeanY= 300.510 2010 week=33 Period_16days= 13 Y= a +b * X : a= 192.423 b= 0.354784 CC= 0.3100 RMSE=13.7773 MeanX= 306.292 MeanY= 301.091 2010 week=37 Period_16days= 15 Y= a +b * X : a= 140.057 b= 0.528802 CC= 0.5215 RMSE=10.8803 MeanX= 306.306 MeanY= 302.032 2010 week=41 Period_16days= 17 Y= a +b * X : a= 126.710 b= 0.570143 CC= 0.6342 RMSE=10.1163 MeanX= 306.947 MeanY= 301.714 2010 week=45 Period_16days= 19 Y= a +b * X : a= 178.043 b= 0.397814 CC= 0.4224 RMSE=12.8457 MeanX= 305.982 MeanY= 299.767 2010 week=49 Period_16days= 20 Y= a +b * X : a= 217.853 b= 0.259901 CC= 0.2585 RMSE=16.1870 MeanX= 306.262 MeanY= 297.451 2011 week=01 Period_16days= 01 Y= a +b * X : a= 48.1796 b= 0.825672 CC= 0.8903 RMSE=7.28257 MeanX= 300.319 MeanY= 296.145 2011 week=05 Period_16days= 01 Y= a +b * X : a= 55.1744 b= 0.802811 CC= 0.8277 RMSE=8.57687 MeanX= 300.319 MeanY= 296.274 2011 week=09 Period_16days= 03 Y= a +b * X : a= 97.9986 b= 0.665464 CC= 0.7392 RMSE=9.84362 MeanX= 300.812 MeanY= 298.178 2011 week=13 Period_16days= 05 Y= a +b * X : a= 126.789 b= 0.575294 CC= 0.6205 RMSE=10.5136 MeanX= 301.411 MeanY= 300.190 2011 week=17 Period_16days= 06 Y= a +b * X : a= 166.066 b= 0.447754 CC= 0.4765 RMSE=11.7373 MeanX= 302.078 MeanY= 301.322 2011 week=21 Period_16days= 08 Y= a +b * X : a= 208.593 b= 0.306560 CC= 0.3130 RMSE=13.5527 MeanX= 303.333 MeanY= 301.583 2011 week=25 Period_16days= 10 Y= a +b * X : a= 175.997 b= 0.411224 CC= 0.3608 RMSE=13.2165 MeanX= 304.681 MeanY= 301.289 2011 week=29 Period_16days= 12 Y= a +b * X : a= 178.680 b= 0.400292 CC= 0.3202 RMSE=13.7935 MeanX= 305.768 MeanY= 301.077 2011 week=33 Period_16days= 13 Y= a +b * X : a= 176.402 b= 0.408189 CC= 0.3494 RMSE=13.2080 MeanX= 306.241 MeanY= 301.406 2011 week=37 Period_16days= 15 Y= a +b * X : a= 140.072 b= 0.527911 CC= 0.5301 RMSE=11.0520 MeanX= 306.566 MeanY= 301.912 2011 week=41 Period_16days= 17 Y= a +b * X : a= 132.573 b= 0.549299 CC= 0.5770 RMSE=10.5066 MeanX= 306.074 MeanY= 300.699 2011 week=45 Period_16days= 19 Y= a +b * X : a= 192.077 b= 0.346182 CC= 0.3598 RMSE=14.7809 MeanX= 306.566 MeanY= 298.205 2011 week=49 Period_16days= 20 Y= a +b * X : a= 242.750 b= 0.172835 CC= 0.1663 RMSE=18.6101 MeanX= 306.932 MeanY= 295.799 2012 week=01 Period_16days= 01 Y= a +b * X : a= 43.2208 b= 0.837525 CC= 0.8995 RMSE=8.28485 MeanX= 301.331 MeanY= 295.593 2012 week=05 Period_16days= 01 Y= a +b * X : a= 42.7038 b= 0.840685 CC= 0.8567 RMSE=8.97122 MeanX= 301.331 MeanY= 296.028 2012 week=09 Period_16days= 03 Y= a +b * X : a= 76.0955 b= 0.736417 CC= 0.7997 RMSE=9.09815 MeanX= 300.784 MeanY= 297.598 2012 week=13 Period_16days= 05 Y= a +b * X : a= 130.914 b= 0.558305 CC= 0.6491 RMSE=10.7363 MeanX= 301.852 MeanY= 299.439 2012 week=17 Period_16days= 06 Y= a +b * X : a= 201.654 b= 0.328107 CC= 0.4144 RMSE=13.6844 MeanX= 302.614 MeanY= 300.943 2012 week=21 Period_16days= 08 Y= a +b * X : a= 193.485 b= 0.355109 CC= 0.3513 RMSE=13.0882 MeanX= 303.277 MeanY= 301.181 2012 week=25 Period_16days= 10 Y= a +b * X : a= 216.985 b= 0.273958 CC= 0.2377 RMSE=14.5292 MeanX= 304.873 MeanY= 300.508 2012 week=29 Period_16days= 12 Y= a +b * X : a= 190.177 b= 0.357257 CC= 0.2926 RMSE=14.8649 MeanX= 306.687 MeanY= 299.743 2012 week=33 Period_16days= 13 Y= a +b * X : a= 178.425 b= 0.395829 CC= 0.3233 RMSE=14.9146 MeanX= 306.587 MeanY= 299.781