1 / 29

Compare NDVI and BT from MODIS, AVHRR and VIIRS on 4km Grid

Compare NDVI and BT from MODIS, AVHRR and VIIRS on 4km Grid. 11/7/2012. GVI Sub-regions for VIIRS 500m VH product. The GVI regions covers latitude zone from 55.152S to 75.024N It was divided into 8 x8 sub-regions with the same size Each region covers 45° x 16.27 ° degree,

emmly
Download Presentation

Compare NDVI and BT from MODIS, AVHRR and VIIRS on 4km Grid

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Compare NDVI and BT from MODIS, AVHRR and VIIRSon 4km Grid 11/7/2012

  2. GVI Sub-regions for VIIRS 500m VH product The GVI regions covers latitude zone from 55.152S to 75.024N It was divided into 8 x8 sub-regions with the same size Each region covers 45° x 16.27 ° degree, For VIIRS 500m VH product, each region has 1000x3616 grid cells VGVI.G500m.C01.npp.P2012312_r01c01.nc VGVI.G500m.C07.npp.P2012312_r08c08.nc VGVI.G500m.C07.npp.P2012312.ND_r08c08.nc VGVI.G500m.C07.npp.P2012312.SM_r08c08.nc

  3. VIIRS NDVI vs. SMN (2012,week 27) VIIRS NDVI VIIRS SMN

  4. Aggregated 4km maps • Take mean of valid values within a 4km grid cell. • Compare between below variables: • AVHRR NDVI / SMN • VIIRS NDVI / SMN • MODIS NDVI • Climatology of MODIS • Climatology of AVHRR

  5. MODIS NDVI vs. EVI (2012, period 12) MODIS NDVI MODIS EVI

  6. MODIS Climatology (11 year) vs. AVHRR climatology (30 years) NDVI_MEAN MODIS AVHRR

  7. MODIS Climatology (11 year) vs. AVHRR climatology (30 years) NDVI_MAX MODIS AVHRR Week 29

  8. MODIS Climatology (11 year) vs. AVHRR climatology (30 years) NDVI_MIN MODIS AVHRR Week 29

  9. MODIS NDVI (2012,p=12)vs. VIIRS NDVI (2012,week 29) MODIS NDVI VIIRS NDVI Week 29

  10. MODIS NDVI vs. VIIRS NDVI (2012,week 29) MODIS NDVI VIIRS SMN Week 29

  11. MODIS NDVI (2012,p=12)vs. N19 NDVI (2012,week 29) MODIS NDVI N19 -NDVI Week 29

  12. MODIS NDVI vs. N19 SMN (2012,week 29) MODIS NDVI N19 SMN

  13. AVHRR(N19) MODIS VIIRS

  14. Regression between MODIS-NDVI and VIIRS-NDVI for 2012 • week=20 Period_16days= 8 Y= a +b * X : a= 0.0835132 b= 0.676161 CC= 0.9290 RMSE=0.126013 MeanX= 0.428155 MeanY= 0.373015 • week=21 Period_16days= 8 Y= a +b * X : a= 0.0854498 b= 0.654033 CC= 0.8995 RMSE=0.141027 MeanX= 0.428172 MeanY= 0.365488 • week=22 Period_16days= 9 Y= a +b * X : a= 0.0761164 b= 0.664260 CC= 0.9106 RMSE=0.139756 MeanX= 0.428441 MeanY= 0.360712 • week=23 Period_16days= 9 Y= a +b * X : a= 0.0837967 b= 0.651849 CC= 0.9020 RMSE=0.142544 MeanX= 0.428462 MeanY= 0.363089 • week=24 Period_16days= 10 Y= a +b * X : a= 0.0732078 b= 0.692766 CC= 0.9370 RMSE=0.121182 MeanX= 0.420823 MeanY= 0.364740 • week=25 Period_16days= 10 Y= a +b * X : a= 0.0788376 b= 0.650824 CC= 0.8907 RMSE=0.145862 MeanX= 0.420741 MeanY= 0.352666 • week=26 Period_16days= 10 Y= a +b * X : a= 0.0793715 b= 0.671477 CC= 0.8983 RMSE=0.137569 MeanX= 0.420729 MeanY= 0.361881 • week=27 Period_16days= 11 Y= a +b * X : a= 0.0759154 b= 0.682492 CC= 0.9174 RMSE=0.129965 MeanX= 0.420359 MeanY= 0.362808 • week=28 Period_16days= 11 Y= a +b * X : a= 0.0877819 b= 0.648993 CC= 0.8937 RMSE=0.141764 MeanX= 0.420328 MeanY= 0.360572 • week=29 Period_16days= 12 Y= a +b * X : a= 0.0791659 b= 0.661783 CC= 0.9006 RMSE=0.139612 MeanX= 0.421423 MeanY= 0.358057 • week=30 Period_16days= 12 Y= a +b * X : a= 0.0855309 b= 0.647220 CC= 0.8751 RMSE=0.148476 MeanX= 0.421539 MeanY= 0.358360 • week=31 Period_16days= 13 Y= a +b * X : a= 0.0722391 b= 0.652663 CC= 0.8938 RMSE=0.146902 MeanX= 0.418717 MeanY= 0.345520 • week=32 Period_16days= 13 Y= a +b * X : a= 0.0813122 b= 0.670972 CC= 0.9055 RMSE=0.133916 MeanX= 0.418622 MeanY= 0.362196

  15. Regression between MODIS-NDVI and AVHRR (N19)-SMNfor 2012 • week=1 Period_16days= 1 Y= a +b * X : a= 0.0379680 b= 0.461226 CC= 0.8924 RMSE=0.232560 MeanX= 0.399710 MeanY= 0.222324 • week=2 Period_16days= 1 Y= a +b * X : a= 0.0359047 b= 0.464314 CC= 0.8956 RMSE=0.232572 MeanX= 0.399739 MeanY= 0.221509 • week=3 Period_16days= 1 Y= a +b * X : a= 0.0348044 b= 0.465574 CC= 0.8949 RMSE=0.232945 MeanX= 0.399752 MeanY= 0.220919 • week=4 Period_16days= 1 Y= a +b * X : a= 0.0345995 b= 0.466675 CC= 0.8923 RMSE=0.232877 MeanX= 0.399808 MeanY= 0.221180 • week=5 Period_16days= 1 Y= a +b * X : a= 0.0350827 b= 0.467049 CC= 0.8877 RMSE=0.232749 MeanX= 0.399833 MeanY= 0.221824 • week=6 Period_16days= 2 Y= a +b * X : a= 0.0336846 b= 0.468126 CC= 0.8848 RMSE=0.235294 MeanX= 0.403705 MeanY= 0.222669 • week=7 Period_16days= 2 Y= a +b * X : a= 0.0336296 b= 0.471104 CC= 0.8835 RMSE=0.234178 MeanX= 0.403698 MeanY= 0.223813 • week=8 Period_16days= 3 Y= a +b * X : a= 0.0330163 b= 0.482067 CC= 0.8938 RMSE=0.226096 MeanX= 0.398149 MeanY= 0.224951 • week=9 Period_16days= 3 Y= a +b * X : a= 0.0337925 b= 0.482749 CC= 0.8929 RMSE=0.225250 MeanX= 0.398032 MeanY= 0.225942 • week=10 Period_16days= 3 Y= a +b * X : a= 0.0353770 b= 0.483305 CC= 0.8914 RMSE=0.223931 MeanX= 0.397961 MeanY= 0.227713 • week=11 Period_16days= 4 Y= a +b * X : a= 0.0342351 b= 0.487553 CC= 0.9083 RMSE=0.223066 MeanX= 0.398965 MeanY= 0.228752 • week=12 Period_16days= 4 Y= a +b * X : a= 0.0362325 b= 0.487505 CC= 0.9042 RMSE=0.221984 MeanX= 0.399038 MeanY= 0.230766 • week=13 Period_16days= 5 Y= a +b * X : a= 0.0300682 b= 0.492048 CC= 0.9131 RMSE=0.228371 MeanX= 0.409512 MeanY= 0.231568 • week=14 Period_16days= 5 Y= a +b * X : a= 0.0307438 b= 0.494694 CC= 0.9128 RMSE=0.226755 MeanX= 0.409612 MeanY= 0.233376 • week=15 Period_16days= 6 Y= a +b * X : a= 0.0268019 b= 0.500518 CC= 0.9196 RMSE=0.229413 MeanX= 0.415259 MeanY= 0.234647 • week=16 Period_16days= 6 Y= a +b * X : a= 0.0274342 b= 0.503569 CC= 0.9174 RMSE=0.227785 MeanX= 0.415356 MeanY= 0.236594 • week=17 Period_16days= 6 Y= a +b * X : a= 0.0291079 b= 0.502243 CC= 0.9119 RMSE=0.227639 MeanX= 0.415458 MeanY= 0.237769 • week=18 Period_16days= 7 Y= a +b * X : a= 0.0272752 b= 0.493663 CC= 0.9165 RMSE=0.239463 MeanX= 0.427977 MeanY= 0.238552 • week=19 Period_16days= 7 Y= a +b * X : a= 0.0279889 b= 0.492443 CC= 0.9108 RMSE=0.240059 MeanX= 0.428185 MeanY= 0.238846 • week=20 Period_16days= 8 Y= a +b * X : a= 0.0261831 b= 0.490353 CC= 0.9117 RMSE=0.244821 MeanX= 0.432756 MeanY= 0.238386 • week=21 Period_16days= 8 Y= a +b * X : a= 0.0266567 b= 0.484921 CC= 0.9039 RMSE=0.247774 MeanX= 0.433046 MeanY= 0.236650 • week=22 Period_16days= 9 Y= a +b * X : a= 0.0257929 b= 0.479946 CC= 0.9017 RMSE=0.251883 MeanX= 0.433781 MeanY= 0.233984 • week=23 Period_16days= 9 Y= a +b * X : a= 0.0249337 b= 0.478289 CC= 0.8948 RMSE=0.254123 MeanX= 0.434317 MeanY= 0.232662 • week=24 Period_16days= 10 Y= a +b * X : a= 0.0221552 b= 0.490351 CC= 0.9024 RMSE=0.246066 MeanX= 0.427327 MeanY= 0.231696 • week=25 Period_16days= 10 Y= a +b * X : a= 0.0213688 b= 0.489628 CC= 0.8987 RMSE=0.247635 MeanX= 0.428183 MeanY= 0.231019 • week=26 Period_16days= 10 Y= a +b * X : a= 0.0216330 b= 0.487642 CC= 0.8921 RMSE=0.249231 MeanX= 0.429072 MeanY= 0.230867 • week=27 Period_16days= 11 Y= a +b * X : a= 0.0204905 b= 0.489571 CC= 0.8946 RMSE=0.249442 MeanX= 0.429560 MeanY= 0.230790 • week=28 Period_16days= 11 Y= a +b * X : a= 0.0224049 b= 0.485330 CC= 0.8900 RMSE=0.250510 MeanX= 0.430315 MeanY= 0.231250 • week=29 Period_16days= 12 Y= a +b * X : a= 0.0214712 b= 0.486611 CC= 0.8877 RMSE=0.251281 MeanX= 0.432491 MeanY= 0.231926 • week=30 Period_16days= 12 Y= a +b * X : a= 0.0230242 b= 0.483433 CC= 0.8827 RMSE=0.252152 MeanX= 0.433123 MeanY= 0.232410 • week=31 Period_16days= 13 Y= a +b * X : a= 0.0216330 b= 0.490129 CC= 0.8948 RMSE=0.247820 MeanX= 0.430457 MeanY= 0.232612 • week=32 Period_16days= 13 Y= a +b * X : a= 0.0227793 b= 0.487456 CC= 0.8923 RMSE=0.248366 MeanX= 0.430495 MeanY= 0.232626 • week=33 Period_16days= 13 Y= a +b * X : a= 0.0249812 b= 0.481747 CC= 0.8854 RMSE=0.249810 MeanX= 0.430435 MeanY= 0.232342 • week=34 Period_16days= 14 Y= a +b * X : a= 0.0232702 b= 0.481362 CC= 0.8803 RMSE=0.253131 MeanX= 0.434275 MeanY= 0.232314

  16. NDVI Regression :MODIS and AVHRR

  17. BT

  18. MODIS Climatology (11 year) vs. AVHRR climatology (30 years) BT_MEAN MODIS LST_MEAN AVHRR BT_MEAN

  19. MODIS Climatology (11 year) vs. AVHRR climatology (30 years) BT_MAX MODIS LST_MAX AVHRR BT_MAX Week 29

  20. MODIS Climatology (11 year) vs. AVHRR climatology (30 years) BT_MIN MODIS LST_MAX AVHRR BT_MIN Week 29

  21. MODIS LST (period 12) vs. VIIRS BT (week 29) MODIS LST VIIRS BT dT=12K Week 29

  22. VIIRS: BT vs. SMT (2012,week 29) VIIRS BT VIIRS SMT dT=2K Week 29

  23. MODIS LST (period 12) vs. AVHRR LST (week 29) MODIS LST AVHRR BT4 dT=9K Week 29

  24. MODIS LST (period 12) vs. AVHRR LST (week 29) MODIS LST AVHRR SMT dT=7K Week 29

  25. MODIS LST (period 12) vs. VIIRS SMT (week 29) MODIS LST VIIRS SMT dT=8K Week 29

  26. MODIS-LST vs. AVHRR SMT

  27. MODIS-LST vs. AVHRR SMT

  28. MODIS-LST vs. AVHRR SMT 2003 week=01 Period_16days= 01 Y= a +b * X : a= 16.0586 b= 0.928394 CC= 0.9029 RMSE=8.34266 MeanX= 301.989 MeanY= 296.423 2003 week=05 Period_16days= 01 Y= a +b * X : a= 27.9125 b= 0.890390 CC= 0.8552 RMSE=9.23643 MeanX= 301.989 MeanY= 296.801 2003 week=09 Period_16days= 03 Y= a +b * X : a= 50.8832 b= 0.817699 CC= 0.7688 RMSE=10.4418 MeanX= 302.354 MeanY= 298.118 2003 week=13 Period_16days= 05 Y= a +b * X : a= 95.9223 b= 0.673652 CC= 0.6729 RMSE=11.2452 MeanX= 303.115 MeanY= 300.116 2003 week=17 Period_16days= 06 Y= a +b * X : a= 158.758 b= 0.470588 CC= 0.4896 RMSE=13.1465 MeanX= 303.222 MeanY= 301.451 2003 week=21 Period_16days= 08 Y= a +b * X : a= 203.847 b= 0.321019 CC= 0.3176 RMSE=14.2902 MeanX= 304.032 MeanY= 301.447 2003 week=25 Period_16days= 10 Y= a +b * X : a= 215.631 b= 0.278575 CC= 0.2489 RMSE=15.2133 MeanX= 305.464 MeanY= 300.726 2003 week=29 Period_16days= 12 Y= a +b * X : a= 204.825 b= 0.311229 CC= 0.2770 RMSE=15.6675 MeanX= 306.850 MeanY= 300.325 2003 week=33 Period_16days= 13 Y= a +b * X : a= 169.741 b= 0.426328 CC= 0.3680 RMSE=14.1605 MeanX= 306.890 MeanY= 300.577 2003 week=37 Period_16days= 15 Y= a +b * X : a= 120.597 b= 0.587626 CC= 0.5329 RMSE=12.0489 MeanX= 307.268 MeanY= 301.156 2003 week=41 Period_16days= 17 Y= a +b * X : a= 118.370 b= 0.595001 CC= 0.6237 RMSE=11.2120 MeanX= 307.379 MeanY= 301.261 2003 week=45 Period_16days= 19 Y= a +b * X : a= 158.630 b= 0.457377 CC= 0.4198 RMSE=13.8909 MeanX= 306.513 MeanY= 298.822 2003 week=49 Period_16days= 20 Y= a +b * X : a= 235.872 b= 0.195791 CC= 0.1595 RMSE=18.8197 MeanX= 306.337 MeanY= 295.850 2005 week=01 Period_16days= 01 Y= a +b * X : a= 12.6633 b= 0.937296 CC= 0.8800 RMSE=9.45830 MeanX= 300.918 MeanY= 294.713 2005 week=05 Period_16days= 01 Y= a +b * X : a= 7.07745 b= 0.957888 CC= 0.8521 RMSE=9.97286 MeanX= 300.918 MeanY= 295.323 2005 week=09 Period_16days= 03 Y= a +b * X : a= 48.4859 b= 0.826774 CC= 0.7946 RMSE=9.87543 MeanX= 301.136 MeanY= 297.458 2005 week=13 Period_16days= 05 Y= a +b * X : a= 114.208 b= 0.613961 CC= 0.6626 RMSE=11.2689 MeanX= 302.596 MeanY= 299.990 2005 week=17 Period_16days= 06 Y= a +b * X : a= 189.394 b= 0.368372 CC= 0.4316 RMSE=13.8605 MeanX= 303.371 MeanY= 301.147 2005 week=21 Period_16days= 08 Y= a +b * X : a= 205.202 b= 0.313600 CC= 0.3301 RMSE=15.0293 MeanX= 304.761 MeanY= 300.775 2005 week=25 Period_16days= 10 Y= a +b * X : a= 224.631 b= 0.249444 CC= 0.2255 RMSE=15.0045 MeanX= 305.591 MeanY= 300.859 2005 week=29 Period_16days= 12 Y= a +b * X : a= 192.289 b= 0.354425 CC= 0.3236 RMSE=14.8529 MeanX= 307.132 MeanY= 301.144 2005 week=33 Period_16days= 13 Y= a +b * X : a= 180.383 b= 0.395835 CC= 0.3606 RMSE=13.5448 MeanX= 306.921 MeanY= 301.873 2005 week=37 Period_16days= 15 Y= a +b * X : a= 122.281 b= 0.586691 CC= 0.5729 RMSE=10.7802 MeanX= 307.126 MeanY= 302.469 2005 week=41 Period_16days= 17 Y= a +b * X : a= 108.866 b= 0.628816 CC= 0.6518 RMSE=9.95080 MeanX= 307.035 MeanY= 301.934 2005 week=45 Period_16days= 19 Y= a +b * X : a= 152.044 b= 0.481738 CC= 0.4699 RMSE=13.1069 MeanX= 306.721 MeanY= 299.803 2005 week=49 Period_16days= 20 Y= a +b * X : a= 201.911 b= 0.310947 CC= 0.2681 RMSE=17.0419 MeanX= 307.013 MeanY= 297.375 2006 week=01 Period_16days= 01 Y= a +b * X : a= 41.7322 b= 0.845054 CC= 0.8944 RMSE=7.97717 MeanX= 301.400 MeanY= 296.431 2006 week=05 Period_16days= 01 Y= a +b * X : a= 52.9004 b= 0.809464 CC= 0.8418 RMSE=8.90107 MeanX= 301.400 MeanY= 296.873 2006 week=09 Period_16days= 03 Y= a +b * X : a= 94.9458 b= 0.677996 CC= 0.7483 RMSE=9.54824 MeanX= 301.293 MeanY= 299.221 2006 week=13 Period_16days= 05 Y= a +b * X : a= 112.388 b= 0.621843 CC= 0.6468 RMSE=10.4826 MeanX= 303.016 MeanY= 300.816 2006 week=17 Period_16days= 06 Y= a +b * X : a= 178.793 b= 0.405112 CC= 0.4409 RMSE=12.7687 MeanX= 303.442 MeanY= 301.721 2006 week=21 Period_16days= 08 Y= a +b * X : a= 172.585 b= 0.424742 CC= 0.4323 RMSE=12.5410 MeanX= 305.189 MeanY= 302.212 2006 week=25 Period_16days= 10 Y= a +b * X : a= 199.796 b= 0.334894 CC= 0.3143 RMSE=13.5362 MeanX= 305.021 MeanY= 301.946 2006 week=29 Period_16days= 12 Y= a +b * X : a= 182.821 b= 0.387381 CC= 0.3406 RMSE=13.6521 MeanX= 306.240 MeanY= 301.453 2006 week=33 Period_16days= 13 Y= a +b * X : a= 184.519 b= 0.382740 CC= 0.3521 RMSE=13.0794 MeanX= 306.477 MeanY= 301.820 2006 week=37 Period_16days= 15 Y= a +b * X : a= 148.582 b= 0.501559 CC= 0.5195 RMSE=10.8482 MeanX= 306.780 MeanY= 302.450 2006 week=41 Period_16days= 17 Y= a +b * X : a= 131.648 b= 0.554774 CC= 0.6056 RMSE=10.3999 MeanX= 306.768 MeanY= 301.834 2006 week=45 Period_16days= 19 Y= a +b * X : a= 203.371 b= 0.313006 CC= 0.3142 RMSE=14.6455 MeanX= 306.843 MeanY= 299.415 2006 week=49 Period_16days= 20 Y= a +b * X : a= 265.981 b= 0.101392 CC= 0.0911 RMSE=18.2900 MeanX= 306.485 MeanY= 297.056 2007 week=01 Period_16days= 01 Y= a +b * X : a= 42.5351 b= 0.847209 CC= 0.9039 RMSE=6.65659 MeanX= 299.797 MeanY= 296.526 2007 week=05 Period_16days= 01 Y= a +b * X : a= 52.2545 b= 0.819522 CC= 0.8611 RMSE=7.22430 MeanX= 299.797 MeanY= 297.945 2007 week=09 Period_16days= 03 Y= a +b * X : a= 80.8728 b= 0.727035 CC= 0.7812 RMSE=8.67279 MeanX= 300.871 MeanY= 299.616 2007 week=13 Period_16days= 05 Y= a +b * X : a= 125.311 b= 0.579622 CC= 0.6825 RMSE=10.2322 MeanX= 303.336 MeanY= 301.132 2007 week=17 Period_16days= 06 Y= a +b * X : a= 192.878 b= 0.360073 CC= 0.4532 RMSE=12.7801 MeanX= 303.716 MeanY= 302.238 2007 week=21 Period_16days= 08 Y= a +b * X : a= 216.725 b= 0.280634 CC= 0.3013 RMSE=13.7128 MeanX= 304.673 MeanY= 302.226 2007 week=25 Period_16days= 10 Y= a +b * X : a= 228.548 b= 0.239472 CC= 0.2181 RMSE=14.5028 MeanX= 304.931 MeanY= 301.570 2007 week=29 Period_16days= 12 Y= a +b * X : a= 209.272 b= 0.300096 CC= 0.2451 RMSE=14.4295 MeanX= 306.248 MeanY= 301.176 2007 week=33 Period_16days= 13 Y= a +b * X : a= 178.282 b= 0.403414 CC= 0.3542 RMSE=13.1113 MeanX= 306.083 MeanY= 301.760 2007 week=37 Period_16days= 15 Y= a +b * X : a= 127.323 b= 0.571546 CC= 0.5454 RMSE=10.8297 MeanX= 306.695 MeanY= 302.613 2007 week=41 Period_16days= 17 Y= a +b * X : a= 101.459 b= 0.654575 CC= 0.6293 RMSE=9.92264 MeanX= 307.011 MeanY= 302.421 2007 week=45 Period_16days= 19 Y= a +b * X : a= 165.323 b= 0.440582 CC= 0.4602 RMSE=12.9090 MeanX= 306.609 MeanY= 300.409 2007 week=49 Period_16days= 20 Y= a +b * X : a= 239.589 b= 0.188876 CC= 0.1702 RMSE=17.1662 MeanX= 306.297 MeanY= 297.441 2008 week=01 Period_16days= 01 Y= a +b * X : a= 43.0053 b= 0.841169 CC= 0.9120 RMSE=7.60723 MeanX= 300.885 MeanY= 296.100 2008 week=05 Period_16days= 01 Y= a +b * X : a= 49.8268 b= 0.818840 CC= 0.8626 RMSE=8.75069 MeanX= 300.885 MeanY= 296.203 2008 week=09 Period_16days= 03 Y= a +b * X : a= 117.217 b= 0.608614 CC= 0.7419 RMSE=10.1017 MeanX= 300.059 MeanY= 299.837 2008 week=13 Period_16days= 05 Y= a +b * X : a= 150.378 b= 0.501853 CC= 0.5972 RMSE=11.6221 MeanX= 301.260 MeanY= 301.566 2008 week=17 Period_16days= 06 Y= a +b * X : a= 184.149 b= 0.392037 CC= 0.4534 RMSE=12.9258 MeanX= 302.058 MeanY= 302.567 2008 week=21 Period_16days= 08 Y= a +b * X : a= 182.810 b= 0.392242 CC= 0.4010 RMSE=12.8668 MeanX= 304.561 MeanY= 302.272 2008 week=25 Period_16days= 10 Y= a +b * X : a= 181.762 b= 0.391248 CC= 0.3618 RMSE=13.8061 MeanX= 306.312 MeanY= 301.605 2008 week=29 Period_16days= 12 Y= a +b * X : a= 171.358 b= 0.425807 CC= 0.3587 RMSE=13.5351 MeanX= 305.921 MeanY= 301.621 2008 week=33 Period_16days= 13 Y= a +b * X : a= 167.552 b= 0.438211 CC= 0.3681 RMSE=12.8075 MeanX= 306.312 MeanY= 301.781 2008 week=37 Period_16days= 15 Y= a +b * X : a= 112.510 b= 0.618292 CC= 0.6035 RMSE=10.3114 MeanX= 307.446 MeanY= 302.601 2008 week=41 Period_16days= 17 Y= a +b * X : a= 112.144 b= 0.618250 CC= 0.6354 RMSE=10.0462 MeanX= 307.093 MeanY= 302.004 2008 week=45 Period_16days= 19 Y= a +b * X : a= 176.144 b= 0.403417 CC= 0.4172 RMSE=13.5759 MeanX= 306.522 MeanY= 299.800 2008 week=49 Period_16days= 20 Y= a +b * X : a= 222.835 b= 0.242706 CC= 0.2266 RMSE=17.3211 MeanX= 306.801 MeanY= 297.297 2009 week=01 Period_16days= 01 Y= a +b * X : a= 51.3125 b= 0.815006 CC= 0.9001 RMSE=7.60747 MeanX= 301.080 MeanY= 296.695 2009 week=05 Period_16days= 01 Y= a +b * X : a= 63.4221 b= 0.777659 CC= 0.8440 RMSE=8.49703 MeanX= 301.080 MeanY= 297.560 2009 week=09 Period_16days= 03 Y= a +b * X : a= 82.2477 b= 0.720927 CC= 0.7551 RMSE=9.38024 MeanX= 301.035 MeanY= 299.272 2009 week=13 Period_16days= 05 Y= a +b * X : a= 99.5626 b= 0.664658 CC= 0.7213 RMSE=9.39408 MeanX= 303.621 MeanY= 301.367 2009 week=17 Period_16days= 06 Y= a +b * X : a= 156.463 b= 0.481107 CC= 0.5080 RMSE=11.3931 MeanX= 303.260 MeanY= 302.363 2009 week=21 Period_16days= 08 Y= a +b * X : a= 195.784 b= 0.351488 CC= 0.3759 RMSE=13.1743 MeanX= 304.278 MeanY= 302.734 2009 week=25 Period_16days= 10 Y= a +b * X : a= 173.789 b= 0.418891 CC= 0.3824 RMSE=13.0229 MeanX= 306.175 MeanY= 302.043 2009 week=29 Period_16days= 12 Y= a +b * X : a= 194.082 b= 0.351682 CC= 0.3129 RMSE=13.8553 MeanX= 306.055 MeanY= 301.716 2009 week=33 Period_16days= 13 Y= a +b * X : a= 179.017 b= 0.402614 CC= 0.3663 RMSE=12.5851 MeanX= 306.574 MeanY= 302.448 2009 week=37 Period_16days= 15 Y= a +b * X : a= 121.277 b= 0.592219 CC= 0.5923 RMSE=9.70392 MeanX= 306.438 MeanY= 302.756 2009 week=41 Period_16days= 17 Y= a +b * X : a= 123.320 b= 0.583304 CC= 0.6292 RMSE=9.72819 MeanX= 306.258 MeanY= 301.961 2009 week=45 Period_16days= 19 Y= a +b * X : a= 181.285 b= 0.386711 CC= 0.4183 RMSE=13.7124 MeanX= 306.873 MeanY= 299.956 2009 week=49 Period_16days= 20 Y= a +b * X : a= 225.782 b= 0.233325 CC= 0.2106 RMSE=17.5751 MeanX= 306.762 MeanY= 297.357 2010 week=01 Period_16days= 01 Y= a +b * X : a= 26.7094 b= 0.897003 CC= 0.9134 RMSE=7.06788 MeanX= 301.439 MeanY= 297.101 2010 week=05 Period_16days= 01 Y= a +b * X : a= 28.7817 b= 0.892429 CC= 0.8878 RMSE=7.38255 MeanX= 301.439 MeanY= 297.794 2010 week=09 Period_16days= 03 Y= a +b * X : a= 69.2281 b= 0.760976 CC= 0.7845 RMSE=9.03015 MeanX= 302.784 MeanY= 299.639 2010 week=13 Period_16days= 05 Y= a +b * X : a= 136.046 b= 0.546376 CC= 0.6355 RMSE=10.7688 MeanX= 302.859 MeanY= 301.520 2010 week=17 Period_16days= 06 Y= a +b * X : a= 180.153 b= 0.400639 CC= 0.4872 RMSE=13.0031 MeanX= 303.918 MeanY= 301.915 2010 week=21 Period_16days= 08 Y= a +b * X : a= 180.852 b= 0.396417 CC= 0.4045 RMSE=13.0654 MeanX= 304.525 MeanY= 301.571 2010 week=25 Period_16days= 10 Y= a +b * X : a= 189.125 b= 0.365208 CC= 0.3190 RMSE=13.9461 MeanX= 305.967 MeanY= 300.866 2010 week=29 Period_16days= 12 Y= a +b * X : a= 191.298 b= 0.356722 CC= 0.3075 RMSE=14.2628 MeanX= 306.152 MeanY= 300.510 2010 week=33 Period_16days= 13 Y= a +b * X : a= 192.423 b= 0.354784 CC= 0.3100 RMSE=13.7773 MeanX= 306.292 MeanY= 301.091 2010 week=37 Period_16days= 15 Y= a +b * X : a= 140.057 b= 0.528802 CC= 0.5215 RMSE=10.8803 MeanX= 306.306 MeanY= 302.032 2010 week=41 Period_16days= 17 Y= a +b * X : a= 126.710 b= 0.570143 CC= 0.6342 RMSE=10.1163 MeanX= 306.947 MeanY= 301.714 2010 week=45 Period_16days= 19 Y= a +b * X : a= 178.043 b= 0.397814 CC= 0.4224 RMSE=12.8457 MeanX= 305.982 MeanY= 299.767 2010 week=49 Period_16days= 20 Y= a +b * X : a= 217.853 b= 0.259901 CC= 0.2585 RMSE=16.1870 MeanX= 306.262 MeanY= 297.451 2011 week=01 Period_16days= 01 Y= a +b * X : a= 48.1796 b= 0.825672 CC= 0.8903 RMSE=7.28257 MeanX= 300.319 MeanY= 296.145 2011 week=05 Period_16days= 01 Y= a +b * X : a= 55.1744 b= 0.802811 CC= 0.8277 RMSE=8.57687 MeanX= 300.319 MeanY= 296.274 2011 week=09 Period_16days= 03 Y= a +b * X : a= 97.9986 b= 0.665464 CC= 0.7392 RMSE=9.84362 MeanX= 300.812 MeanY= 298.178 2011 week=13 Period_16days= 05 Y= a +b * X : a= 126.789 b= 0.575294 CC= 0.6205 RMSE=10.5136 MeanX= 301.411 MeanY= 300.190 2011 week=17 Period_16days= 06 Y= a +b * X : a= 166.066 b= 0.447754 CC= 0.4765 RMSE=11.7373 MeanX= 302.078 MeanY= 301.322 2011 week=21 Period_16days= 08 Y= a +b * X : a= 208.593 b= 0.306560 CC= 0.3130 RMSE=13.5527 MeanX= 303.333 MeanY= 301.583 2011 week=25 Period_16days= 10 Y= a +b * X : a= 175.997 b= 0.411224 CC= 0.3608 RMSE=13.2165 MeanX= 304.681 MeanY= 301.289 2011 week=29 Period_16days= 12 Y= a +b * X : a= 178.680 b= 0.400292 CC= 0.3202 RMSE=13.7935 MeanX= 305.768 MeanY= 301.077 2011 week=33 Period_16days= 13 Y= a +b * X : a= 176.402 b= 0.408189 CC= 0.3494 RMSE=13.2080 MeanX= 306.241 MeanY= 301.406 2011 week=37 Period_16days= 15 Y= a +b * X : a= 140.072 b= 0.527911 CC= 0.5301 RMSE=11.0520 MeanX= 306.566 MeanY= 301.912 2011 week=41 Period_16days= 17 Y= a +b * X : a= 132.573 b= 0.549299 CC= 0.5770 RMSE=10.5066 MeanX= 306.074 MeanY= 300.699 2011 week=45 Period_16days= 19 Y= a +b * X : a= 192.077 b= 0.346182 CC= 0.3598 RMSE=14.7809 MeanX= 306.566 MeanY= 298.205 2011 week=49 Period_16days= 20 Y= a +b * X : a= 242.750 b= 0.172835 CC= 0.1663 RMSE=18.6101 MeanX= 306.932 MeanY= 295.799 2012 week=01 Period_16days= 01 Y= a +b * X : a= 43.2208 b= 0.837525 CC= 0.8995 RMSE=8.28485 MeanX= 301.331 MeanY= 295.593 2012 week=05 Period_16days= 01 Y= a +b * X : a= 42.7038 b= 0.840685 CC= 0.8567 RMSE=8.97122 MeanX= 301.331 MeanY= 296.028 2012 week=09 Period_16days= 03 Y= a +b * X : a= 76.0955 b= 0.736417 CC= 0.7997 RMSE=9.09815 MeanX= 300.784 MeanY= 297.598 2012 week=13 Period_16days= 05 Y= a +b * X : a= 130.914 b= 0.558305 CC= 0.6491 RMSE=10.7363 MeanX= 301.852 MeanY= 299.439 2012 week=17 Period_16days= 06 Y= a +b * X : a= 201.654 b= 0.328107 CC= 0.4144 RMSE=13.6844 MeanX= 302.614 MeanY= 300.943 2012 week=21 Period_16days= 08 Y= a +b * X : a= 193.485 b= 0.355109 CC= 0.3513 RMSE=13.0882 MeanX= 303.277 MeanY= 301.181 2012 week=25 Period_16days= 10 Y= a +b * X : a= 216.985 b= 0.273958 CC= 0.2377 RMSE=14.5292 MeanX= 304.873 MeanY= 300.508 2012 week=29 Period_16days= 12 Y= a +b * X : a= 190.177 b= 0.357257 CC= 0.2926 RMSE=14.8649 MeanX= 306.687 MeanY= 299.743 2012 week=33 Period_16days= 13 Y= a +b * X : a= 178.425 b= 0.395829 CC= 0.3233 RMSE=14.9146 MeanX= 306.587 MeanY= 299.781

More Related